Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

For RailFans, the Journey itself is the Destination. - Sreerup Patranabis

Search Forum
Filters:
Page#    10 Blog Entries  next>>
1 Followers
General Travel
108993 views
20

★★★
Mar 10 2016 (09:45)  
 
amit.mint^~
amit.mint^~   6175 blog posts
Entry# 1762409               Past Edits
"This is how Train Stoppages are supposed to be decided"
Source: Factly.
============= ================== ================
Every year, the Ministry of Railways receives numerous requests from State Governments, Members of Parliament etc for addition of new stoppages to existing trains. But how does the Railways decide whether a new stop has to be provisioned? At least in theory, the Railways has a policy based on
...
more...
which a decision on new stoppage is taken.
New Stoppage should recover cost
The Ministry of Railways came up with a new stoppage policy in 2005. This policy was built upon earlier such policies made in 1987,1991 and 1992. Based on the new policy, the following must be considered before any new stoppage is planned or an existing stoppage is to be withdrawn for mail, express and superfast trains.
Cost of Stoppage: The current cost of a stoppage ranges from Rs 12716 to Rs 24506 based on various factors. Any new stoppage should be able to recover such a cost.
A minimum of 40 or more sleeper class tickets per day per train for a distance of 500 km or its equivalent fare in case of other classes of travel, have to be sold to recover the cost.
No new stoppages are to be provided if the trains are passing at odd hours.
No additional stoppages to long distance trains in suburban sections.
No additional stoppages in sections with a capacity utilization of more than 90%.
The costs have to be calculated based on the existing fares for various classes.
Other Criteria to be considered
In addition to the above, the following criteria should be also considered before deciding on any new stoppage or withdrawal of an existing stoppage.
Total sale of tickets at the station for both UP & DOWN direction for all the trains already stopping at the station, distance wise, class-wise & cost-wise
Trains already stopping, availability of alternative services, convenience & occupancy of the existing services
Effect on line capacity of the section and punctuality of trains
Population & significance of towns/cities & new developments taking place
Nature of the train & occupancy of the train for which stoppage is demanded
Operational constraints etc.
Pattern of traffic at the station
Passing time of the train at the station.
New stoppage to be approved along with withdrawal of an existing stoppage
The Railways in 2006 realized that there is going to be no end to the demand for additional stoppages for express and superfast trains. It also realized that extra stoppages will have adverse impact on the operational utilization and line capacity. Hence it proposed that all Zones proposing new stops should also propose an existing stop for withdrawal where the patronization of the train is least.

Translate to English
Translate to Hindi

2 Public Posts - Thu Mar 10, 2016

1 Public Posts - Fri Mar 11, 2016

1 Public Posts - Sat Mar 12, 2016

1 Public Posts - Sun Mar 27, 2016

1 Public Posts - Thu May 19, 2016

1 Public Posts - Sat May 21, 2016

39601 views
2

May 21 2016 (13:52)
s5sahil~
s5sahil~   13529 blog posts
Re# 1762409-9               Past Edits
Aur agar Stoppage na miley to hum Gazipur se direct Delhi/Mumbai/Chennai ko train chalwa dete hain. #Oops #sorry #sarcasm :D
Translate to English
Translate to Hindi

2 Public Posts - Sat May 21, 2016
Rail Anecdote/Joke
22763 views
10

Nov 11 2014 (14:27)  
 
s5sahil~
s5sahil~   13529 blog posts
Entry# 1273457              
IRI = Daily Soap = More Anticipation = Better than ever.
#Oops
Translate to English
Translate to Hindi

1 Public Posts - Tue Nov 11, 2014

13448 views
2

Nov 11 2014 (17:07)
s5sahil~
s5sahil~   13529 blog posts
Re# 1273457-2              
Ek dhamakedaar episode abhi khatam hua, waiting for next one.
Bhaiya, 24 ghante entertainment hai yahaan.
#Oops
Translate to English
Translate to Hindi

1 Public Posts - Tue Nov 11, 2014

13495 views
0

Nov 11 2014 (17:49)
s5sahil~
s5sahil~   13529 blog posts
Re# 1273457-4              
One more entertaining episode over.
Ready for the next one.
#Oops
Translate to English
Translate to Hindi

8 Public Posts - Tue Nov 11, 2014

14994 views
0

Nov 14 2014 (19:18)
DQisthebest
DQisthebest   788 blog posts
Re# 1273457-20              
August kranti and Sampark kranti lol...
#oops
Translate to English
Translate to Hindi

1 Public Posts - Wed Nov 19, 2014
PREDICTIONS: 31
confirm: 94%
rac: 0%
wl: 6%
Journey: Sun Mar 31, 2013
Dep: AK/Akola Junction @ 14:50 PF#: 2
Arr: ROU/Rourkela Junction @ 05:45 +1 night
Distance: 971 km / 1963 km
Class: Sleeper - SL   |   Tot Seats: Avbl-0082#   |   Charting @22:40
12859/Gitanjali Express (PT)
PNR: 856-xxxxxxx   |   Similar PNRs
Entry# 708747
 
NO PENDING REQUEST
Posted: Mar 30 2013 (12:08:06)  View Posted Status
Passenger 1: Waitlist# 4 (Booking Status: W/L 4,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status: Mar 31 2013 (14:36:40) 
Passenger 1: S4,12 (Booking Status: W/L 4,CK)
Chart PREPARED

2 Public Posts - Sun Mar 31, 2013

12360 views
1

Mar 31 2013 (12:41)
Rang De Basanti^   58953 blog posts
Re# 708747-3              
@708747-2  @guest
#OOPs.
But anyway, good for passenger.
Translate to English
Translate to Hindi

1 Public Posts - Mon Apr 01, 2013
PREDICTIONS: 29
confirm: 97%
rac: 0%
wl: 3%
Journey: Sat Mar 30, 2013
Dep: RC/Raichur Junction @ 21:40 PF#: 1
Arr: SBC/KSR Bengaluru City Junction (Bangalore) @ 05:20 +1 night
Distance: 416 km / 2367 km
Class: AC 3-tier - 3A   |   Tot Seats: Avbl-0003#
22692/Hazrat Nizamuddin - K.S.R. Bengaluru Rajdhani Express
PNR: 224-xxxxxxx   |   Similar PNRs
Entry# 708450
 
NO PENDING REQUEST
Posted: Mar 29 2013 (22:33:45)  View Posted Status
Passenger 2: Waitlist# 2 (Booking Status: W/L 2,RLGN)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status: Mar 30 2013 (19:36:43) 
Passenger 2: Waitlist# 2 (Booking Status: W/L 2,RLGN)
Chart PREPARED

3 Public Posts - Sat Mar 30, 2013

11937 views
0

Mar 30 2013 (19:37)
Rang De Basanti^   58953 blog posts
Re# 708450-4              
@708450-3  @guest

2 Public Posts - Sat Mar 30, 2013
PREDICTIONS: 34
confirm: 100%
rac: 0%
wl: 0%
Journey: Sun Mar 24, 2013
Dep: MAS/MGR Chennai Central @ 23:35 PF#: 7
Arr: GKP/Gorakhpur Junction @ 15:20 +2 night
Distance: 2337 km / 3236 km
Class: AC 3-tier - 3A   |   Tot Seats: Avbl-0049#   |   Charting @19:35
12512/Kochuveli - Gorakhpur Rapti Sagar SF Express (PT)
PNR: 470-xxxxxxx   |   Similar PNRs
Entry# 702187
NO PENDING REQUEST
Posted: Mar 23 2013 (10:14:06)  View Posted Status
Passenger 1: Waitlist# 2 (Booking Status: W/L 2,CK)
Chart NOT Prepared

Please analyze this PNR, and predict the final Charting Status. Thanks.

Latest Status: Mar 24 2013 (19:45:56) 
Passenger 1: Waitlist# 1 (Booking Status: W/L 2,CK)
Chart PREPARED

1 Public Posts - Sun Mar 24, 2013

11432 views
0

Mar 24 2013 (21:24)
Rang De Basanti^   58953 blog posts
Re# 702187-2              

2 Public Posts - Sun Mar 24, 2013
Page#    10 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy