Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

शिव की जटाओं से बहती है शिव गंगा - Divyanshu

Search Forum
Post PNR

18292/Σ Kishanganj- Barsoi- Asansol- Hyderabad (Catch 2nd train 12713 at Vijayawada, AP) ΣChain


Created: Feb 02 2014 (23:12) by Bodhgaya

Description/Uses/Merits of this ΣChain
via Kamakhya- Kishanganj- Barsoi- Malda- Asansol- Hijli- Bhubaneswar- Vizianagaram - VIJAYAWADA [CHANGE TRAIN HERE] - Warangal- Secunderabad.

00


ΣChain Blog

Page#    Showing 11 to 15 of 374 blog entries  <<prev  next>>
General Travel
59212 views
7

Nov 25 2023 (11:34)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
NaagendraV
NaagendraV   332 blog posts
Entry# 5893062            Tags   Past Edits
1 compliments
Useful
List of new railway line/ routes at various states in SCR 2023-24.
-----------------------------------------------------------------------------------------------------------------------
SCR - Andhra Pradesh*************************

Preliminary Engineering cum Traffic Survey for byepass line connecting Vijayawada-Machilipatnam
section
...
more...
to (Vijayawada--Gudur section for Visakhapatnam traffic bound for Chennai and viceversa and thus avoiding Vijayawada Jn. (49 km)

Reconnaissance Engineering cum Traffic Survey for new line between Darsi and Narsaraopet (65 km)
Reconnaissance Engineering cum Traffic Survey for new line between Narsapur-Machhlipatnam ( 85km )
Reconnaissance Engineering cum Traffic Survey for Dharmavaram-Bellari new line (120 km)
Reconnaissance Engineering cum Traffic Survey for Mantralayam Road-Kurnool new line (110 km)

Final Location Survey for new line between Vijayawada- Guntur via Amaravati (106 km)
Final Location Survey for Doubling of Dharmavaram – Pakala – Katpadi (290 Km)
Final Location Survey for Doubling of Guntur – Bibinagar (248 Km)
RET survey for Muddanuru-Mudigubba new line (65Km)
Final Location Survey for doubling of Gooty-Pendakallu line (29 Km)
Final Location Survey for doubling of Pakala-Tirupatiline (42 Km)
Final Location Survey for proposed tripling bet. OBVP GTL
Final Location Survey for tripling between Renigunta-Gudur
Final location survey for tripling between Samalkot and Nidadavolu (72 Km)
Final Location Survey for 3rd line between BZA-NDD
Final Location Survey for Doubling Nallapadu-Krishna Canal (3rd and 4th Line) (33.62 kms.)
Final Location Survey for 3rd line between Vijayawada and Duvvada (335 km)

-----------------------------------------------------------------------------------------------------------------------------

SCR -Telangana: ************************************
1.Preliminary Engineering cum Traffic Survey for new line betwen Bodhan-Bidar (100 km)
2.Preliminary Engineering cum Traffic survey for third line between Secunderabad-Kazipet (134 km)
3.Preliminary Engineering cum Traffic Survey for doubling of Parbhani to Parli (67 km)
4.Preliminary Engineering cum Traffic Survey for byepass line at Purna (3 km)
5.Preliminary Engineering cum Traffic Survey for doubling of Secunderabad- Mudkhed- Adilabad (420km)
6.Preliminary Engineering cum Traffic Survey for Balharshah-Kazipet 4th line (234 km)
7.Preliminary Engineering cum Traffic Survey for Kazipet- Vizayawada 4th line (219 km) --

8.Reconnaissance Engineering cum Traffic Survey for Siddipet - Akkanapet (50 km)
9.Reconnaissance Engineering cum Traffic Survey for new line between Mancherail - Adilabad via Utrfoor (186 km)
10.Reconnaissance Engineering cum Traffic Survey for new line of Dornakal - Miryalguda (133 km)
11.Reconnaissance Engineering cum Traffic Survey for new line between Ghanpur and Surya via Palakutri, Kodakandla (170 km)
12.Reconnaissance Engineering cum Traffic Survey for new line between Kothagudem and Kirandul (180 km)
13.Reconnaissance Engineering cum Traffic Survey for new line between Bodhan - Biloli- Mudkhed-Jalkot- Latur Road (130 km)
14.Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantiji, Pandharkavadan, Chankha (100 km)
15.Reconnaissance Engineering cum Traffic Survey for new line between Patancheru - Sangareddy - Jogipet - Medak (95 km)
16.Reconnaissance Engineering cum Traffic Survey for new line between Nizamabad-Nirmal-Adilabad (125 km)
17.Reconnaissance Engineering cum Traffic Survey for new line between Manakondur - Huzurabad and Elkaturchi (60 km)
18.Reconnaissance Engineering cum Traffic Survey for new line between Karkheli-Narsi (30 km)
19.Reconnaissance Engineering cum Traffic Survey for new line between Bijapur and Warangal (288 km)
20Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantji- Pandharkavda-Chanakha (100 km)

21.Final Location Survey for new line between Bidar and Nanded (155 km)
22.Final Location Survey for doubling of Moulali-Sanathnagar line (21 Km)
23.Final Location Survey for doublin of Motamari- Vishnupuram line (89 Km)
24.Final Location Survey for Doubling of Dornakal-Manuguru line (104 Km)
25.Final Location Survey for Doubling betwwen Aurangabad and Ankai (98 Km) with bypass at Ankai
26.Final Location Survey for Doubling Secunderabad (SC)-Sanathnagar (S.NoF) 3rd line (19.18 kms.)
27.Final Location Survey for Doubling Secunderabad - Kazipet (85.48 kms.
28.Final Location Survey for Doubling Shankarpalli- Chittaguda (3rd and 4th Line) (19.22 kms.)
29.Final Location Survey for Doubling Sulehalli-Malkhaidroad (3rd and 4th Line) (17.18 kms.)
30.Final Location Survey for Doubling Tandur-Nawandgi(3rd and 4th Line) (18.95 kms.)
31.Final Location Survey for Doubling Vikarabad-Dharur (3rd and 4th Line) (22.27 kms.)
32.Final Location Survey for new line between Manuguru -Ramagundam
33.Final Location Survey for Bodhan-Bidar via Banswada New Line (138 Km)
34.Final Location Survey for Bye-pass line at Purna Jn to connect Purna-Akola line to Manmad-SC line (3.05 km)
35.Final Location Survey between Gangakher -Vadaganilla (DL)
36.Final Location Survey between Parbhani - Pokarni narasimha (DL)
37.Final Location Survey between Pokarni narasimha -Gangakher(DL)
38.Final Location Survey between Vadaganilla - Parli(DL)
39.Final Location Survey for 3rd line between SC-KZJ
40.Final Location Survey for 3rd line between SC-Wadi
41.Final Location Survey for 3rd line between SLODuvvada
42.Final Location Survey for Doubling Bhongir (BG)-Bibinagar (BN) 3rd Line (15 kms.)
43.Final Location Survey for Doubling Bhongir-Aler (3rdand 4th Line) (24.4 kms.)
44.Final Location Survey for Doubling Chitgidda (CTF) -Vikarabad (VKB) 3rd Line (9.93 kms.)
45.Final Location Survey for Doubling Dharur (DRR) -Tandur (TDU) 3rd Line (20.64 kms.)
46.Final Location Survey for Doubling Ghanpur-Raghunathpalli (3rd and 4th Line) (17.2 kms.)
47.Final Location Survey for Doubling Ghatkesar- Bibinagar (3rd and 4th Line) (14.25 kms.)
48.Final Location Survey for Doubling Kazipet-Ghanpur(3rd and 4th Line) (21.25 kms.)
49.Final Location Survey for Doubling Lingampalli-Shankarpalli (3rd and 4th Line) (22.29 kms.)
50.Final Location Survey for Doubling Nawandgi (NAW)- Malkhaid Road (MQR) 3rd Line (29.5 kms.)
51.Final Location Survey for Doubling Nizamabad Station(8 kms.)
52.Final Location Survey for Doubling Raghunathpalli(RGP)-Aler (ALER) 3rd Line (28 kms.)
53.Final Location Survey for Doubling Sanathnagar(S.NoF) -Lingampalli (LPI) 3rd Line (14.12 kms.)
54.Final Location Survey for Doubling of Akola – Dhone
via Purna, Mudhkhed, Secunderabad, Mehboobnagar
excluding Purna – Mudkhed and Bolarum –
Mehboobnagar including Dhone bye-pass (626 Km)

#Scr #SCRrailway #scrinfra
Please find the source as an attachment.

Translate to English
Translate to Hindi

6 Posts

28529 views
2

Nov 26 2023 (05:38)
NaagendraV
NaagendraV   332 blog posts
Re# 5893062-7              
Bro, e document financial year(2023-24) starting lo prepare chesindhi anukunta. document mottam lo Revised estimates unnai. pls see the attachment.
Translate to English
Translate to Hindi

22849 views
0

Nov 26 2023 (06:32)
NaagendraV
NaagendraV   332 blog posts
Re# 5893062-8               Past Edits
No.we are lived in such assumptions till now. since 1966 onwards importance/high priority given to Hyd,SC and nanded division, jurisdiction only and their needs. Requesting you to go through the previous railway budgets and proposal from SCR.
Translate to English
Translate to Hindi

23290 views
0

Nov 26 2023 (06:35)
NaagendraV
NaagendraV   332 blog posts
Re# 5893062-9              
if you considered high priority given to Andhrapradesh then from 1966 to till now under BZA,GTL why SCR constructed only one new lines. Krishnapatnam port to obulavaripalle, this project progress tracked by venkaiah naidu as a vice president. this track is used for goods transport now. except this i don't see any new routes/tracks/railwaylines.
Translate to English
Translate to Hindi

30470 views
1

Nov 26 2023 (10:37)
ssastronaut~
ssastronaut~   922 blog posts
Re# 5893062-10              
SCR should have more accurate.
25. Tenders allocation is in process for Aurangabad-Ankai doubling work.
# Final Location Survey is going for Aurangabad-Parbhani doubling.
Translate to English
Translate to Hindi

20190 views
0

Nov 26 2023 (11:24)
NaagendraV
NaagendraV   332 blog posts
Re# 5893062-11               Past Edits
This document may prepared beginning of the financial year 2023-24 post budget allocation. now almost, we are in last quarter of the financial year so might not have the latest Status.
Translate to English
Translate to Hindi
General Travel
193554 views
1

Nov 15 2023 (07:16)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
sairailnetwork~
sairailnetwork~   469 blog posts
Entry# 5882329            Tags  
For Video: click here
Departing From Kazipet Junction And Crosses Nagarsol Super fast Express In 4k
#wag9 #train #4k #railway #ECOR #SCR #SR #SER #NR #NCR #er #video #lhb #trainjourney #railfan #trainvideos #kazipet #icf
Translate to English
Translate to Hindi
General Travel
98599 views
0

Sep 06 2023 (15:43)   12552/Kamakhya - SMVT Bengaluru AC SF Express (PT) | KYQ/Kamakhya Junction (4 PFs)
Sanz~
Sanz~   8528 blog posts
Entry# 5815541            Tags  
Why the booking of train has been suspended from 3rd Jan 2024. Availability showing only till 27 dec. When being searched for 3rd jan it's showing that no direct trains between kyq and smvb. The ARP of trains scheduled to depart on 3rd jan has already opened from yesterday.
I need to travel on 3rd jan. I tweeted on the nfr and swr official handle. But no reply.
Pls help if anybody is knowing anything.
Translate to English
Translate to Hindi

5 Posts

78393 views
0

Sep 14 2023 (15:04)
AdityaPramanick^~
AdityaPramanick^~   5269 blog posts
Re# 5815541-6              
@5815541-5  @guest
Not possible because 12552 reach SMVT Friday and next day means Saturday morning departure and reach KYQ on Monday . One day for maintenance on Tuesday and again leaves on Wednesday.
Translate to English
Translate to Hindi

75917 views
0

Sep 14 2023 (18:27)guest
Re# 5815541-7              
Almost 48hr layover is at KYQ so can easily extend to DBRG/SCL
Translate to English
Translate to Hindi

70183 views
1

Sep 22 2023 (23:12)
mrinmay
mrinmay   1 blog posts
Re# 5815541-8               Past Edits
It's because of the change of the route guess so. As from 3rd January the train 12552/12551 will have a halt in Perambur (PER) instead of MGR Chennai Central (MAS).
Translate to English
Translate to Hindi

70185 views
0

Sep 27 2023 (14:13)
AdityaPramanick^~
AdityaPramanick^~   5269 blog posts
Re# 5815541-9              
Booking started 😃
Translate to English
Translate to Hindi

70510 views
0

Sep 27 2023 (14:16)
AdityaPramanick^~
AdityaPramanick^~   5269 blog posts
Re# 5815541-10              
Train will not go Chennai Central will go via perambur
Translate to English
Translate to Hindi
Rail Fanning
17868 views
1

Sep 07 2023 (08:09)   12713/Satavahana SF Express | SC/Secunderabad Junction (10 PFs)
ForeverRailfan^~
ForeverRailfan^~   54925 blog posts
Entry# 5816024            Tags  
1 compliments
Great
12713 ↔ 12714 | Vijayawada Junction ↔ Secunderabad Junction ~ Satavahana SF Express
Translate to English
Translate to Hindi
1 Followers
Rail Fanning
68224 views
5

Sep 01 2023 (07:35)   12552/Kamakhya - SMVT Bengaluru AC SF Express (PT) | RJY/Rajahmundry (5 PFs)
ForeverRailfan^~
ForeverRailfan^~   54925 blog posts
Entry# 5811445            Tags  
The then 12552 Kamakhya - Yesvantpur AC SF Express now terminal changed to SMVT Bengaluru.
Translate to English
Translate to Hindi
Page#    Showing 11 to 15 of 374 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy