Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

रेलफैनों की तो बात ही कुछ और है

Search Forum
Post PNR
Medium; Side View; Small TB; Sleeper; Outside of Train; Standing at Station;
Entry# 4823456-0
no description available
Entry# 5520833-0


Availability Calendar
Search CLX to CGL
Return# 17643
PDF Download

17644/Kakinada Port - Chengalpattu Circar Express (PT)
काकिनाड़ा पोर्ट - चेंगलपट्टु सरकार एक्सप्रेस

CLX/Chirala --> CGL/Chengalpattu Junction

Updated: Jul 07 (15:34) by PrakharYadav^~
Jul 07 (15:34)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    1035 blog entries  <<prev  next>>
Info Update
39856 views
7

Mar 10 (17:05)   17644/Kakinada Port - Chengalpattu Circar Express (PT) | CCT/Kakinada Town Junction (4 PFs)
Boxerbhai_432~
Boxerbhai_432~   12143 blog posts
Entry# 5992942            Tags  
1 compliments
Useful
Circar news and kcg - cgl exp news
Translate to English
Translate to Hindi

27106 views
1

Mar 10 (17:07)
NaagendraV
NaagendraV   334 blog posts
Re# 5992942-1              
#eXtension2024 #eXtensionSCR2024
Translate to English
Translate to Hindi

24302 views
0

Mar 10 (17:16)
SaiCharan^~
SaiCharan^~   3448 blog posts
Re# 5992942-2              
So Wednesday avoided and benefit for hyb region and 3 days less frequency for coa region if it gets nod. Scr is very reluctant to remove this rsa and now quota should be made in a manner ms region to be taken care in return trip.
Translate to English
Translate to Hindi

24042 views
0

Mar 10 (17:19)
KaveriMail~
KaveriMail~   859 blog posts
Re# 5992942-3              
This will be a mess, all due to the RSA. Why can't they just combine Circar's rake with Gowthami or 17249/50 giving it a daily run to PDY.

17651/2 could be short-terminated at MS/TBM. No point in this RSA especially if the new Zone is coming up.
Translate to English
Translate to Hindi

23580 views
0

Mar 10 (19:47)
SRG^~
SRG^~   44887 blog posts
Re# 5992942-4              
Idhemi Circus ra ayya..
Translate to English
Translate to Hindi

23325 views
1

Mar 10 (19:48)
Boxerbhai_432~
Boxerbhai_432~   12143 blog posts
Re# 5992942-5              
Haha aaj matram undali ga circar ante
Sf matram discussion ravu
Translate to English
Translate to Hindi
Info Update
71489 views
7

Feb 21 (19:36)   17644/Kakinada Port - Chengalpattu Circar Express (PT) | CCT/Kakinada Town Junction (4 PFs)
PowerStar~
PowerStar~   2742 blog posts
Entry# 5975751            Tags   Past Edits
3 compliments
Useful Useful Useful
Circar, Cocanada CCT - TPTY VSKP - MBNR, Uday, Simhadri, Rayagada, JB, Ratnachal MTM - VSKP is cancelled 23 rd june to 10 AUG due to engineering works between RJY - NDD Section
Translate to English
Translate to Hindi

17 Posts

35407 views
0

Feb 23 (21:53)
PowerStar~
PowerStar~   2742 blog posts
Re# 5975751-18              
BZA division not Accepted holding the empty rake long duration at NS/ BZA/ BVRT so they cancelled 45 Days
Translate to English
Translate to Hindi

34693 views
0

Feb 23 (22:25)
CoringaExpress~
CoringaExpress~   5186 blog posts
Re# 5975751-19              
But that doesn’t mean dat its a right decision
Translate to English
Translate to Hindi

31436 views
0

Feb 24 (10:55)
deepak.yerr~
deepak.yerr~   6374 blog posts
Re# 5975751-20              
Bhimavaram Jn has 5PFs and 2 extra lines total 7 of which only 3PF are used rest are vacant throughout the day as they are no goods trains in BVRM Jn Narsapur section. They can send the Loco to Nsp for Loco pilot rest stop during day. VJA division is taking all wrong decisions. They have cancelled Simhadri and Uday for the past 8 months for safety related works. How can safety works take so long and where are they done? All trains are covering Vja Eluru section in 60-70mins as before. Yesterday seen a video in MYWAY Railway and trains are running at 60-80lmph in Mustabad Gundala section and the work done there is nothing in past 8 month except land leveling and pier construction with pier cap for crossing line and a culvert which don't effect mainline. Even NI works are completed in Augist and trains running on Third...
more...
line upto Gundala from Bypass. They have NDD GDV double line and Simhadri can be diverted and run. In past 5 yrs they are only 2 new slots created for Uday and VB yet why are they not able to manage the same traffic? It's just their illogical decisions and travellers are suffering in the division. Even Uday runs with good occupancy on Monday Friday and Sat and almost full in return from Vja and it starts at 1700 after work hours. What sort of right decisions are these?

Translate to English
Translate to Hindi

29698 views
0

Feb 24 (18:22)
PowerStar~
PowerStar~   2742 blog posts
Re# 5975751-21              
Better give same Suggestions to BZA division...
Translate to English
Translate to Hindi

27547 views
3

Mar 01 (18:25)
PowerStar~
PowerStar~   2742 blog posts
Re# 5975751-22               Past Edits
Nenu internal circular issue cheyku mundu forum lo post chesa 45 days few Exp / SF Trains Cancel chestaru ane.
Translate to English
Translate to Hindi
Rail Fanning
46411 views
2

Feb 20 (22:17)   17643/Chengalpattu - Kakinada Port Circar Express (PT) | MS/Chennai Egmore (11 PFs) | AJJ/WAM-46PE/21256
dsourav895~
dsourav895~   751 blog posts
Entry# 5975147            Tags   Past Edits
Throwback to the good old days !

A rusty Arakkonam (AJJ), WAM 4 6PE # 21256 waiting for starter at Chennai Egmore with 17643 Chennai Egmore - Kakinada Circar Express.

The 6P suffix
...
more...
indicates an arrangement of 6 traction motors in parallel while the other prevalent TM arrangement for WAM 4 was the 2S 3P configuration.

The 'E' suffix was used to differentiate locomotives equipped with air brakes only from the ones which had dual brakes (air & vacuum, DB suffix) and vacuum brakes. However, after a certain point of time owing to standardization, all WAM 4 units & other existing locomotives were configured as air brake only. Despite the standardization, sheds like Arakkonam, Vadodara & Vijaywada still continued with the 'E' suffix on their locomotives.

Circa, 2014.

Translate to English
Translate to Hindi
General Travel
222860 views
1

Feb 16 (01:18)   17652/Kacheguda - Chengalpattu Express (PT) | KCG/Kacheguda (5 PFs)
guest
Entry# 5970899            Tags   Past Edits
17652 KCG CGL express reservation suspended from 10 June 2024, where as 17651 and Circar express bookings are open as Usual only.
Seems to be like 𝐄𝐱𝐭𝐞𝐧𝐬𝐢𝐨𝐧 𝐭𝐢𝐥𝐥 𝐏𝐃𝐘/𝐕𝐌 or any route modulations
Translate to English
Translate to Hindi

More Posts
General Travel
28755 views
1

Feb 13 (17:55)   17643/Chengalpattu - Kakinada Port Circar Express (PT) | CCT/Kakinada Town Junction (4 PFs)
RoyalIndianRailways
RoyalIndianRailways   485 blog posts
Entry# 5968774            Tags   Past Edits
Why this train didn't have 1st Ac coach .beginning one and only daily train still didn't have 1st Ac coach. Railways and scr should add 1st Ac coach to this train.all kakinada based trains have 1st ac coach except this train.
Translate to English
Translate to Hindi

21154 views
0

Feb 13 (19:12)
KnightWarrior21
KnightWarrior21   77 blog posts
Re# 5968774-1              
Maybe after LHBfication, we can atleast expect an HA1.
Translate to English
Translate to Hindi

20577 views
0

Feb 13 (19:29)
kirk781^~   3757 blog posts
Re# 5968774-2              
It's an ICF rake currently, hence no H1. Let it wait for LHBfication. Eithercase, not every train needs AC 1st class. AC 2 Tier is many times enough justification for a route.
Translate to English
Translate to Hindi

18653 views
0

Feb 15 (16:30)
RoyalIndianRailways
RoyalIndianRailways   485 blog posts
Re# 5968774-3              
Their are many trains in lhb waiting list .so this train may get late for lhb
Translate to English
Translate to Hindi
Page#    1035 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy