Search Forum
Blog Entry# 922668
Posted: Dec 01 2013 (23:54)
11 Responses
Last Response: Dec 11 2013 (01:17)
11 Responses
Last Response: Dec 11 2013 (01:17)
People of mau should put pressure on the local M.P to get Kaifiyat express to Mau and also to get 15025 Mauanvt exp converted to superfast express running daily in upcoming rail budget it will give mau a super connectivity to Delhi through 3 trains(Kaifiyat, Mauanvt exp, Lichchavi Express) out of which 2 will be superfast.
Mau Anand vihar can be converted to superfast as it halts at stations less than kaifiyat and kaifiyat was initially express train later converted to superfast train.
Mau Anand vihar can be converted to superfast as it halts at stations less than kaifiyat and kaifiyat was initially express train later converted to superfast train.
6 Posts
you r right. my point was that 14511/Nauchandi Express (named after a famous fest in meerut) is a train that starts from meerut after a few coaches and engine comes from saharanpur. whole train stands at meerut few coaches with engine come from saharanpur approximately 30 min before departure from meerut and join the train then the train departs.
i was just checking for options we have...
i was just checking for options we have...
yes...... what u think mau is a younger brother to AMH atleast we can get slip train it wont harm them...
That's not a bad idea. But better option would be to make MAU-ANVT Exp a daily and superfast train and extend upto Delhi or New Delhi. Our MP Dara Singh Chauhan has the capability to do it. Currently what urgently need is . . . .
1. Connection of Azamgarh line to other platforms at Mau Jn.
2. Manual signal system should be replaced by new tech signalling system between MAU-AMH-SHG section.
1. Connection of Azamgarh line to other platforms at Mau Jn.
2. Manual signal system should be replaced by new tech signalling system between MAU-AMH-SHG section.
i already tried
Status as on 11 Dec 2013
Registration Number : MORLY/E/2013/09932
Name Of Complainant : Rohit
Date of Receipt : 03 Dec 2013
Received...
more...
Status as on 11 Dec 2013
Registration Number : MORLY/E/2013/09932
Name Of Complainant : Rohit
Date of Receipt : 03 Dec 2013
Received...
more...