Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

हम RailFan - हमेशा पंखों पे

Search Forum
Post PNR

11957/Σ HATIA-VSKP-BZA-TPTY-KPD-CBE-TVC biweekly ΣChain


Created: Dec 21 2012 (11:54) by Ashwin Kumar M A

Description/Uses/Merits of this ΣChain
--- Return chain connecting HATIA with CBE&TVC through VSKP,BZA,TPTY,SRR,ERN with a single transfer at GDR for which sufficient timings has provided ...

00


ΣChain Blog

Page#    Showing 41 to 45 of 1751 blog entries  <<prev  next>>
1 Followers
General Travel
603441 views
7

Jan 23 (20:17)   17230/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
reddylohith22~
reddylohith22~   692 blog posts
Entry# 5950311            Tags   Past Edits
𝐋𝐈𝐅𝐄𝐋𝐎𝐍𝐆 𝐈𝐂𝐅 𝐄𝐗𝐏𝐑𝐄𝐒𝐒 𝐎𝐅 𝐈𝐍𝐃𝐈𝐀𝐍 𝐑𝐀𝐈𝐋𝐖𝐀𝐘𝐒
𝟏𝟕𝟐𝟐𝟗/𝟏𝟕𝟐𝟑𝟎
Sabari Express so called "Joker of Both SCR and SR". Such a great train of IR which runs daily between the City of Nizams and Gods own country by covering a dist of 1555km and one of the highest revenue generating trains of both the zone's but still the "train is ICF", Good point about this train is It literally cant survive without RSA. Its always a "inky pinky ponky" for both zones for making it LHB because of ODD arrival at its Home station. Even
...
more...
the officials are Least bothered for this train.
If Both zones really have a concern regarding the train why arent they changing its timings and schedule and arrange a suitable RSA. no no one is cared about it, the reason for low occupancy of SC TPTY padmavathi is just because of its worst OEM done after the sabari returning from TVC, RSA should be reasonable. Lets hope that atleast in this year 2024 It will get LHB.

Translate to English
Translate to Hindi

3 Posts

64588 views
0

Feb 03 (03:32)
Railfan_SRDiv^~
Railfan_SRDiv^~   2641 blog posts
Re# 5950311-4              
SCR requested SR to take the train to TVC div change timing speed it up make it SF by bypassing SRR ; SR is least bothered to take any train.

I felt it used to better when it was with Narsarpur express now its more bad with padma ; cause the PM happens less in a week. I hope they break the RSA make this dedicated train.
Translate to English
Translate to Hindi

66970 views
1

Feb 03 (03:55)
FalaknumaSF~
FalaknumaSF~   4459 blog posts
Re# 5950311-5              
NS, CCT/COA, MTM, all these depots do top notch maintenance of their trains. Sabari rarely used to be delayed because of it's slack filled schedule but that changed with maintenance works in SR after a derailment. The delays started from then onwards and it used to run 2 hrs late on a daily basis and used to trail 16382 back then which had a much slower schedule than this, which added up more delay. HYB wouldn't bother with the delay as they used to send the same rake as 17256, which affected it's maintenance. Not sure how NS talked out of this arrangement and now maintenance of Sabari is in the hands of TPTY. TPTY isn't the best when it comes to maintenance. Falcon used to have RSA with Narayanadri, maintenance was horrible even then.
Translate to English
Translate to Hindi

1 Posts

59800 views
0

Feb 04 (20:14)
Railfan_SRDiv^~
Railfan_SRDiv^~   2641 blog posts
Re# 5950311-7               Past Edits
Narayanadri became more worse now cause of its new RSA and less standing time at Lingampalli. SR is too lazy enough to take any trains.

I think its better if they speed up Sabari and could give better RSA than present RSA. It requires only 3 rakes. SR or SCR could operate it as individual train if they think so. After all its the only dedicated train between Keralas state capital that connects with Hyd
Translate to English
Translate to Hindi

57616 views
0

Feb 04 (21:26)
StarcAndRussellWillDefeat
StarcAndRussellWillDefeat   1680 blog posts
Re# 5950311-8              
1 compliments
Disagree:can't expect it to come aodd times
it must be speeded up. 17230:- SC 23.45; 282 GNT 04.35/45; 307 TEL 05.15/17; 415 OGL 06.47/49; 531 NLR 08.28/30; 569 GDR 09.27/32; 652 RU 10.55/11.05; 662 TPTY 11.20/25; 767 KPD 13.26/31; 851 JTJ 14.53/55; 1131 CBE 19.35/45; 1334 ERN 23.40/50; 1490 QLN 02.50/55; 1555 TVC 04.10|| 17229:- TVC 08.55; TPTY 01.45; SC 13.20|| 1555 kms in 28 hrs 25 mins @ 54 kph.
Translate to English
Translate to Hindi

60600 views
1

Feb 04 (22:17)
FalaknumaSF~
FalaknumaSF~   4459 blog posts
Re# 5950311-9               Past Edits
I would say no matter how much SCR speeds it up it will go up to 28 hrs, with less TAT on either side of its terminal, which will delay the train horribly in case of diversion. It will result in higher cancellation. Rather they should speed it up reasonably and maybe extend it to Nanded with PM at NED with General Quota upto charlapalli, which will be the only connection from NED, NZB to southern AP. 4 rakes will be needed anyway and that will guarantee it. Then in that case, Sabari can simply run upto Kanyakumari in case of space issues at TVC.
Translate to English
Translate to Hindi
Rail News
187988 views
1

New/Special Trains
Apr 29 (19:47)   Train Schedule Changes in Bengaluru and Karnataka for May 2024

Exynos9611~   19517 news posts
Entry# 6047934   News Entry# 550297         Tags   Past Edits
Railway News: ಬೆಂಗಳೂರು ಬಿಲಾಸ್‌ಪುರಕ್ಕೆ ವಿಶೇಷ ಬೇಸಿಗೆ ರೈಲು, ಮೇ ತಿಂಗಳ ಹಲವು ರೈಲುಗಳ ಸಂಚಾರದಲ್ಲಿ ವ್ಯತ್ಯಯ

There will be changes in the train schedules for various routes originating from Bengaluru and Karnataka in May. A special train service has been introduced between Bengaluru and Bilaspur to cater to the increased demand during summer. Several trains passing through Bengaluru will also experience delays and route changes. The Bilaspur-Yesvantpur-Bilaspur...
more...
Express (train numbers 08291 and 08292) will run 20 trips, with specific departure and arrival dates and times. This train will stop at several stations including Bilaspur, Bhatpara, Raipur, and reach Yesvantpur in three days. Additionally, some trains have been partially canceled due to maintenance work, while others have altered routes. Several trains have been rescheduled with varying delays. The article also lists trains that will be delayed by a certain number of minutes during the month of May.

May mein Bengaluru aur Karnataka se jaane waale aur aane waale kai trains ke schedule mein badlaav hoga. Summer mein demand zyada hone ke wajah se Bengaluru aur Bilaspur ke beech ek special train service start ki gayi hai. Bengaluru se jaane waale kai trains mein bhi der aur route changes...
more...
honge. Bilaspur-Yesvantpur-Bilaspur Express (train numbers 08291 aur 08292) 20 trips karega, aur uske departure aur arrival dates aur times fix hai. Ye train Bilaspur, Bhatpara, Raipur jaise kai stations pe rukega aur teen din mein Yesvantpur pahunchega. Iske alawa, kuchh trains ko maintenance kaam ki wajah se partially cancel kiya gaya hai, aur kuchh ne apna route change kiya hai. Kai trains ko reschedule kiya gaya hai aur unmein different delays honge. Article mein aise trains ki list bhi hai jo May mein certain number of minutes tak delayed honge.
Rail News
52132 views
0

IR Affairs
SER/South Eastern
Apr 27 (23:09)   7 Express Trains Diverted Due to Development Work in Vijayawada Railway Division

AdittyaaSharma^~   73628 news posts
Entry# 6046182   News Entry# 550138         Tags   Past Edits
रेल विकास के कारण सात एक्सप्रेस ट्रेनों के मार्ग बदले

Due to development work in Vijayawada Railway Division from April 29th to May 26th, 7 express trains passing through Chakradharpur Railway Division will be diverted. The affected trains and their revised routes are as follows: * **Train No. 12376 (Jasidih-Tambaram Weekly Superfast Express):** Departs Jasidih on 01, 08, 15, and...
more...
22 May, will take the diverted route via Niddavolu, Bhimavaram, Gudiwada, Vijayawada to reach Bengaluru. * **Train No. 18111 (Tatanagar-Yesvantpur Weekly Express):** Departs Tatanagar on 02, 09, 16, and 23 May, will take the diverted route via Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada to reach Yesvantpur. * **Train No. 12889 (Tatanagar-Sir M. Visvesvaraya Terminal Bengaluru Superfast Express):** Departs Tatanagar on 03, 10, 17, and 24 May, will take the diverted route via Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada to reach Bengaluru. * **Train No. 18637 (Hatia - Sir M. Visvesvaraya Terminal Bengaluru Weekly Express):** Departs Hatia on 04, 11, 18, and 25 May, will take the diverted route via Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada to reach Bengaluru. * **Train No. 13351 (Dhanbad Alleppey Express):** Departs Dhanbad from April 29th to May 26th, will take the diverted route via Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada to reach Alleppey. * **Train No. 22837 (Hatia-Ernakulam Dharti Aba Express):** Departs Hatia on April 29th, 06, 13, and 20 May, will take the diverted route via Niddavolu, Bhimavaram, Gudiwada, Vijayawada to reach Ernakulam. * **Train No. 12835 (Hatia-Sir M. Visvesvaraya Terminal Bengaluru Weekly Express):** Departs Hatia on April 30th, 05, 07, 12, 14, 19, 21, and 26 May, will take the diverted route via Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada to reach Bengaluru.

Vijayawada Railway Division mein April 29th se May 26th tak rail vikas kaam chal raha hai. Iske wajah se, Chakradharpur Railway Division se jaane wali 7 express trains ko alag-alag tarikhon mein badla hua route se chalaya jaayega. Affected trains aur unka badla hua route yeh hai: * Train No. 12376...
more...
(Jasidih-Tambaram Weekly Superfast Express): 01, 08, 15, aur 22 May ko Jasidih se chali, Niddavolu, Bhimavaram, Gudiwada, Vijayawada se Bengaluru jaayegi. * Train No. 18111 (Tatanagar-Yesvantpur Weekly Express): 02, 09, 16, aur 23 May ko Tatanagar se chali, Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada se Yesvantpur jaayegi. * Train No. 12889 (Tatanagar-Sir M. Visvesvaraya Terminal Bengaluru Superfast Express): 03, 10, 17, aur 24 May ko Tatanagar se chali, Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada se Bengaluru jaayegi. * Train No. 18637 (Hatia - Sir M. Visvesvaraya Terminal Bengaluru Weekly Express): 04, 11, 18, aur 25 May ko Hatia se chali, Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada se Bengaluru jaayegi. * Train No. 13351 (Dhanbad Alleppey Express): April 29th se May 26th tak Dhanbad se chali, Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada se Alleppey jaayegi. * Train No. 22837 (Hatia-Ernakulam Dharti Aba Express): April 29th, 06, 13, aur 20 May ko Hatia se chali, Niddavolu, Bhimavaram, Gudiwada, Vijayawada se Ernakulam jaayegi. * Train No. 12835 (Hatia-Sir M. Visvesvaraya Terminal Bengaluru Weekly Express): April 30th, 05, 07, 12, 14, 19, 21, aur 26 May ko Hatia se chali, Niddavolu, Bhimavaram Town, Gudiwada, Vijayawada se Bengaluru jaayegi.
General Travel
243353 views
1

Mar 31 (19:16)   20642/Coimbatore - Bengaluru Cantt. Vande Bharat Express | ED/Erode Junction (4 PFs)
Gokul_Bas~
Gokul_Bas~   1859 blog posts
Entry# 6015095            Tags   Past Edits
Trains at Erode Junction.... A video taken long back...
Translate to English
Translate to Hindi
General Travel
34313 views
0

Mar 27 (18:26)   17230/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
Rk Balaji
Rk Balaji   113 blog posts
Entry# 6010802            Tags  
PLEASE NOTE:TRAIN NO.17230 FROM SC TO TVC EXPR.LEAVING SC ON 29.03.24 TO 01.04.24 IS RESCHEDULED TO LEAVE SC AT 13:20 HRS INSTEAD OF 12:20 HRS CRIS.IR
Translate to English
Translate to Hindi
Page#    Showing 41 to 45 of 1751 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy