Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Vaishali Express - जितना सुंदर तुम्हारा नाम उतनी सुंदर तुम्हारी चाल - be my valentine - Rahul Vatsa

Search Forum
Filters:
Page#    7 Blog Entries  next>>
General Travel
159392 views
0

Aug 06 2023 (13:03)   458S/Purna Mhow Fast Passenger (UnReserved) | DADN/Dr. Ambedkar Nagar (Mhow) (3 PFs)
SonOfGalaxy
SonOfGalaxy   179 blog posts
Entry# 5791822            Tags  
#Admin #Moderator #FM
Please update the new route alignment in #map as per survey done by #RITES for #mhow #patalpani #balwara #sanawad #omkareshwar GC project

#ratlam #indore #mhow #dadn #khandwa #akot #akola #gc #project #wr #railway
Translate to English
Translate to Hindi

1 Public Posts - Sun Aug 06, 2023
General Travel
59061 views
1

Jul 13 2023 (16:08)   09173/Dr. Ambedkar Nagar - Omkareshwar Road MG Passenger Special (UnReserved) | DADN/Dr. Ambedkar Nagar (Mhow) (3 PFs)
SonOfGalaxy
SonOfGalaxy   179 blog posts
Entry# 5775402            Tags  
1 compliments
Useful
WR Railway Project - #Ratlam #Indore #Mhow Sanawad GC Target

(Rau - Mhow) DL 9.51 Km - Dec 23 (work in progress).

(Mhow- Patalpani) 5.51 km -
...
more...
Dec 23 (work in progress, mg track removed).

(#Sanawad - #Omakareshwar) 5.40 km - Jan 24 (work in progress, mg track removeing now).

(Muktiyara - Omakareshwar) 20.7 Km - Oct 24 (work in progress, narmada river bridge work in under construction).

(#Patalpani- Muktiyara) 64.97 Km - Mar 26 - FLS Survey Done by #RITES. Forest Land Proposal sent. 4 km tunnel tender is under process.

Forest Land Proposal : FP/MP/RAIL/427846/2023

Clearance Type: Form-A (Part-I): Diversion of Forest Land
CAF No. : CAF/124916/2023
S/W No.: SW/127736/2023

Dr. Ambedkar Nagar (Exculding yard) to muktiyara balwara (Exculding yard) for Existing/new detour BG line in connection with Gauge conversion of existing Ratlam #Khandwa MG section of western Railway


Area: 289.015 ha

Category : Railway

Date of Submission: 07/06/2023

Pending at UA due to EDS by MS after PSC-I

Regards,
Mohit Saxena
SonOfGalaxy

Translate to English
Translate to Hindi
General Travel
128066 views
1

Feb 04 2023 (21:32)   DADN/Dr. Ambedkar Nagar (Mhow) (3 PFs)
SonOfGalaxy
SonOfGalaxy   179 blog posts
Entry# 5621551            Tags  
according to information received, there are about 50-meter gauge passenger coaches in the loco yard of Mhow, out of which about 10 are completely damaged.

They will remain in the railway yard for dismantling and the other 40 coaches will be stationed on the meter gauge rail line going from #Mhow to #Patalpani.

Thereafter,
...
more...
the meter gauge lines will be uprooted, after which the work to lay the broad gauge line will start. Railway sources say that meter gauge coaches will be shifted in two days.

#ratlam #indore #dadn #khandwa #akot #akola #sanawad #gc

Translate to English
Translate to Hindi
General Travel
106103 views
3

Jan 12 2023 (04:29)   09173/Dr. Ambedkar Nagar - Omkareshwar Road MG Passenger Special (UnReserved) | DADN/Dr. Ambedkar Nagar (Mhow) (3 PFs)
SonOfGalaxy
SonOfGalaxy   179 blog posts
Entry# 5598726            Tags  
Mhow Omkareshwar MG train will stop from 1 Feb 2023 and Mhow Sanawad GC project will be start now!

Hoping 888 crs budget will not lapse!

This GC will take 4 years time
...
more...
as per WR, but it may take 5-7 years time based on Railways construction speed and Ratlam division engineers skills to take back side advantage of making money from this project tenders.

Ratlam division engineers are known for their great skills, created tunnel on plan area: They have proposed a #tihi tunnel on Indore Dahod railway line on plan area. it's really great 😃, Modi ji should give awards to such cost increasing engineers!!!

There are around 12 tunnels need to be created in this section, length of this Mhow Sanawad section will be around 110 km based on new diverted route survey done by RITES.

Heritage Train will be continued on Saturday and Sunday and its maintenance will be done at #Patalpani Station. Currently new small 6 coaches MG platform is developed at Mhow towards Patalpani side to keep running Heritage Train in future. Mhow's Existing platform no 1 will be start to converted it into BG soon.

Khandwa Sanawad passenger train will be started soon.

#ratlam #mhow #indore #sanawad #khandwa #akola #akot

Translate to English
Translate to Hindi

3 Public Posts - Thu Jan 12, 2023
General Travel
52869 views
2

Jan 01 2019 (20:41)   52965/Patalpani - Kalakund Heritage Train | KKD/Kalakund (2 PFs)
nimorailworld~
nimorailworld~   837 blog posts
Entry# 4180114            Tags   Past Edits
video: click here
#patalpani #kalakund #heritagetrain
Patalpani Kalakund Heritage train
Full journey.
It was Christmas day and we railfans came to take first heritage ride from all over India.
Many
...
more...
of us were meeting for the first time.
We met at MHOW railway station. Some of us were waiting at ticket counter right from 7 am though train ride was at 11 AM.
We bought tickets.We had Poha(riceflakes) in breakfast.
Special rakes were shunted by normal locomotive then nicely decorated locomotive came and got attached.
Many railway official, media person and other passengers are seen in the video.
locomotive was getting decorated.
We started train journey at 1105.
It was nice journey with on board narration by railway official.
Train was having rear camera which gives back side view.
Train was equipped with pantry having coffee machine and snacks.
Washroom was clean and tidy.
We reached Patalpani station where we took 20 minutes break.We waited for crossing opposite train. Token exchange can be seen in the video. Semaphore signals adds more beauty to meter gauge journey.
We left for Patalpani waterfall where we took around 40 minutes break.
we had sugarcane juice there.It was hot day but climate was pleasant.
Next we started to Kalakund. In between Choral river and bridges over that can be seen. Bridge and tunnels are very scenic on this route.
Train moves through rural India which shows real countryside.
Bridge shown in video in rebuilded as old bridge is damaged.
Finally we reached Kalakund station where kalakand (कलाकंद) is famous.
Here we halted for 2.5 hours.
cost for ride is INR 120 one way including complementary tea/ coffee.
Stay tuned for next part.
It was best journey in 2018.
Wish you happy new year.

Translate to English
Translate to Hindi
Page#    7 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy