Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

शिव की जटाओं से बहती है शिव गंगा - Divyanshu

Search Forum
<<prev entry    next entry>>
Blog Entry# 979619
Posted: Jan 30 2014 (19:50)

12 Responses
Last Response: Feb 08 2014 (06:50)
General Travel
5912 views
0

Jan 30 2014 (19:50)   13150/Kanchankanya Express (PT) | BNV/Binnaguri (3 PFs)
 
MailguardSG25~
MailguardSG25~   24054 blog posts
Entry# 979619            Tags   Past Edits
fake source..sorry for posting
Translate to English
Translate to Hindi

7 Posts

2506 views
1

Jan 30 2014 (20:21)
Anonymous1218~
Anonymous1218~   22543 blog posts
Re# 979619-8              
M no one!!
Translate to English
Translate to Hindi

2423 views
0

Jan 30 2014 (20:24)
TheRailMail^~
TheRailMail^~   56725 blog posts
Re# 979619-9              
Oh Mere Khuda!! Baksha de Plz :'(
Translate to English
Translate to Hindi

2427 views
0

Jan 30 2014 (20:29)
MailguardSG25~
MailguardSG25~   24054 blog posts
Re# 979619-10              
lagta nahi kisi k pass koi solution hain....I think some elephants should be shifted to Periyar & Mudumalai Sanctuary,those regions having less density of elephants. should be balanced.
Translate to English
Translate to Hindi

2401 views
0

Jan 30 2014 (20:30)
TheRailMail^~
TheRailMail^~   56725 blog posts
Re# 979619-11              
Kuch bhi karo magar jaldi karo... hain nahi to hadd ho gayi hai ab :-|
Translate to English
Translate to Hindi

3108 views
0

Feb 08 2014 (06:50)
nobhonil10   2453 blog posts
Re# 979619-12              
the only solution lies with the WILL POWER of the concerned departments-
-prioritise the sector's need i.e passenger travel and connection to nodal points with good I/C,DEMU,PASSENGER services.but still running long distance trains with good speeds.
-when this single line is burdened with express,special trains consequently the very purpose gets defeated.
-some express trains will definitely be there but should never exceed
...
more...
a limit.
-complete the patch doubling on war footing.
-complete the alternate NQH-MAYNAGURI ROAD JN-NCBD-NCB stretch as fast as possible so that freights can be diverted,some special ex trains can also be tested.
-there was a old line from changrabandha to burnes ghat............restore and have a BG extension from the present..then a bridge is required over teesta;i guess a RAIL ROAD bridge is required....funds can be arranged from Centre,state,railways,ADB....then the line can join the JPG-HALDIBARI stretch...that would be an entire new connection from NJP to Assam........THIS SOLUTION IS OFF COURSE OF A LONG TERM
-the most important is the implementation of technology,infra red night vision cameras,effective co ordination and constant surveillance;installation of CCTV cameras required.......

Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy