Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

ಮೈಸೂರು - ವಾರಣಾಸಿ ಎಕ್ಸ್‌ಪ್ರೆಸ್: ಕಾವೇರಿ ಮತ್ತು ಗಂಗಾ ನದಿಗಳ ಸಂಪರ್ಕ ಸೇತುವೆ - Vishwanath Joshi

Search Forum
Post PNR
Large TB;
Entry# 2100528-0
Side View; Large TB; UnReserved; Outside of Train;
Entry# 2266543-25


Availability Calendar
Search OTP to WKI
Return# 12512
PDF Download

12511/Gorakhpur - Kochuveli Rapti Sagar SF Express (PT)
गोरखपुर - कोच्चुवेली राप्ती सागर सुपरफास्ट एक्सप्रेस

OTP/Ottappalam --> WKI/Wadakancheri

Updated: Jun 05 (12:12) by NEERAJGUPTA^~
Jun 05 (12:12)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    1407 blog entries  <<prev  next>>
Rail News
53234 views
0

IR Affairs
NR/Northern
Aug 05 (22:59)   Train Delays and Cancellations on Lucknow-Kanpur Rail Section due to Construction Work

AdittyaaSharma^~   72978 news posts
Entry# 6147486   News Entry# 563756         Tags   Past Edits
read full article... आज से 14 तक लखनऊ-कानपुर रेल खंड पर 16 ट्रेनें प्रभावित रहेंगी

The Indian Railways administration will be carrying out a down loop line construction work at Jaitipur station on the Kanpur Central-Lucknow rail section of the North Railway's Lucknow Division. This work will affect train operations between August 6th and August 14th. As a result, 10 trains on the Lucknow-Kanpur route will...
more...
be halted for varying durations, while 3 trains will be cancelled and 3 will be rerouted. The 3 cancelled trains are the Kasganj-Lucknow Junction Special (train numbers 05380 and 05379), and the Agra Fort-Lucknow Junction train (12180/12179). The 3 trains that will be rerouted are the Gorakhpur-Secunderabad Express (12589), the Pune-Lucknow Junction Express (12103), and the Gorakhpur-Vadodara Special (09112). The 10 trains that will be halted are the Farrukhabad-Chhapra Express (15084), Barauni-Gwalior Express (11124), Muzaffarpur-Sabarmati BG Express (15269), Gorakhpur-Kochuveli Express (12511), Kochuveli-Gorakhpur Express (12512), Sabarmati BG-Lucknow Express (19401), Panvel-Gorakhpur Express (15066), Chhapra-Mathura Express (22531), Gorakhpur-Bandra Terminus Express (15067), and Lucknow Jn.-New Delhi Express (12003). Details of the halting durations and rerouting paths are provided in the original text.

Indian Railways ke administration Jaitipur station pe down loop line ka construction kaam karega, jo ki North Railway ke Lucknow Division mein Kanpur Central aur Lucknow rail section pe hai. Iska effect 6 August se 14 August tak Lucknow aur Kanpur ke beech chalne wali trainon pe padega. 10 trains...
more...
ko route pe rukna hoga, aur 3 trains cancel kar di jayegi, aur 3 trains ko alag route se chalana hoga. Cancel hone wali 3 trains hai Kasganj-Lucknow Junction Special (train number 05380 aur 05379), aur Agra Fort-Lucknow Junction train (12180/12179). 3 trains jo alag route se chalengi wo hai Gorakhpur-Secunderabad Express (12589), Pune-Lucknow Junction Express (12103), aur Gorakhpur-Vadodara Special (09112). 10 trains jo rukengi wo hai Farrukhabad-Chhapra Express (15084), Barauni-Gwalior Express (11124), Muzaffarpur-Sabarmati BG Express (15269), Gorakhpur-Kochuveli Express (12511), Kochuveli-Gorakhpur Express (12512), Sabarmati BG-Lucknow Express (19401), Panvel-Gorakhpur Express (15066), Chhapra-Mathura Express (22531), Gorakhpur-Bandra Terminus Express (15067), aur Lucknow Jn.-New Delhi Express (12003). Original text mein in trains ke rukne ka time aur alag route ke details diye hue hain.
Rail News
25942 views
0

Major Accidents/Disruptions
NCR/North Central
Aug 04 (19:46)   Train Cancellations and Delays on Kanpur Central - Kasganj Route Due to Non-Interlocking Work

Exynos9611~   18602 news posts
Entry# 6146303   News Entry# 563609         Tags   Past Edits
read full article... Indian Railway: यात्रीगण कृपया ध्यान दें! सेंट्रल-कासगंज रूट की कई ट्रेनें निरस्त...इस स्टेशन पर मरम्मत काम के कारण हुए कई बदलाव

Several trains on the Kanpur Central - Kasganj route have been canceled due to non-interlocking work on the loop line at Jaitipur station in the Lucknow division. Several trains coming from Gorakhpur, Gonda, and Bahraich to Lucknow via Lucknow will have their timings changed, while some will be diverted to other...
more...
routes. The 05380 Kasganj - Lucknow special train will be canceled on August 12th and 13th, and the 05379 Lucknow - Kasganj special train will be canceled on August 13th and 14th. The 12180 and 12179 Agra Fort special trains to Lucknow will not run on August 14th. The 15084 Farrukhabad - Chhapra express, which departs from Farrukhabad on August 6th and 7th, will be delayed by 15 minutes. The 12512 Kochuveli - Gorakhpur express, departing from Kochuveli on August 11th, will be delayed by two hours at Central Station. The 19401 Sabarmati BG - Lucknow express, departing from Sabarmati BG on August 12th, will be controlled and run for 65 minutes until Central Station. On August 14th, the 12589 Gorakhpur - Secunderabad express will run through Gorakhpur, Ayodhya Dham, Ayodhya Cantt, Sultanpur, Pratapgarh, Prayagraj, and Central stations, but will not stop at Gonda, Barabanki, Badshahnagar, or Aishbagh stations. The Avadh Express 19038, traveling from Barauni Junction to Bandra Terminus, had a spring break in its M-2 coach. The TXR team investigated at Central Station but couldn't replace the spring there, so the train was sent on with a caution of 60 km per hour. A youth was removed from the Swarna Shatabdi Express after causing a disturbance. He had been drinking and started causing trouble on the train. The RPF apprehended him at Central Station and filed a case. This resulted in the train departing from Central Station with a delay.

Kanpur Central se Kasganj route pe kaafi trains cancel kar di gayi hain kyunki Lucknow division me Jaitipur station pe loop line pe non-interlocking ka kaam chal raha hai. Gorakhpur, Gonda, aur Bahraich se Lucknow aane wali kaafi trains ka time badal gaya hai, aur kuchh trains ko dusre routes se...
more...
aage bheja ja raha hai. 12 aur 13 August ko, 05380 Kasganj - Lucknow special train cancel rahegi, aur 13 aur 14 August ko, 05379 Lucknow - Kasganj special train bhi cancel rahegi. Agra Fort se Lucknow jaane wali 12180 aur 12179 special trains 14 August ko nahi chalenga. 6 aur 7 August ko Farrukhabad se chalne wali 15084 Farrukhabad - Chhapra express apna time se 15 minutes late chalegi. 11 August ko Kochuveli se chalne wali 12512 Kochuveli - Gorakhpur express, Central Station pe 2 ghante late chalegi. 12 August ko Sabarmati BG se chalne wali 19401 Sabarmati BG - Lucknow express, Central Station tak 65 minutes control karke chalaai jaaegi. 14 August ko, 12589 Gorakhpur - Secunderabad express, Gorakhpur, Ayodhya Dham, Ayodhya Cantt, Sultanpur, Pratapgarh, Prayagraj, aur Central station se jaayegi, lekin Gonda, Barabanki, Badshahnagar, aur Aishbagh stations pe nahi rukegi. Barauni Junction se Bandra Terminus jaane wali Avadh Express 19038 ke M-2 coach me spring chatak gayi. Central Station pe TXR team ne check kiya, lekin station pe spring badalna possible nahi tha, toh train ko 60 km per hour ki speed se chalaaya gaya. Swarna Shatabdi Express me ek youth ne nashe me ho kar bahut disturbance kiya. RPF ne usko Central Station pe uthaya aur case register kiya. Is wajah se train Central Station se late chale.
Rail News
50230 views
0

Major Accidents/Disruptions
NR/Northern
Aug 03 (19:46)   35 Trains Affected by Maintenance Work in Lucknow Division

Exynos9611~   18602 news posts
Entry# 6145325   News Entry# 563449         Tags   Past Edits
read full article... यूपी की 36 ट्रेनें प्रभावित:लखनऊ से आवाजाही करने वाली 18 ट्रेन देरी से चलेंगी,10 ट्रेनें रहेंगी निरस्त ,6 का लागू हुआ डायवर्जन

Due to maintenance work in the Lucknow division, 35 trains will be affected from August 6 to 15. The inter-locking work at Jaitipur station in Kanpur has led to changes in train schedules. Several trains will experience delays, while others will be canceled. Train number 09111 will be delayed by 80...
more...
minutes, 14124 by 30 minutes, and 14137 by 140 minutes on August 7. Train number 11124 will be delayed by 50 minutes from Barabanki, and 15269 by 40 minutes. Trains 12594 and 19715 will be delayed by 150 minutes and 90 minutes respectively on August 12. Additionally, 10 trains will be canceled completely from August 12 to 15. These include train numbers 01823, 018234, 05380, 05379, 14124, 14123, 04297, 04296, 12180, and 12179.

Lucknow division mein maintenance ka kaam chal raha hai, is wajah se 6 August se 15 August tak 35 trains affected honge. Kanpur ke Jaitipur station pe inter-locking ka kaam chal raha hai, is wajah se railways ne new train schedule release kiya hai. Bahut saari trains delay honge aur kuch...
more...
trains cancel bhi honge. Train number 09111, 80 minutes delay se, 14124, 30 minutes delay se, aur 14137, 7 August ko 140 minutes delay se chalegi. Train number 11124, Barabanki station se 50 minutes delay se, aur 15269, 40 minutes delay se chalegi. Trains 12594 aur 19715, 12 August ko 150 minutes aur 90 minutes delay se chalegi. 10 trains, 12 August se 15 August tak cancel rahengi. Inmein train numbers 01823, 018234, 05380, 05379, 14124, 14123, 04297, 04296, 12180, aur 12179 include hain.
Rail Fanning
76583 views
5

Jul 29 (09:50)   12512/Kochuveli - Gorakhpur Rapti Sagar SF Express (PT) | BV/Babhnan (2 PFs)
kirk781^~   4010 blog posts
Entry# 6139269            Tags  
4 compliments
Great Great Great Great
This also happened nearly two decades ago.We used to go from LJN to home station BV via LJN-BJU Express. That train today has RSA with LJN-JBP Express [though it is not strictly needed given double electrified tracks all along]. But back in the day, it was diesel tracks, much of it single line with a honking WDM-3D/A in tow and worst of all, no RSA. So the rake that used to come, same rake used to reverse from LJN.The turn around time was 2.5 hours but the train used to come terribly late and of course, would need easily ~1 hr for rakes to reverse and more importantly, passengers to board from souce. It didn't help that all trains then coming to NER used to undergo LR at LJN and almost all got higher priority than this crawler.
...
more...

This train often used to depart couple of hours late from source itself and would reach my destination much later in the night. So, what we did was board the Rapti Sagar Express [which doesn't stop at Babhnan], assumed it would over take the GD-GKP passenger somewhere b/w GD and Mankapur and we'll deboard at Mankapur and board the passenger upto our destination 30 kms away. Well, that didn't happen. The Rapti Sagar was slightly late and the passenger wasn't overtaken after Mankapur station had crossed. We OT the passenger and after that had an unscheduled halt ~10 kms before our destination. But of course, Rapti Sagar's next stop was Basti, so we deboarded the train and were then in the middle of two stations at ~2000 hrs. One was "Parsa Tewari", 1 km ahead and other was "Babhan Jyotia", 1 km before. We decided to walk/run with our luggage towards "Babhan Jyotia" since the previous station was newly built and we didn't knew if the passenger will halt there or not. We reached there in ~10 mins or so. Waited a few mins for the passenger and then boarded it. Reached our destination after 20 minutes more.

Translate to English
Translate to Hindi

65780 views
1

Jul 29 (10:32)
kjmwag9hc^~
kjmwag9hc^~   2631 blog posts
Re# 6139269-1              
Quite an adventure. :D
Translate to English
Translate to Hindi

55367 views
1

Aug 01 (09:43)
kirk781^~   4010 blog posts
Re# 6139269-2              
1 compliments
Useful
It was weird in those days with no double tracks meaning most stations had only 1 main platform and no PF #2 to speak of [and no FOB as well]. I remember another case where Avadh Express was to come at 'Babhnan' . The third , loop line was taken by a goods train. Since it was a single line section, a non stopping train was looped at the FIRST track[main platform] and the train which had the actual stoppage [Avadh Express] came at the middle one. What were the passengers supposed to do? We deboarded on the rail tracks. After waiting for a minute sandwiched b/w two stationery trains, both of them started moving in opposite directions and we were now sandwiched for a minute between 2 MOVING trains, which was worse.
...
more...

The conditions are much better now. With dual platforms, it means the train will always arrive at a proper platform, no matter how bad the station is and there will be a proper FOB to guide you home[ except for at halt stations]. That being said, many people don't bother to use the FOB and would rather still risk the rail tracks in the dead of the night for saving couple of minutes.

Translate to English
Translate to Hindi
General Travel
144543 views
1

Jun 07 2018 (23:51)   12565/Bihar Sampark Kranti Express (PT) | CNB/Kanpur Central (10 PFs)
ner_12555_king~
ner_12555_king~   494 blog posts
Entry# 3502871            Tags   Past Edits
extreme rush in lko-cnb section
1. 51814 at cnb at 23;31
2. 54101 dep cpb unknown time
3.14217 arr cpb at 23;09 ....Departed from KANPUR BGE L BK (CPB) at 07-Jun 23:43 (4 Kms. to go)
4.
...
more...
15668 Departed mgw at 23;25 .... Arrived at KANPUR BGE L BK (CPB) at 07-Jun 23:40 (4 Kms. to go)
5. 12511 Arrived at UNNAO JN (ON) at 07-Jun 23:25 Delayed by 10:45 Hrs. (17 Kms. to go) ut time 23;26
6. 12555 Arrived Sonik at 23;22 ut time 23;30 ..... Departed from SONIK (SIC) at 07-Jun 23:29 (26 Kms. to go) ut time 23;43
7. 13483 Departed from JAITIPUR (JTU) at 07-Jun 23:18 (41 Kms. to go) ut time 23;30
8. 12108 Departed from HARAUNI (HRN) at 07-Jun 23:22 (49 Kms. to go)
ut time 23;30
9. 12565 bsk Departed from PIPARSAND (POF) at 07-Jun 23:29 (55 Kms. to go)

Translate to English
Translate to Hindi
Page#    1407 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy