Search Forum
Blog Entry# 926367
Posted: Dec 05 2013 (21:04)
9 Responses
Last Response: Dec 06 2013 (12:34)
9 Responses
Last Response: Dec 06 2013 (12:34)
Dec 05 2013 (21:04) 22109X/Mumbai LTT - Hazrat Nizamuddin AC SF Express
Nashua NH USA
Nashua NH USA 950 blog postsThe latest 22110 disaster seems to indicate this train is beyond repair, at least in its current avatar. Instead of indulging in repeated NCR/WCR bashing, maybe we need to adopt the stance of innocent until proven guilty instead of vice versa :-) This will serve to cool down flared tempers as well. Here are some possible solutions:
1. Upgrade the train to a Rajdhani ASAP. Only then will it get top priority throughout. I don't see why that should be a problem since it has all the ingredients of a Rajdhani - all-AC train connecting Delhi to Mumbai with limited halts and MPS of 130 kmph.
2....
more...
1. Upgrade the train to a Rajdhani ASAP. Only then will it get top priority throughout. I don't see why that should be a problem since it has all the ingredients of a Rajdhani - all-AC train connecting Delhi to Mumbai with limited halts and MPS of 130 kmph.
2....
more...
Rightly said Mani sir. The CR fans of this train could not digest the fact that it is a simple AC Superfast train and not a Rajdhani train. Second, a Rajdhani train will always overtake this even if there is a gap of 30 mins in scheduled departure from NZM to maintain the aggressive TT of Rajdhani class train. Third, since for now this is a AC Superfast, has to travel through different zones, so it is obvious that other zones will show little care to this train then to their own zone trains like Sridham or Gondwana or any train of that kind. Fourth, a WAP7 or WAP4 both will do the same job apart from little difference in acceleration which way a WAP7 can only help this train to gain some 1 or 2 mins from delay but it will not do a 200 kmph blast for sure.
So...
more...
So...
more...
5 Public Posts - Thu Dec 05, 2013
3 Public Posts - Fri Dec 06, 2013