Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

TKD WDP-4B "प्रतीक" - रंग ऐसा कि हर किसी को प्यार हो जाए - Anubhav Kashyap

Search Forum
Post PNR
TRAIN IS CANCELLED
Availability Calendar
Search SBC to MYS
Return# 06315
PDF Download

06316/Kochuveli - Mysuru Festival Special
कोच्चुवेली - मैसूरु त्योहार विशेष

SBC/KSR Bengaluru City Junction (Bangalore) --> MYS/Mysuru Junction (Mysore)

Updated: Oct 07 2021 (16:24) by shailshekhara
Oct 07 2021 (16:24)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    24 blog entries  <<prev  next>>
Rail Fanning
30386 views
11

Nov 06 2021 (19:02)   06316/Kochuveli - Mysuru Festival Special | KVU/Kadakavur (3 PFs)
SivasankarB~
SivasankarB~   240 blog posts
Entry# 5114503            Tags  
❤️ KABINI ❤️

*06316 Kochuveli (KCVL) - Mysuru Jn (MYS) Festival Special lead by SWR Krishnarajapuram's 3rd WAP-7 #30630 named as "KABINI" from the river Kabini passing through Kadakavur Railway Station (KVU). Empty rake of 06083/84 TVC-NZM Weeky Special can be seen on the loop line.
Translate to English
Translate to Hindi

1 Posts

16381 views
0

Nov 06 2021 (20:06)
RFIR~
RFIR~   6887 blog posts
Re# 5114503-2              
In the reverse direction MYS-KCVL, the train can easily be speeded up by at least 1 hour. Daily it stops at SBC for almost 1 hour and sometimes even more by reaching before time
Translate to English
Translate to Hindi
Rail Fanning
23648 views
0

Aug 12 2021 (19:40)   06316/Kochuveli - Mysuru Festival Special | KYJ/Kayamkulam Junction (5 PFs)
Yadhu_krishnan
Yadhu_krishnan   2 blog posts
Entry# 5040209            Tags   Past Edits
Train no 06316kochuveli mysore festival special arriving at kayamkulam junction on Saturday 7 August 2021 please like and share it
Translate to English
Translate to Hindi
Travel Question
16185 views
0

Aug 02 2021 (13:18)   06316/Kochuveli - Mysuru Festival Special | MYS/Mysuru Junction (Mysore) (6 PFs)
AZT~
AZT~   3215 blog posts
Entry# 5031017            Tags  
If travelling in this train krcom KCVL to MYS, any RT-PCR result required?
Translate to English
Translate to Hindi

14885 views
1

Aug 02 2021 (13:19)
shailshekhara
shailshekhara   35246 blog posts
Re# 5031017-1              
YES
Translate to English
Translate to Hindi
Rail Fanning
48116 views
19

★★★
Dec 12 2020 (23:18)   06315/Mysuru - Kochuveli Festival Special | MYS/Mysuru Junction (Mysore) (6 PFs) | ED/WAP-7/30748
ArjunAnbalagan
ArjunAnbalagan   4627 blog posts
Entry# 4811196            Tags   Past Edits
Sequence Of SR Erode ED WAP-7 #30748 Hauled By
With 06315 Mysuru - Kochuveli Festival Special Approaching Outder MYS/Mysore Jn..!!!
PC-Akshay
Translate to English
Translate to Hindi

More Posts
General Travel
17917 views
0

Jun 29 2021 (17:57)   06315/Mysuru - Kochuveli Festival Special | MYS/Mysuru Junction (Mysore) (6 PFs)
irifan2015~
irifan2015~   2410 blog posts
Entry# 4998948            Tags  
Unable to understand why this should leave Mysore by 1250, if there are issues with its leaving SBC before 1650.
Basava starting at 1330 (40 minutes later) with more halts than KCVL express overtakes on daily basis!!.
Why can't it start by 1350-1400 and still reach by 1645 to SBC?
Translate to English
Translate to Hindi

14159 views
0

Jun 29 2021 (19:48)
deepak.yerr~
deepak.yerr~   6301 blog posts
Re# 4998948-1              
Check the PF occupancy in MYS from 1000 to 1500 u can get the answer. May be all the PF are full.
Translate to English
Translate to Hindi

13555 views
1

Jun 30 2021 (17:48)
irifan2015~
irifan2015~   2410 blog posts
Re# 4998948-2              
Suggestion:
MEMU from Bangalore can reach Mysore by 1230 and leave by 1300 (instead of 1345) to reach SBC by 1615. MYS KCVL can start by 1345 to reach SBC by 1630 and proceed further. Basava can start by 1400 to reach SBC by 1645 and proceed further.
Gains - one hour journey time reduction for KCVL. Half an hour reduction for Basava.
...
more...

Reasoning: No change of loco for KCVL. So halt for 20 minutes at SBC and go further. Basava crawls till 1800 before Yelahanka. So, even if it reaches by 1645-1700 at sbc, still it can reach YNK by 1800.
What is your view??

Translate to English
Translate to Hindi

12750 views
0

Jun 30 2021 (20:03)
deepak.yerr~
deepak.yerr~   6301 blog posts
Re# 4998948-3              
There is need to totally reorganisr the timings of all the trains in SBC MYS SBc section and reduce them to 2.5hrs. As slack is already added to SBC they need not have that much. By the example of Basava and KVCL swr seems to pass on time in running or stopping trains at intermediate stations then in MYS.
Translate to English
Translate to Hindi

11350 views
0

Jul 01 2021 (16:56)
irifan2015~
irifan2015~   2410 blog posts
Re# 4998948-4              
Something seriously gone wrong.
During diesel single track MG days, it used to take 3 to 3.15 hours to cover the distance. Now electrified double track broad gauge, it takes more than 3 hours even for a long distance train!!.
If journey time is not getting reduced, why doubling electrification etc were done?
Same is the case with Hassan Mangalore section. MG
...
more...
days had more trains with better connectivity than today!!

Translate to English
Translate to Hindi
Page#    24 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy