Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

WAP-7 - तेरे जैसा यार कहाँ , कहाँ ऐसा याराना , याद करेगी दुनियां तेरा मेरा अफसाना. - Arjun Rai

Search Forum
Filters:
Page#    12 Blog Entries  next>>
Rail Fanning
224004 views
7

Jun 23 2022 (20:24)   15722/Paharia Express (PT) | NJP/New Jalpaiguri Junction (8 PFs) | SGUJ/WDP-4/20051
NFRailEnthusiasts^~
NFRailEnthusiasts^~   8821 blog posts
Entry# 5387944            Tags   Past Edits
Siliguri / SGUJ WDP4 #20051 with
15722 #NewJalpaiguri - #Digha #PahariaExpress standing on PF 2 at #NJP
.
.
.
D.O.C.
...
more...

Translate to English
Translate to Hindi
Rail Fanning
125589 views
5

Jun 22 2022 (12:16)   SGUJ/Siliguri Junction (5 PFs) | SGUJ/WDP-4/20070
NFRailEnthusiasts^~
NFRailEnthusiasts^~   8821 blog posts
Entry# 5386610            Tags   Past Edits
Freshly Painted
Siliguri/SGUJ WDP4 #20070 standing as Light Engine...
.
.
Note: Only the cab end and the hood sides were painted when i clicked these photos.
.
...
more...

Translate to English
Translate to Hindi
Info Update
38452 views
8

Feb 29 2020 (00:24)   GMO/NSCB Junction Gomoh (6 PFs)
KhagariaJn^~
KhagariaJn^~   63459 blog posts
Entry# 4579495            Tags  
#ECR_In_Pictures
गोमो स्थित इलेक्ट्रिक लोको शेड में वर्ष 2019-20 में कमीशन किया जाने वाला 100वां लोको (सफेद) एवं 15वां जीटीओ से आईजीबीटी प्रोपल्शन कन्वर्टेड लोको (हरा)।
click here
#GM_ECR_AnnualInspection
आज महाप्रबंधक श्री ललित
...
more...
चंद्र त्रिवेदी द्वारा गोमो स्थित इलेक्ट्रिक लोको शेड के वार्षिक निरीक्षण के दौरान वहां वित्तीय वर्ष 2019-20 में कमीशन किए गए 100वें लोको एवं 15वें आईजीबीटी प्रोपल्शन कन्वर्टेड लोको का फ्लैग ऑफ किया गया।
click here

Translate to English
Translate to Hindi
General Travel
42914 views
8

Dec 22 2018 (09:50)   UDZ/Udaipur City (5 PFs)
susmits~
susmits~   337 blog posts
Entry# 4134342            Tags   Past Edits
Electrification Update, Mavli Junction to Udaipur.

1. Electrification outside Mavli. The traction substation is fully set up (expect pics later this week!) and the junction itself is well wired.
2. Sectioning post just before Bhimal.
3.
...
more...
Lines leading into Bhimal.
4. Lines through Bhimal. Being a one platform station, it's wired using two poles, rather than a spanning portal.
5-9. The state of Khemli. Wires, but no catenaries yet. Lots of work remaining to be done. For some reason, the ICD is not being wired; I also saw this at Taj Nagar and Garhi Harsaru on the GGN-RE section. What's up with that?
10-12. The route between Khemli and Debari. Bare poles in some places, no poles for about five kilometers (including the cutting near Debari, not pictured here). Plenty of work remaining. In the distance, the mountain wall of Udaipur.
13-14. The curve preceding Debari. Poles and tubular supports, no wire.
15. Looking back towards Khemli from the curve.
16-18. The state of Debari. Most of the portals are done. Tubular supports, but no wires yet.
19-20. The Debari flyover, National Highway 48. No poles, and not even foundation work in much of the region. Not pictured: the cutting and 1:110 grade section below Ashapura Mata Mandir, where there's no work done. At the far end, there are some foundations, and a sectioning post in the very early stages of construction.
21. Poles resume 1 kilometer before RPZ, near the grid substation and Transport Nagar - Bhuwana bypass flyover.

Translate to English
Translate to Hindi

9 Public Posts - Sat Dec 22, 2018

36602 views
1

Dec 22 2018 (13:58)
Love114~
Love114~   1571 blog posts
Re# 4134342-10              
udaipur-ajmer Electrification inspection to #GM.
Translate to English
Translate to Hindi

1 Public Posts - Sat Dec 22, 2018
Social
58823 views
1

Apr 19 2018 (21:57)  
BikramKumarBeCo~   300 blog posts
Entry# 3322272              
Photo-1: I had filed a #Public_Grievance in #CPGRAMS Portal regarding the non-functional Twitter Account of #GM_NFR.
Photo-2: The reply I received from the system.
Instead of making the Twitter Account functional, the system is giving lame excuses...
Link of my tweet- click here
Translate to English
Translate to Hindi
Page#    12 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy