Search Forum
Blog Entry# 860943
Posted: Sep 26 2013 (14:27)
9 Responses
Last Response: Sep 26 2013 (17:27)
9 Responses
Last Response: Sep 26 2013 (17:27)
I have been writing to SCR since 15 months to regularize these kind of trains.
Extend the Link(VSKP KZJ ) till SC and return in & around this slot and get attached to NZM KZJ VSKP @ KZJ so that it can continue as a full fledged train. The dep time can be adjusted to depart after mid night
Extend the Link(VSKP KZJ ) till SC and return in & around this slot and get attached to NZM KZJ VSKP @ KZJ so that it can continue as a full fledged train. The dep time can be adjusted to depart after mid night
7 Public Posts - Thu Sep 26, 2013
I think not possible and NZM-HYD Bound Dakshin express a minimum 3hrs late during winter Season mostly 3 months.
1 Public Posts - Thu Sep 26, 2013