Full Site Search  
Tue Jan 23, 2018 07:23:21 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Medium; Front Entrance - Outside;
Entrance+gate


HW/Haridwar (9 PFs)
ہری دوار     हरिद्वार

Track: Construction - Electric-Line Doubling

Type of Station: Regular
Number of Platforms: 9
Number of Halting Trains: 45
Number of Originating Trains: 21
Number of Terminating Trains: 21
NH 58, Devpura, Haridwar
State: Uttarakhand
add/change address
Elevation: 293 m above sea level
Zone: NR/Northern
Division: Moradabad
 
 
8 Travel Tips
No Recent News for HW/Haridwar
Nearby Stations in the News

Rating: 3.8/5 (176 votes)
cleanliness - good (22)
porters/escalators - good (22)
food - good (22)
transportation - good (23)
lodging - good (22)
railfanning - good (21)
sightseeing - good (22)
safety - good (22)

Nearby Stations

JWP/Jwalapur 4 km     MOTC/Motichur 5 km     IKK/Ikkar 9 km     RWL/Raiwala Junction 11 km     PRI/Pathri 13 km     VRH/Virbhadra 17 km     ATMO/Aithal 19 km     RKSH/Rishikesh 22 km     QSR/Kansrao 22 km     LRJ/Laksar Junction 27 km    

Station News

Page#    Showing 1 to 20 of 135 News Items  next>>
Jan 20 2018 (21:02)  भारतीय रेलवे का ध्येय वाक्य है-सुरक्षा, संरक्षा और समय। इन तीनों ही मोर्चो पर रेलवे लगातार जूझ रही है (epaper.livehindustan.com)
back to top
IR AffairsNR/Northern  -  

News Entry# 327481     
   Past Edits
Jan 20 2018 (21:02)
Station Tag: Tanakpur/TPU added by ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~/206964

Jan 20 2018 (21:02)
Station Tag: Haridwar/HW added by ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~/206964

Jan 20 2018 (21:02)
Station Tag: Chandigarh Junction/CDG added by ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~/206964

Jan 20 2018 (21:02)
Station Tag: Patliputra Junction/PPTA added by ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~/206964

Jan 20 2018 (21:02)
Station Tag: Varanasi Junction/BSB added by ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~/206964

Jan 20 2018 (21:02)
Station Tag: Lucknow Charbagh NR/LKO added by ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~/206964

Jan 20 2018 (21:02)
Station Tag: New Delhi/NDLS added by ☆गोंडा इलेक्ट्रिक शेङ ■☆*^~/206964
 
 
तेज रफ्तार के साथ सुरक्षित सफर की आस
2018-19
लक्ष्य
उम्मीदें
उत्तर प्रदेश
उत्तर
...
more...
रेलवे के चारबाग समेत सभी स्टेशनों पर लगेज स्कैनर, सुरक्षा की दृष्टि से मैटल डिटेक्टर। दक्षिण के लिएट्रेनें।
उत्तराखंड
जौलजीबी, बागेश्वर, हरिद्वार, चौखुटिया, टनकपुर , चंडीगढ़, सहारनपुर रेललाइन का निर्माण।
बिहार
पूर्व मध्य रेल प्रशासन को कोचिंग काम्प्लेक्स के साथपाटलिपुत्र जंक्शन पर ट्रेनों के रखरखाव की सुविधाओं की दरकार।
झारखंड
रांची में जोनल कार्यालय के साथ रांची से हरिद्वार वाया देहरादून ट्रेन, राजधानी व अन्य एक्सप्रेस गाड़ियों के कोच बदलने की जरूरत।
सुरक्षा, संरक्षा और समय है रेलवे की प्राथमिकता में
रेलवे अपने संसाधनों से कर सकता है विकास
नई दिल्ली ’ अर¨वद सिंहभारतीय रेलवे का ध्येय वाक्य है-सुरक्षा, संरक्षा और समय। इन तीनों ही मोर्चो पर रेलवे लगातार जूझ रही है। तेज रफ्तार के साथ सुरक्षित सफर अब भी उम्मीदों की पटरियों पर जारी है। ऐसे में आगामी बजट में भी यात्री सुविधाओं के साथ पुरानी पटरियों से निजात पाना, विद्युतीकरण और सिग्नल सिस्टम की बेहतरी रेलवे के लिए बड़ी चुनौती होगा।आमबजट में वित्तमंत्री अरुण जेटली ने एक लाख 31 हजार करोड़ का प्रावधान दिया था लेकिन रेलवे के आधारभूत ढांचे को सुधारने के लिए यह नाकाफी है। रेलमंत्री पीयूष गोयल इन चुनौतियों से वाकिफ है और ऐसे में उनका लक्ष्य अगले पांच साल में रेलवे में 20 लाख करोड़ रुपये निवेश करना है, ताकि रेल यात्रियों के सफर को सुरक्षित किया जा सके।हर पांच-सात मिनट में रेल : यात्रियों के लिए प्रत्येक पांच से सात मिनट में रेल चलाने के लिए ट्रंक रेल मार्ग दिल्ली-कोलकाता-चेन्नई-मुंबई (स्वर्णिम चतुभरुज) के बीच हाई स्पीड कॉरिडोर बनाने की तैयारी है। चतुर्भज हाई स्पीड और सेमी हाई स्पीड (160 किलोमीटर प्रतिघंटा) रेल चलाने का खाका तैयार किया जा चुका है। इसमें 38,000 किलोमीटर लाइनों का विद्युतीकरण किया जाएगा। हाई स्पीड रेल के लिए रेलवे प्रमुख रेल मार्गो की पुरानी पटरियों को हटाकर नई पटरियां बिछाने का काम तेजी से कर रहा है। पटरियों की आपूर्ति के लिए रेलवे ग्लोबल टेंडर जारी कर विदेशी कंपनियों से पटरी खरीदेगी।आधुनिक सिग्नल सिस्टम के लिए 60 हजार करोड़ की उम्मीद : आधुनिक सिग्नल सिस्टम खड़ा करने के लिए 60 हजार करोड़ से अधिक निवेश किया जाना है। इसमें ट्रेन कोलिजन एवायडेंस सिस्टम (टीकैश) व अन्य उपकरणों की मदद से प्रत्येक पांच से सात मिनट में रेल चलाई जा सकेंगी। रेल लाइनों की क्षमता बढ़ाने से नई यात्री रेल चलाई जा सकेंगी।वहीं पहले से दौड़ रही रेलगाड़ियों की रफ्तार बढ़ेगी।
रेल संपत्ति का मुद्रीकरण (30 हजार करोड़) व इंडियन रेलवे फाइनेंस कॉरपोरेशन (आईआरएफसी) के बांड (20 हजार करोड़) और रेलवे के आंतरिक स्नेत से (18 हजार करोड़) धन जुटाने की योजना बनाई है।
पीयूष गोयल की प्राथमिकता यात्री संरक्षा, प्रमुख रेल मार्गो का 100 फीसदी विद्युतीकरण और दशकों पुराने सिग्नल सिस्टम को बदलकर विश्व स्तरीय नया सिग्नल सिस्टम लगाने की है। गोयल ने पिछले दिनों कहा कि सरकार यदि सहायता देती है तो बेहतर है अन्यथा रेलवे अपने संसाधनों से परियोजनाओं को पूरा करने में सक्षम है।
Nov 30 2017 (17:56)  Howrah Raj Gets *Swarn* upgradation within dec 8 (www.financialexpress.com)
News Entry# 323685     
   Past Edits
Nov 30 2017 (17:56)
Station Tag: New Delhi/NDLS added by 12313 শিয়ালদহ রাজধানী এক্সপ্রেস~/1696677

Nov 30 2017 (17:56)
Station Tag: Howrah Junction/HWH added by 12313 শিয়ালদহ রাজধানী এক্সপ্রেস~/1696677

Nov 30 2017 (17:56)
Station Tag: Haridwar/HW added by 12313 শিয়ালদহ রাজধানী এক্সপ্রেস~/1696677

Nov 30 2017 (17:56)
Train Tag: New Delhi - Howrah Rajdhani Express ( Via Patna )/12306 added by 12313 শিয়ালদহ রাজধানী এক্সপ্রেস~/1696677

Nov 30 2017 (17:56)
Train Tag: Howrah - New Delhi Rajdhani Express (via Patna)/12305 added by 12313 শিয়ালদহ রাজধানী এক্সপ্রেস~/1696677

Nov 30 2017 (17:56)
Train Tag: New Delhi - Howrah Rajdhani Express (Via Gaya)/12302 added by 12313 শিয়ালদহ রাজধানী এক্সপ্রেস~/1696677

Nov 30 2017 (17:56)
Train Tag: Howrah - New Delhi Rajdhani Express (via Gaya)/12301 added by 12313 শিয়ালদহ রাজধানী এক্সপ্রেস~/1696677
 
 
After Sealdah Rajdhani Express, Howrah Rajdhani Express set for big upgrade in 15 days! check details
After Sealdah-New Delhi Rajdhani Express, now the revamped Howrah-New Delhi Rajdhani Express will be ready in 15 days!
By: Smriti Jain November 29, 2017 9:18 PM

operation
...
more...
swarn, Sealdah Rajdhani booking, Howrah Delhi Rajdhani, Sealdah Rajdhani revamp
Rajdhani Express trains on multiple routes are getting a big revamp under Indian Railways’ Operation Swarn.
Rajdhani Express trains on multiple routes are getting a big revamp under Indian Railways’ Operation Swarn. The first Rajdhani Express train to get this upgrade on as many as 10 parameters is the Sealdah-New Delhi Rajdhani Express train, and started plying from November 28. Not only that, passengers travelling between Kolkata and Delhi have more reason to cheer as the Howrah-New Delhi Rajdhani Express premium train is also being upgraded under the Operation Swarn. The revamped Howrah-New Delhi Rajdhani Express will be ready in 15 days! Operation Swarn is a new initiative of the Indian Railways aimed at upgrading key Rajdhani and Shatabdi Express premium trains to gold standards. Indian Railways aims to do this with an average cost of Rs 50 lakh per rake.
“Eastern Railways has been asked to upgrade three premium trains – Sealdah-New Delhi Rajdhani Express, Howrah-New Delhi Rajdhani Express and the Howrah-Ranchi Shatabdi Express train. Three rakes of Howrah Rajdhani, two rakes of Sealdah Rajdhani and one rake of Ranchi Shatabdi will be given a revamp,” Ravinder Gupta, Principal Chief Mechanical Engineer of Eastern Railways told FE Online. “The first upgraded rake of Howrah-New Delhi Rajdhani Express should be ready by December 8 and the Ranchi Shatabdi should be done by December 10,” Gupta added.
From a passenger perspective, there is a lot to look forward to under Operation Swarn. From focus on cleanliness and better interiors to passenger comfort, many changes have been made. What is noteworthy is that all these passenger comforts come at no additional cost for you – Indian Railways does not plan to hike fares of these trains.
. Modular bio-toilets with auto-janitors to avoid foul smell
. Curtains upgraded with a new fire retardant material
. CCTV cameras
. Night signage boards
. LED Lighting
. Regular cleaning of toilets and clean on demand facility
. Improved upholstery
. User-friendly magazine bag/holder
. Improved bathing area in AC-First class
. Health faucets and stainless steel wash basins with improved soap dispensers
. Better ladder to upper berth in AC-First class coach
For more details of the revamp and images, check: Big Sealdah Rajdhani revamp images: get these new features and comforts
The Sealdah-New Delhi Rajdhani Express has been brought to ‘Gold’ standards at a cost of Rs 35 lakh, implying a cost of less than Rs 2 lakh per coach. Earlier this month, the New Delhi-Kathgodam Shatabdi Express became the first to be upgraded under this scheme. A total of 14 Rajdhani Express trains and 15 Shatabdi Express trains have been identified for upgradation under Operation Swarn.
चूरू. शेखावाटी के लोगों को अब हरिद्वार जाने के लिए चक्कर नहीं लगाने पड़ेेंगे। इसके लिए केन्द्रीय रेल राज्य मंत्री ने रेलवे अधिकारियों को दिसंबर माह में बीकानेर-हरिद्वार ट्रेन चलाने के निर्देश दिए हैं। इस संबंध में सांसद राहुल कस्वां ने रेल राज्यमंत्री राजन गोहेन से दिल्ली में मुलाकात की है।
 
सांसद ने रेल राज्य मंत्री गोहेन को बताया कि उत्तर पश्चिम रेलवे की ओर से बीकानेर डिविजन के हिसार से हरिद्वार तक ट्रेन चलाए जाने के लिए एक प्रस्ताव भिजवाया था। इसके लिए चूरू लोकसभा क्षेत्र के लोगों की ओर से
...
more...
बीकानेर से हरिद्वार तक ट्रेन की मांग की जाती रही है। उन्होंने बताया कि फिलहाल यह टे्रन रख-रखाव के लिए हिसार में 22 घंटे तक खड़ी रहती है। यदि इस गाड़ी का संचालन हिसार की बजाय बीकानेर से किया जाए तो इसके रखरखाव की समस्या नहीं रहेगी। लोगों को भी फायदा मिलेगा। इस पर रेल राज्यमंत्री ने सहमति प्रदान की और रेलवे बोर्ड के अधिकारियों को इस गाड़ी का संचालन बीकानेर से किए जाने के निर्देश दिए।
 
आज होगा उद्घाटन
 
सांसद राहुल कस्वां ने बताया कि रेल राज्य मंत्री इस ट्रेन का उद्घाटन गुरुवार को कुरुक्षेत्र से करेंगे। यह ट्रेन सप्ताह में तीन दिन चलेगी। जिसमें दो दिन हिसार व एक दिन बीकानेर से इसका संचालन होगा। लोगों को इसका लाभ मिलेगा।
 
इस तरह रहेगा टाइम टेबल
 
उत्तर-पश्चिम रेलवे बीकानेर के वरिष्ठ मंडल वाणिज्य प्रबंधक के मुताबिक गाड़ी संख्या 14717 बीकानेर-हरिद्वार साप्ताहिक एक्सप्रेस ट्रेन सेवा चार दिसंबर से बीकानेर से प्रत्येक सोमवार को रात 11.०५ बजे रवाना होकर मंगलवार दोपहर 15.20 बजे हरिद्वार पहुंचेगी।
इसी प्रकार ट्रेन संख्या 14718 हरिद्वार-बीकानेर साप्ताहिक एक्सप्रेस ट्रेन दो दिसंबर से हरिद्वार से प्रत्येक शनिवार को शाम 16.20 बजे रवाना होकर रविवार सुबह 7.55 बजे बीकानेर पहुंचेगी। ट्रेन में दो थर्ड एसी, पांच द्वितीय शयनयान श्रेणी, पांच साधारण श्रेणी तथा दो गार्ड डिब्बों सहित कुल 14 डिब्बे होंगे। ट्रेन के नियमित संचालन से बीकानेर, रतनगढ़, चूरू, सादुलपुर, हिसार, भिवानी, रोहतक, पानीपत, करनाल, कुरुक्षेत्र, अम्बाला, सहारनपुर, रूड़की सहित मार्ग में आने वाले अनेक शहर-कस्बों के लोगों को आवागमन की सुविधा मिल सकेगी।
 
चूरू-फतेहपुर अमान परिवर्तन का उद्घाटन नौ दिसंबर को!
 
सांसद राहुल कस्वा ने चूरू से फतेहपुर तक गाड़ी संचालन किए जाने को लेकर रेल राज्य मंत्री से मुलाकात की। उन्होंने बताया कि इस आमान परिवर्तन का कार्य पूरा हो चुका है। सीआरएस में इस मार्ग को गाडी संचालन के लिए उपयुक्त पाया गया है। अब इस रेल मार्ग पर चूरू से सीकर तक गाडी का संचालन किया जाए। इसके लिए उन्होंने उद्घाटन के लिए चूरू आने का न्यौता दिया। जिस पर रेल राज्य मंत्री गोहेन ने नौ दिसंबर को आने की सहमति दी प्रदान की है
Nov 08 2017 (15:25)  Haridwar intercity left in the evening instead of morning सुबह के बजाए शाम को रवाना हुई हरिद्वार इंटरसिटी Patrika Hindi (www.patrika.com)
back to top
Commentary/Human InterestNR/Northern  -  

News Entry# 322120     
   Past Edits
Nov 08 2017 (15:26)
Station Tag: Haridwar/HW added by ⭐ ⭐ ⭐ Telangana Express Oops AP Express ⭐ ⭐ ⭐/1366147
Stations:  Haridwar/HW  
 
 
Haridwar intercity left in the evening instead of morning सुबह के बजाए शाम को रवाना हुई हरिद्वार इंटरसिटी Patrika Hindi
Nov 03 2017 (10:06)  SOME NORTH-BOUND WESTERN RLY TRAINS TO BE AFFECTED DUE TO NON – INTERLOCKING WORK AT HARRAWALA STATION (www.wr.indianrailways.gov.in)
back to top
IR AffairsIR Press Release  

News Entry# 321723     
   Past Edits
Nov 03 2017 (10:06)
Station Tag: Bandra Terminus/BDTS added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Indore Junction BG/INDB added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Ujjain Junction/UJN added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Dehradun/DDN added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Station Tag: Haridwar/HW added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Ujjaini Express/14310 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Indore-Dehradun Express/14317 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Dehradun - Mumbai Bandra Terminus Express/19020 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Nov 03 2017 (10:06)
Train Tag: Mumbai Bandra (T.) - Dehradun Express/19019 added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
 
 
Due to Non – Interlocking work at Harrawala station, for provision of panel interlocking inorder to run 18 coaches train between Haridwar – Dehradun section and also for the overhauling of lever frame at central cabin of Dehradun with effect from 5thNovember to 8th November, 2017; certain trains departing as well as arriving at W. Rly will be short terminated and will also depart from Haridwar station instead of Dehradun as per the details given under:
1.Train no 19019 Bandra Terminus – Dehradun Express, journey commencing o­n 04.11.2017, 05.11.2017 & 06.11.2017 will be short terminated at Haridwar station.
2.Train
...
more...
No. 19020 Dehradun – Bandra Terminus Express, journey commencing o­n 05.11.2017, 06.11.2017, 07.11.2017 & 08.11.2017 will depart from Haridwar station.
3.Train no 14317 Indore – Dehradun Express, journey commencing o­n 04.11.2017 & 05.11.2017 will be short terminated at Haridwar station.
4.Train No. 14310 Dehradun – Ujjain Express, journey commencing o­n 07.11.2017 & 08.11.2017 will depart from Haridwar station.
Page#    Showing 1 to 20 of 135 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.