Traffic Block of Sadar Washing line/Lucknow from 18.08.2023 to 16.12.2023 (120 Days) for Up-gradation of 26 Coach Length New Washing Line as per latest CAMTECH drawing.
At Present, Primary Maintenance. of t.no. 12232/12231/14218/14217 (No. of rakes-4, Load-24 coaches ICF at Present) is done at Sadar Washing line Lucknow
During traffic block Rakes of 12231/14218/14217/12232 Will get Primary Maintenance at...
more... PYGS with insertion of one Scratch rake of same composition ex PYGS to work. as 14217 daily, Incoming rake of 14218 will get Primary Maintenance at PYGS. (No. of rakes-5, Load 24 ICF coaches. each).
please wait...Translate to HindiTraffic Block Sadar Washing line/Lucknow mein 18.08.2023 se 16.12.2023 tak (120 din) hai, kyunki 26 Coach Length ka naya Washing Line upgrade ho raha hai latest CAMTECH drawing ke hisaab se.
Filhal, t.no. 12232/12231/14218/14217 (Rakes ki sankhya-4, Load-24 coaches ICF abhi) ka Primary Maintenance Sadar Washing line Lucknow pe hota hai.
Traffic block ke dauran, 12231/14218/14217/12232 ke rakes ka Primary Maintenance PYGS mein hoga, ek Scratch rake ko same composition se ex PYGS se kaam karne ke liye dalne ke saath, jo rozana 14217 ki tarah chalega, aur aane wala rake 14218 ka Primary Maintenance PYGS mein hoga. (Rakes ki sankhya-5, Load 24 ICF coaches har ek).