Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Shan-e-Bhopal - तेरी खूबसूरती से नजर नही हटती, नजारे हम क्या देखें - ललितपुरी रेलफैन

Search Forum
Post PNR
no description available
Entry# 5909215-0
no description available
Entry# 5909215-0
Availability Calendar
Search R to DURG
Return# 12151
PDF Download

12152/Samarsata SF Express (PT)
समरसता सुपरफास्ट एक्सप्रेस

R/Raipur Junction --> DURG/Durg Junction

Updated: Aug 20 (16:40) by Kumaon_Tiger^~
Aug 20 (16:40)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    956 blog entries  <<prev  next>>
Rail News
100264 views
0

IR Affairs
SECR/South East Central
Jun 29 (14:34)   Train Operations Resumed in Kharagpur Railway Division After Non-Interlocking Work

AdittyaaSharma^~   72978 news posts
Entry# 6109069   News Entry# 558157         Tags   Past Edits
read full article... Indian Railways: नान-इंटरलाकिंग के बीच दौड़ेंगी ट्रेनें, यात्रियों को राहत

The Kharagpur Railway Division of the South Eastern Railway has decided to resume the operations of trains after resolving the problems related to non-interlocking work, aiming to provide convenience to passengers. This work, connecting the Sankrail-Santragachi link line to Andul station, was scheduled from June 29 to July 8. While some...
more...
trains previously cancelled due to the work will now operate on their scheduled times, other trains will experience delays due to the non-interlocking work. Key trains affected are listed, specifying their names, numbers, original cancellation dates, and delays. For example, train 18029, the LTT-Shalimar Express, was originally canceled on July 4-6 but will now operate as scheduled. Train 12129, the Pune-Howrah Azad Hind Express, will be delayed 30 minutes on June 30, 90 minutes on July 1, and 3 hours on July 4.

South Eastern Railway ke Kharagpur Rail Mandal ne non-interlocking kaam se aane wali pareshaniyo ko dur karke, yaatriyon ko suvidha dene ke liye unki train journeys ko fir se chalane ka faisla liya hai. Sankrail-Santragachi link line ko Andul station se jodne ka yeh kaam 29 June se 8 July tak...
more...
chal raha tha. Is kaam ki wajah se kuchh trains pehle cancel kar di gayi thi, jo ab apne schedule time par chalengi. Lekin, non-interlocking kaam ke chalte kuchh trains apne schedule se der se chalengin. Kuchh important trains ki list bhi di gayi hai, jismein unke naam, numbers, original cancellation dates, aur delays di gaye hain. Jaise, train 18029, LTT-Shalimar Express, jo 4-6 July ko cancel thi, ab apne schedule time par chalegi. Train 12129, Pune-Howrah Azad Hind Express, 30 June ko 30 minute, 1 July ko 90 minute, aur 4 July ko 3 hours der se chalegi.
Rail News
65504 views
0

IR Affairs
SECR/South East Central
Jun 29 (14:28)   Cancelled Trains Resume Operations on South Eastern Railway After Block Work

AdittyaaSharma^~   72978 news posts
Entry# 6109067   News Entry# 558156         Tags   Past Edits
read full article... Indian Railways: SECR के इस रूट पर रेलवे ब्‍लॉक खत्म होने से 14 रद ट्रेनें फिर पटरी पर लौटी, रेल यात्रियों को मिली बड़ी राहत

Due to railway block work on the Kharagpur railway division of South Eastern Railway, 14 trains were canceled from June 29 to July 8. The block work was to connect the Sankrail-Santragachi link line to Andul station. These 14 trains have now resumed operations. Additionally, 8 express trains will be delayed...
more...
due to the block work. The 14 canceled trains include the 18029 LTT-Shalimar Express, 18030 Shalimar-LTT Express, 12129 Pune-Howrah Azad Hind Express, 12130 Howrah-Pune Azad Hind Express, 12905 Porbandar-Shalimar Express, 12906 Shalimar-Porbandar Express, 20971 Udaipur-Shalimar Express, 20972 Shalimar-Udaipur Express, 2949 Porbandar-Santragachi Express, 12950 Santragachi-Porbandar Express, 22512 Kamakhya-LTT Express, 22511 LTT-Kamakhya Express, 12101 LTT-Shalimar Express, and 12102 Shalimar-LTT Express. The delayed trains include 12129 Pune-Howrah Azad Hind Express, 22905 Okha-Shalimar Express, 12101 LTT-Shalimar Express, 12262 Howrah-Mumbai Duronto Express, 12809 Chhatrapati Shivaji Maharaj Terminal-Howrah Mail, 12151 LTT-Shalimar Express, 12222 Howrah-Pune Duronto Express, and 12905 Porbandar-Shalimar Express.

South Eastern Railway ke Kharagpur railway division mein 29 June se 8 July tak railway block work ki wajah se 14 trains cancel kar di gayi thi. Ye block work Sankrail-Santragachi link line ko Andul station se connect karne ke liye tha. Ab ye 14 trains phir se chalna start kar...
more...
chuki hain. Iske saath hi 8 express trains delay se chalengi. Cancelled trains mein 18029 LTT-Shalimar Express, 18030 Shalimar-LTT Express, 12129 Pune-Howrah Azad Hind Express, 12130 Howrah-Pune Azad Hind Express, 12905 Porbandar-Shalimar Express, 12906 Shalimar-Porbandar Express, 20971 Udaipur-Shalimar Express, 20972 Shalimar-Udaipur Express, 2949 Porbandar-Santragachi Express, 12950 Santragachi-Porbandar Express, 22512 Kamakhya-LTT Express, 22511 LTT-Kamakhya Express, 12101 LTT-Shalimar Express, aur 12102 Shalimar-LTT Express shamil hain. Delay wali trains mein 12129 Pune-Howrah Azad Hind Express, 22905 Okha-Shalimar Express, 12101 LTT-Shalimar Express, 12262 Howrah-Mumbai Duronto Express, 12809 Chhatrapati Shivaji Maharaj Terminal-Howrah Mail, 12151 LTT-Shalimar Express, 12222 Howrah-Pune Duronto Express, aur 12905 Porbandar-Shalimar Express shamil hain.
Rail News
121753 views
0

IR Affairs
CR/Central
IR Press Release
Apr 08 (15:24)   Central Railway Announces Traffic Power Blocks for Vikhroli ROB Construction

ForeverRailfan^~   3216 news posts
Entry# 6023201   News Entry# 547600         Tags   Past Edits
read full article... Special Traffic and Power Blocks o­n Ghatkopar-Bhandup section of Central Railway for Launching of Girders for Vikhroli ROB during Night Hours from 06/07.04.2024 (Saturday/Sunday) to 11/12.04.2024 (Thursday/Friday)

Central Railway will be implementing traffic power blocks on various lines between Ghatkopar and Bhandup stations from April 6th to 12th, 2024, for the construction of a Road Over Bridge (ROB) at Vikhroli. These blocks will impact both suburban and long-distance trains. The blocks will be implemented from 01:20 hrs to...
more...
04:05 hrs on April 6th and 7th, and from 01:20 hrs to 04:30 hrs on April 8th to 12th. During these periods, some suburban trains will be short-terminated or cancelled, and certain long-distance trains will be regulated, short-terminated, or diverted. Specific details regarding the affected train services, timings, and routes are provided for each day of the block.

Central Railway Ghatkopar aur Bhandup stations ke beech alag alag lines pe traffic power blocks laga raha hai, April 6th se 12th, 2024 tak, Vikhroli mein Road Over Bridge (ROB) banwane ke liye. Isse suburban aur long-distance dono trains pe asar padega. Blocks April 6th aur 7th ko 01:20 hrs se...
more...
04:05 hrs tak, aur April 8th se 12th tak 01:20 hrs se 04:30 hrs tak chalenge. Is duration mein kuch suburban trains short-terminate ho jaayengi ya cancel ho jaayengi, aur kuch long-distance trains regulate honge, short-terminate honge ya divert kiye jaayenge. Har din ke block ke liye affected train services, timings aur routes ke specific details diye gaye hain.
Rail News
217956 views
0

IR Affairs
CR/Central
Apr 06 (20:20)   Central Railway to Operate Traffic Power Blocks for Vikhroli ROB Project, Affecting Train Services

Exynos9611~   18602 news posts
Entry# 6021612   News Entry# 547404         Tags   Past Edits
read full article... Mumbai Local News: These Trains To Be Affected Between April 6-12 - Check Details Here

Central Railway (CR) will be conducting traffic power blocks on various lines between Ghatkopar and Bhandup stations from April 6th to 12th, 2024, to facilitate the installation of girders for the Vikhroli Road Over Bridge (ROB) project. This will impact train services, leading to short terminations, diversions, and cancellations of both...
more...
suburban and long-distance trains. Specific details include dates, times, affected train numbers, and affected lines. For example, on April 6th and 7th, trains 11020, 18030, 12810, 18519, 12134, 20104, 12702, 11140, 11402, and 12152 will be impacted, with some being short-terminated at specific stations and others arriving at their destination delayed. Suburban trains T 151, T 2, A 3, T 4, and T 6 will also be impacted, with some being short-terminated or cancelled and others being diverted on specific lines. Detailed information regarding specific dates, affected trains, and their impact is available in the provided text.

Central Railway (CR) Vikhroli ROB project ke liye girders lagane ke liye Ghatkopar aur Bhandup stations ke beech alag alag lines pe traffic power blocks operate karega. Yeh 6 April 2024 se 12 April 2024 tak hoga. Isse train services pe asar padega, jisse suburban aur long-distance trains short-terminate, divert...
more...
aur cancel honge. Dates, times, affected train numbers aur affected lines jaise specific details bhi diye gaye hain. For example, 6 aur 7 April ko, trains 11020, 18030, 12810, 18519, 12134, 20104, 12702, 11140, 11402 aur 12152 pe asar padega. Kuchh trains ko specific stations pe short-terminate kiya jaayega aur kuchh trains apni destination pe delayed pahunchengi. Suburban trains T 151, T 2, A 3, T 4 aur T 6 pe bhi asar padega, jinme se kuchh trains ko short-terminate ya cancel kiya jaayega aur kuchh trains ko specific lines pe divert kiya jaayega. Specific dates, affected trains aur unke impact ke baare mein detailed information diya gaya hai.
General Travel
75550 views
2

Apr 05 (21:47)   12152/Samarsata SF Express (PT) | SHM/Shalimar (Kolkata) (3 PFs)
DreamTrip22503^~
DreamTrip22503^~   43464 blog posts
Entry# 6020493            Tags  
Rescheduled by 6hrs 15 minutes ......
Translate to English
Translate to Hindi
Page#    956 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy