Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Bihar Sampark Kranti - ECR Don ka ticket Confirm hona mushkil hi nahi, namumkin hai. - Somanko

Timeline of all Site Edits
Filters:
 
 
 
Page#    1 Timeline Updates  

^~
Oct 18 2016 (03:45)
Oct 18 2016 (03:45)   Atlas Track# 18.779   Atlas - Track Type
Entry# 1009101   Blog Entry# 2033187  
by: ^~   1434 Conf TLs   49 Void TLs
Route: 18 MS/Chennai Egmore - CGL/Chengalpattu Junction: Triple Electric-Line

1 Posts

636 views
0

Oct 23 2016 (10:15)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2033187-2              
Incorrect information. MS-TBM is a quadruple electrified line, with 2 lines acting as double lines for suburban trains and 2 lines acting as twin single lines for the MS-VM mainline. TBM-CGL is only a electrified double line. There no third track between TBM and CGL.
Translate to English
Translate to Hindi

1025 views
1

Oct 23 2016 (10:17)
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~   17667 blog posts
Re# 2033187-3              
3 rd line is under GC so this update is wrong
Translate to English
Translate to Hindi

955 views
0

Oct 23 2016 (16:46)
TheMadrasMail~
TheMadrasMail~   6349 blog posts
Re# 2033187-4              
Oh, I didn't know about the GC part. I traveled to CGL in Mid-July, and by that time, practically all of the MG track was completely lifted, except for a short stretch under the flyover at Vandalur. and there was no construction activity of any kind all along the route. I thought that was the end of 3 line operations on this route!
Translate to English
Translate to Hindi

989 views
2

Oct 23 2016 (16:49)
ER_PRAGADESH_SK_NGT^~
ER_PRAGADESH_SK_NGT^~   17667 blog posts
Re# 2033187-5              
MG removed for GC purpose. during MG times it was double MG and single BG before that 3 MG. once CRS sanctioned we can update as triple line as there is no option for construction of third line, so till that let it be double electric line. kindly make sure people dont mess with these without proper news source
Translate to English
Translate to Hindi

1 Posts

975 views
0

Oct 24 2016 (11:25)
SingleTraveller^~
SingleTraveller^~   3247 blog posts
Re# 2033187-7              
If you do have the privileges to modify the atlas, could you please modify to show the construction of doubling between Hotgi and Kudgi?
Translate to English
Translate to Hindi
Page#    1 Timeline Updates  

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy