Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

Sri Jagannath Express is as good as Abada Prasad - Brandon Buffard

Search Forum
Post PNR
Availability Calendar
Search MCN to DHN
Return# 13351
PDF Download

13352/Alappuzha - Dhanbad Express (PT)
Other Names: Bokaro Express
आलप्पुऴा - धनबाद एक्सप्रेस

MCN/Mukundarayapuram --> DHN/Dhanbad Junction

Updated: Apr 13 (15:00) by ProRF.^~
Apr 13 (15:00)
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    2073 blog entries  next>>
Rail News
5733 views
0

IR Affairs
SER/South Eastern
Yesterday (06:57)   Alappuzha-Dhanbad Express to Operate on Alternate Route due to Block on South Railway Network

AdittyaaSharma^~   72978 news posts
Entry# 6179334   News Entry# 568119         Tags   Past Edits
read full article... अल्लापुजा एक्स. परिवर्तित मार्ग से चलेगी

Due to a block on the South Railway network, train number 13352 Alappuzha-Dhanbad Express will operate on an alternate route between Pottonur and Irugur on September 6th, 8th, 9th, 11th, 13th, 15th, 16th, 18th, 23rd, and 25th. This change in route will affect the train's schedule.

South Railway network pe block ki wajah se, train number 13352 Alappuzha-Dhanbad Express, 6, 8, 9, 11, 13, 15, 16, 18, 23 aur 25 September ko, apna normal route ke jagah, Pottonur-Irugur route se jayegi. Is route change se train ka schedule affect hoga.
Rail News
5614 views
0

IR Affairs
ECR/East Central
Yesterday (03:51)   Alleppey-Dhanbad Express Route Change Due to Block on Southern Railway

AdittyaaSharma^~   72978 news posts
Entry# 6179309   News Entry# 568108         Tags   Past Edits
read full article... 10 दिन पोत्तनूर होकर लौटेगी एलेप्पी एक्सप्रेस

The 13352 Alleppey-Dhanbad Express, usually departing from Alappuzha, will run between September 6th and 25th via the Pottnur-Irugur route instead of Coimbatore. This change is due to a block on the Southern Railway. The train will halt at Pottnur station on these days.

13352 Alleppey-Dhanbad Express, jo aamtaur pe Alappuzha se chalti hai, 6 se 25 September tak Coimbatore ki bajaaye Pottnur-Irugur se hoke chalegi. Ye change Southern Railway mein block ki wajah se hai. Train Pottnur station pe in dino rukengi.
Rail News
6919 views
0

SER/South Eastern
IR Press Release
Sep 04 (21:22)   Southern Railway Train Route and Stoppage Changes Due to Development Work

Jayashree^   51498 news posts
Entry# 6179080   News Entry# 568079         Tags   Past Edits
read full article... REGULATION OF TRAINS DUE TO DEVELOPMENTAL WORKS IN SOUTHERN RAILWAY

Due to development work on the Southern Railway, several trains will have their routes changed and stops adjusted between September 6th and 25th, 2024. Trains 13352, 22504, 22644, 12660, and 12508 will be diverted to use the Podanur-Irugur route, skipping Coimbatore but stopping at Podanur on specific dates. Additionally, train 12516...
more...
will be short-terminated at Coimbatore North on September 3rd and 10th.

Southern Railway pe development kaam chal raha hai, isliye September 6th se 25th tak, kuch trains ka route aur stops badal diye gaye hain. Train 13352, 22504, 22644, 12660, aur 12508 ko Podanur-Irugur route pe chalaaya jaayega, Coimbatore skip ho jaayega, lekin Podanur pe rukenge. Aur train 12516, September 3rd aur...
more...
10th ko Coimbatore North pe short terminate ho jaayegi.
Poll
4498737 views
143 votes
2

May 27 2016 (19:42)   11077/Jhelum Express (PT) | PUNE/Pune Junction (6 PFs)
 
AmravatiSuperfast~
AmravatiSuperfast~   599 blog posts
Entry# 1867072            Tags   Past Edits
Here is the Zone-wise list of LONGEST ORDINARY DAILY MAIL/EXPRESS (not SF) trains. Which train is BETTER and has a fair/best speed, punctuality, cleanliness, coach condition, ticket availability, catering facilities despite their long journeys. And which zone you feel is better in management of these trains??
Translate to English
Translate to Hindi
NO vote
CR. 11077/8 Pune - Jammu Tawi Jhelum Express (2176 km)
24%
35
ECR. 13351/2 Dhanbad - Alappuzha Express (2537 km)
11%
16
ECoR. 18477/8 Puri - Haridwar Kalinga Utkal Express (2366 km)
1%
2
ER. 13151/2 Kolkata - Jammu Tawi Express (1986 km)
3%
4
NCR. 11123/4 Barauni - Gwalior Mail (1055 km)
3%
5
NER. 15017/8 LTT Mumbai - Gorakhpur Kashi Express (1710 km)
5%
7
NWR. 14707/8 Bikaner - Mumbai Bandra Ranakpur Express (1215 km)
3%
5
NFR. 15909/10 Dibrugarh - Lalgarh Avadh Assam Express (3118 km)
2%
3
NR. 14055/6 Dibrugarh - Old Delhi Brahmaputra Mail (2597 km)
1%
2
SCR. 17229/30 Trivandrum - Hyderabad Deccan Sabari Express (1577 km)
12%
17
SECR. 18237/8 Bilaspur - Amritsar Chhattisgarh Express (2012 km)
8%
11
SER. 18189/90 Tatanagar - Alappuzha Link Express (2362 km)
1%
1
SWR. 16593/94 HS Nanded - KSR Bengaluru Express (1030 km)
0%
0
SR. 16381/2 CST Mumbai - Kanniyakumari Jayanti Janta Express (2130 km)
1%
1
WCR. 11447/8 Jabalpur - Howrah Shaktipunj Express (1144 km)
12%
17
WR. 19023/4 Mumbai - Firozpur Janta Express (1773 km)
0%
0
KR. 10111/2 10103/4 CST Mumbai - Madgaon Konkan Kanya/Mandovi Express (581 km)
12%
17

More Posts
Travelogue
207346 views
36

★★★
Jul 25 (02:11)   12376/Jasidih - Tambaram Weekly SF Express (PT) | ASN/Asansol Junction (7 PFs)
Arnab_K~
Arnab_K~   9271 blog posts
Entry# 6135524            Tags   Past Edits
18 compliments
Useful Great Great Great Useful:Nice write up. Useful _/\_ Useful Great Great Great:This write-up 👌🏻 Great Useful Great Useful Great Great Great
When it was introduced circa 2011-2012, the Asansol - Chennai Egmore Weekly was a game changer for the Shilpanchal area. Prior to the introduction of Ratna, barring a few long distance weeklies (Vivek, PNBE-ERS) etc these areas were totally were at the mercy of trains from Kolkata and Kharagpur for trains bound for Chennai.

Over time, this once fantastic train has experienced a lot of changes , some favourable, some decisively unpleasant. This train used to take the shortest route between Asansol and Egmore baring the slight deeper detour to accomodate Visakhapatnam
...
more...
Junction.
It was then subsequentally extended to Jasidih on one side and Tambaram on the other side, downgraded to an express status, and then again upgraded to a superfast status.

Recently I had the misfortune/fortune to have taken this train from Asansol to Tambaram. My first choice, Coro filled up quicker than I could end up booking on the Tatkal quota, I was faced with the dilema of choosing between Ratna and Dhanbad Allepey Express. Obviously I went with common sense and booked a 2AC ticket to Tambaram.

I reached Asansol by car from Dhanbad at 2:55 PM sharp. Imagine how pleasantly surprised I was to learn that 12376 would arrive at Asansol at platform 6. A quick glance at the train TT would ensure that my bubble of happiness was popped instantly, the slack between Chittaranjan and Asansol was enormous!

Anyways I quickly boarded my reserved berth, a pristine clean side lower berth. As it is my customary for my solo trips my customary crepe bandage was back on my right leg to disuade any prospective aunties and uncles asking me to swap their berths with them. The AC was switched off as the locomotive had still not being attached at the Sitarampur end.

The train was fully packed at Asansol and after a prolonged halt of 1 hour departed at 4 PM sharp. The fully 22 coached train overtook the Shaktipunj express standing on the adjacent platform and slowly crawled into the Adra bound line. We slowly curved out of the Grand chord line and slowly gained speed as we crossed the BNR bridge. However true to it's nature, SER soon ensured that our train got it's unscheduled halt at Burnpur.We departed 5 minutes later.

We continued at decent pace (not 110 mind you) up and until we reached the first scheduled halt Joychandi Pahar Junction. We were about 10-15 mins delayed. 3-4 mins later we were off towards Purulia. The stop and start drama continued and by the time we reached Purulia we were delayed by 20-25 mins. We stopped here briefly around 10 odd minutes.

This however was a mild annoyance to what we were subjected to up next. It was almost akin to this stretch being the trailer and the film set to follow up next! By the time we reached Barabhum we were nearly 40-45 minutes. By the time we reached Chandil we were delayed by 1 hour. A 55 minute held up at Chandil ensured our delay had become about nearly 2 hours. As someone who knows this route all too well, I knew things only get worse as we had entered the area that I refer to as the Tatanagar delay corridor.

Coincidentally I had booked dinner at Rourkela as I wanted to actively avoid the pantry car food. As you might have realised, my fooding ambitions went up in flames courtesy the fantabolous controlling exhibited by Adra and CKP division respectively.

The train was then overtaken by a combination of a freight and a MEMU train. Somehow we reached Kandra with a delay of 2 hours 20 minute delay. Stopped for a further 25 minutes. It was during this time, that I got a call from the food delivery guy asking for my permission to cancel the order, as the train was scheduled to arrive at Rourkela well past midnight. I duly complied and went up to the pantry car angry and with rats running amok in my stomach. I asked whether there was any remaining food. What I got instead was a salty porridge that was supposed to be an egg meal.

By the time we rolled into Chakradharpur, it was nearly 11 PM, I was simply too tired and had resigned duly into my berth. When I woke up, we were at Balangir delayed by more than 4 hours! We rolled into Titlagarh at about 7, I tried for some breakfast, but couldn't find any thing substantial! I kept doorplating for the next two hours, in the meantime the pantry guys tried to sell off breakfast combo (egg omelette, veg cutlet) etc. I had seen them prepare them prepare those the previous night, they were just warming those and selling them off! Trust me, once you have been inside of a pantry car, you won't feel like eating anything from there!

We were more than 5+ hours delayed when we rolled into Rayagada. It had started raining and even the red coloured soil and the picturisque Odisha landscape couldn't cheer me up. The train was barely touching the maximum permissible speed for some stretch and then stopped and started...

The train picked up sustained speeds post joining the Howrah Madras mail line at Vizianagaram ! We reached Vizag at nearly 1 PM but it was likely the only stretch where we actually made up some time. When we reached Vizag, it had started raining very heavily! I somehow ran up to platform number 1, and got some decent food from the IRCTC canteen.

Meanwhile a Kolkata bound train and Allepey Dhanbad got priority over us and we were held up nearly half an hour! I am pretty sure nobody complained as almost my entire coach deboarded and got food for themselves! We departed and actually got a decent run in Waltair division. The moment we entered Bezewada division, we started getting detained more frequently !
We were detained for a long time at Pithapuram, and by the time we rolled into Samalkot, our delay increased to nearly 5.5 hours. It was raining very heavily and it was quite clear that coastal Andhra was receiving huge amounts of rains.
By the time we rolled into Rajahmundry, we had settled into a steady 6 hour delay.
Our train was set to be diverted between Nidadavolu and Vijayawada by Bhimavaram Gudivada, and the disapointment that had set on my mind started to be converted into slight hope and happiness! There has been a slight hope that had started forming that the train gets so delayed that we reach Chennai in the morning...
We had reached Vijaywada bulb cabin with a delay with a 6.5 hours! By the time we reached Vijayawada we were delayed by 7.5 hours.
10 minutes of halttime and we were off! Oh! , in the meantime I had ordered dinner from Vijayawada. The delivery guy cancelled the order and called me citing very heavy rains! Rather than to to the pantry again, I bought a passable meal from Vijayawada Junction...
Had my meal, and went to bed but lay awake. The train actually ran very well post Vijayawada, and actually ran at the maximum permissible speed for sustained times! The train actually didn't lose any much time and actually ran well until TADA where it reached SR territory from where on it was held up for really long time...
We were held up for more than an hour in Tondiarpet and Washermanpet combined, and then got held up in Royapuram and Chennai Beach...
We reached Egmore at around 5 AM and departed 10 minutes later.
Almost the entire train deboarded at MS, and the train started moving towards to the train's terminus Tambaram.
Unfortunately for the select few like yours truly who had chosen to deboard at Tambaram, there were a few last minute trolling left to be endured! We were held up for over an hour at Minambakkam, and I actually had a good hour of planespotting at the magnificent Chennai International airport, then we were held up again for a long time at Pallavaram, and all I could see was tall grass and Chennai Beach and Chengalpattu/Tambaram overtaking/crossing us! There were also some long distance trains crossing us...
We finally made into Tambaram at 7 AM, and I wearily trudged towards my final destination....

Overall positives :-
OBHS facilities and on board train maintanence is top notch. Asansol division does a tremendous job in maintaining this train.
Negatives :-
Pantry facilities could be better!
The route is a disaster. It is clear that Chakradharpur division is incapable of runnning this train on time. This train should be either re-routed ASAP via ADRA-BQA-HIJ-BBS route or DHN-BKSC-RNC route to improve punctuality!

As I see even today's train get held up and delayed between PRR and CKP, I sign off expecting your comments and views to be present when I sign in back in the morning. It is clear something has to be done regarding this train, also apologies if my writeup was shoddy, been years since I wrote a travelogue here. Also no pictures, so apologies for that too...
Signing off
--- Arnab

Translate to English
Translate to Hindi

More Posts
Page#    2073 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy