Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Poorva Express: हुगली सी बहती तेरी चाल है पूर्वा तू बेमिसाल है - Keshav Singh

Search Forum
Post PNR
Scenic; Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3378701-0
Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 3977679-0


Availability Calendar
Search WL to SC
Return# 12714
PDF Download

12713/Satavahana SF Express
शातवाहन सुपरफास्ट एक्सप्रेस

WL/Warangal --> SC/Secunderabad Junction

Updated: Mar 14 (09:23) by GujratMail^~
Mar 14 (09:23)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    428 blog entries  <<prev  next>>
General Travel
53613 views
7

Nov 25 2023 (11:34)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
NaagendraV
NaagendraV   290 blog posts
Entry# 5893062            Tags   Past Edits
1 compliments
Useful
List of new railway line/ routes at various states in SCR 2023-24.
-----------------------------------------------------------------------------------------------------------------------
SCR - Andhra Pradesh*************************

Preliminary Engineering cum Traffic Survey for byepass line connecting Vijayawada-Machilipatnam
section
...
more...
to (Vijayawada--Gudur section for Visakhapatnam traffic bound for Chennai and viceversa and thus avoiding Vijayawada Jn. (49 km)

Reconnaissance Engineering cum Traffic Survey for new line between Darsi and Narsaraopet (65 km)
Reconnaissance Engineering cum Traffic Survey for new line between Narsapur-Machhlipatnam ( 85km )
Reconnaissance Engineering cum Traffic Survey for Dharmavaram-Bellari new line (120 km)
Reconnaissance Engineering cum Traffic Survey for Mantralayam Road-Kurnool new line (110 km)

Final Location Survey for new line between Vijayawada- Guntur via Amaravati (106 km)
Final Location Survey for Doubling of Dharmavaram – Pakala – Katpadi (290 Km)
Final Location Survey for Doubling of Guntur – Bibinagar (248 Km)
RET survey for Muddanuru-Mudigubba new line (65Km)
Final Location Survey for doubling of Gooty-Pendakallu line (29 Km)
Final Location Survey for doubling of Pakala-Tirupatiline (42 Km)
Final Location Survey for proposed tripling bet. OBVP GTL
Final Location Survey for tripling between Renigunta-Gudur
Final location survey for tripling between Samalkot and Nidadavolu (72 Km)
Final Location Survey for 3rd line between BZA-NDD
Final Location Survey for Doubling Nallapadu-Krishna Canal (3rd and 4th Line) (33.62 kms.)
Final Location Survey for 3rd line between Vijayawada and Duvvada (335 km)

-----------------------------------------------------------------------------------------------------------------------------

SCR -Telangana: ************************************
1.Preliminary Engineering cum Traffic Survey for new line betwen Bodhan-Bidar (100 km)
2.Preliminary Engineering cum Traffic survey for third line between Secunderabad-Kazipet (134 km)
3.Preliminary Engineering cum Traffic Survey for doubling of Parbhani to Parli (67 km)
4.Preliminary Engineering cum Traffic Survey for byepass line at Purna (3 km)
5.Preliminary Engineering cum Traffic Survey for doubling of Secunderabad- Mudkhed- Adilabad (420km)
6.Preliminary Engineering cum Traffic Survey for Balharshah-Kazipet 4th line (234 km)
7.Preliminary Engineering cum Traffic Survey for Kazipet- Vizayawada 4th line (219 km) --

8.Reconnaissance Engineering cum Traffic Survey for Siddipet - Akkanapet (50 km)
9.Reconnaissance Engineering cum Traffic Survey for new line between Mancherail - Adilabad via Utrfoor (186 km)
10.Reconnaissance Engineering cum Traffic Survey for new line of Dornakal - Miryalguda (133 km)
11.Reconnaissance Engineering cum Traffic Survey for new line between Ghanpur and Surya via Palakutri, Kodakandla (170 km)
12.Reconnaissance Engineering cum Traffic Survey for new line between Kothagudem and Kirandul (180 km)
13.Reconnaissance Engineering cum Traffic Survey for new line between Bodhan - Biloli- Mudkhed-Jalkot- Latur Road (130 km)
14.Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantiji, Pandharkavadan, Chankha (100 km)
15.Reconnaissance Engineering cum Traffic Survey for new line between Patancheru - Sangareddy - Jogipet - Medak (95 km)
16.Reconnaissance Engineering cum Traffic Survey for new line between Nizamabad-Nirmal-Adilabad (125 km)
17.Reconnaissance Engineering cum Traffic Survey for new line between Manakondur - Huzurabad and Elkaturchi (60 km)
18.Reconnaissance Engineering cum Traffic Survey for new line between Karkheli-Narsi (30 km)
19.Reconnaissance Engineering cum Traffic Survey for new line between Bijapur and Warangal (288 km)
20Reconnaissance Engineering cum Traffic Survey for new line between Yavatmal-Adilabad via Ghantji- Pandharkavda-Chanakha (100 km)

21.Final Location Survey for new line between Bidar and Nanded (155 km)
22.Final Location Survey for doubling of Moulali-Sanathnagar line (21 Km)
23.Final Location Survey for doublin of Motamari- Vishnupuram line (89 Km)
24.Final Location Survey for Doubling of Dornakal-Manuguru line (104 Km)
25.Final Location Survey for Doubling betwwen Aurangabad and Ankai (98 Km) with bypass at Ankai
26.Final Location Survey for Doubling Secunderabad (SC)-Sanathnagar (S.NoF) 3rd line (19.18 kms.)
27.Final Location Survey for Doubling Secunderabad - Kazipet (85.48 kms.
28.Final Location Survey for Doubling Shankarpalli- Chittaguda (3rd and 4th Line) (19.22 kms.)
29.Final Location Survey for Doubling Sulehalli-Malkhaidroad (3rd and 4th Line) (17.18 kms.)
30.Final Location Survey for Doubling Tandur-Nawandgi(3rd and 4th Line) (18.95 kms.)
31.Final Location Survey for Doubling Vikarabad-Dharur (3rd and 4th Line) (22.27 kms.)
32.Final Location Survey for new line between Manuguru -Ramagundam
33.Final Location Survey for Bodhan-Bidar via Banswada New Line (138 Km)
34.Final Location Survey for Bye-pass line at Purna Jn to connect Purna-Akola line to Manmad-SC line (3.05 km)
35.Final Location Survey between Gangakher -Vadaganilla (DL)
36.Final Location Survey between Parbhani - Pokarni narasimha (DL)
37.Final Location Survey between Pokarni narasimha -Gangakher(DL)
38.Final Location Survey between Vadaganilla - Parli(DL)
39.Final Location Survey for 3rd line between SC-KZJ
40.Final Location Survey for 3rd line between SC-Wadi
41.Final Location Survey for 3rd line between SLODuvvada
42.Final Location Survey for Doubling Bhongir (BG)-Bibinagar (BN) 3rd Line (15 kms.)
43.Final Location Survey for Doubling Bhongir-Aler (3rdand 4th Line) (24.4 kms.)
44.Final Location Survey for Doubling Chitgidda (CTF) -Vikarabad (VKB) 3rd Line (9.93 kms.)
45.Final Location Survey for Doubling Dharur (DRR) -Tandur (TDU) 3rd Line (20.64 kms.)
46.Final Location Survey for Doubling Ghanpur-Raghunathpalli (3rd and 4th Line) (17.2 kms.)
47.Final Location Survey for Doubling Ghatkesar- Bibinagar (3rd and 4th Line) (14.25 kms.)
48.Final Location Survey for Doubling Kazipet-Ghanpur(3rd and 4th Line) (21.25 kms.)
49.Final Location Survey for Doubling Lingampalli-Shankarpalli (3rd and 4th Line) (22.29 kms.)
50.Final Location Survey for Doubling Nawandgi (NAW)- Malkhaid Road (MQR) 3rd Line (29.5 kms.)
51.Final Location Survey for Doubling Nizamabad Station(8 kms.)
52.Final Location Survey for Doubling Raghunathpalli(RGP)-Aler (ALER) 3rd Line (28 kms.)
53.Final Location Survey for Doubling Sanathnagar(S.NoF) -Lingampalli (LPI) 3rd Line (14.12 kms.)
54.Final Location Survey for Doubling of Akola – Dhone
via Purna, Mudhkhed, Secunderabad, Mehboobnagar
excluding Purna – Mudkhed and Bolarum –
Mehboobnagar including Dhone bye-pass (626 Km)

#Scr #SCRrailway #scrinfra
Please find the source as an attachment.

Translate to English
Translate to Hindi

6 Posts

24327 views
2

Nov 26 2023 (05:38)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-7              
Bro, e document financial year(2023-24) starting lo prepare chesindhi anukunta. document mottam lo Revised estimates unnai. pls see the attachment.
Translate to English
Translate to Hindi

19982 views
0

Nov 26 2023 (06:32)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-8               Past Edits
No.we are lived in such assumptions till now. since 1966 onwards importance/high priority given to Hyd,SC and nanded division, jurisdiction only and their needs. Requesting you to go through the previous railway budgets and proposal from SCR.
Translate to English
Translate to Hindi

20307 views
0

Nov 26 2023 (06:35)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-9              
if you considered high priority given to Andhrapradesh then from 1966 to till now under BZA,GTL why SCR constructed only one new lines. Krishnapatnam port to obulavaripalle, this project progress tracked by venkaiah naidu as a vice president. this track is used for goods transport now. except this i don't see any new routes/tracks/railwaylines.
Translate to English
Translate to Hindi

26463 views
1

Nov 26 2023 (10:37)
ssastronaut~
ssastronaut~   920 blog posts
Re# 5893062-10              
SCR should have more accurate.
25. Tenders allocation is in process for Aurangabad-Ankai doubling work.
# Final Location Survey is going for Aurangabad-Parbhani doubling.
Translate to English
Translate to Hindi

17073 views
0

Nov 26 2023 (11:24)
NaagendraV
NaagendraV   290 blog posts
Re# 5893062-11               Past Edits
This document may prepared beginning of the financial year 2023-24 post budget allocation. now almost, we are in last quarter of the financial year so might not have the latest Status.
Translate to English
Translate to Hindi
General Travel
142567 views
1

Nov 15 2023 (07:16)   12713/Satavahana SF Express | BZA/Vijayawada Junction (10 PFs)
sairailnetwork~
sairailnetwork~   469 blog posts
Entry# 5882329            Tags  
For Video: click here
Departing From Kazipet Junction And Crosses Nagarsol Super fast Express In 4k
#wag9 #train #4k #railway #ECOR #SCR #SR #SER #NR #NCR #er #video #lhb #trainjourney #railfan #trainvideos #kazipet #icf
Translate to English
Translate to Hindi
0
updating ...
10 wishes
शुभ यात्रा एवं जन्मदिन की शुभकामनाएँ உங்கள் பயணம் இனிதே அமைய வாழ்த்துக்கள் Happy Journey sir Happy Journey शुभ यात्रा शुभ यात्रा आपको सदैव हरी झंडी मिलती रहे Happy Journey Happy Journey Happy Journey
Off to Hyderabad for celebrating My mom's birthday, Diwali n my birthday. Taking The Secunderabad Duronto Express.

307 Posts

FmtBlog
8982 views
0

Nov 11 2023 (16:35)
DrSwaroop^~
DrSwaroop^~   109700 blog posts
Re# 5877497-308            Tags  
1 km from @LGD   2h 18m late
@LGD: Lallaguda Loco Shed &1 km/h $WAG-9+LGD hauled #12714: Satavahana SF Express crossed
Translate to English
Translate to Hindi

More Posts
0
updating ...
5 wishes
शुभ यात्रा शुभ यात्रा HJ Happy Journey शुभ यात्रा
Doing a trip after ages. Returning home for Navratri. Taking The Secunderabad Duronto Express.

245 Posts

FmtBlog
20840 views
0

Oct 14 2023 (16:31)
DrSwaroop^~
DrSwaroop^~   109700 blog posts
Re# 5851870-246            Tags  
@LGD 2 km <--> 1 km @SC   2h 13m late
@SC: Secunderabad Jn &12 km/h #12714: Satavahana SF Express crossed
Translate to English
Translate to Hindi

More Posts
Rail Fanning
247767 views
1

Sep 26 2023 (15:05)   12687/Madurai - Chandigarh SF Express (PT) | BZA/Vijayawada Junction (10 PFs)
RailwayFiles~
RailwayFiles~   236 blog posts
Entry# 5831260            Tags   Past Edits
12687 Madurai Chandigarh SF was badly trolled today. It was already rescheduled by 12 hrs. Departed BZA at 4:10 AM and arrived WL at 11:20 AM and departed at 12:20 PM after 1 hour halt. More than 8 hrs to cover a distance of 206 KMS. I was travelling by 18519 VSKP - LTT, departed BZA around 7:20 AM and reached WL at 10:45 AM. We overtook 12687 before Dornakal, before us it was already overtaken by 11020 Konark Exp, 12713 Satavahana SF exp and after us by 17201 Golconda Exp and 20833 Vandebharat. Same with prestigious 12621 Tamil Nadu SF Exp, it was overtaken by 20833 Vandebharat, 17208 BZA SNSI Exp and 18045 East Cost Express. TamilNadu departed BZA at 8:20 AM and reached WL at 2:45 PM, almost 6.5 Hrs.
Translate to English
Translate to Hindi

More Posts
Page#    428 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy