Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

เคถเคฟเคต เค•เฅ€ เคœเคŸเคพเค“เค‚ เคธเฅ‡ เคฌเคนเคคเฅ€ เคนเฅˆ เคถเคฟเคต เค—เค‚เค—เคพ - Divyanshu

Search Forum
<<prev entry    next entry>>
Blog Entry# 5950311
Posted: Jan 23 (20:17)

8 Responses
Last Response: Feb 04 (22:17)
1 Followers
General Travel
252917 views
4

Jan 23 (20:17)   17230/Sabari Express (PT) | SC/Secunderabad Junction (10 PFs)
guest
Entry# 5950311            Tags   Past Edits
๐‹๐ˆ๐…๐„๐‹๐Ž๐๐† ๐ˆ๐‚๐… ๐„๐—๐๐‘๐„๐’๐’ ๐Ž๐… ๐ˆ๐๐ƒ๐ˆ๐€๐ ๐‘๐€๐ˆ๐‹๐–๐€๐˜๐’
๐Ÿ๐Ÿ•๐Ÿ๐Ÿ๐Ÿ—/๐Ÿ๐Ÿ•๐Ÿ๐Ÿ‘๐ŸŽ
Sabari Express so called "Joker of Both SCR and SR". Such a great train of IR which runs daily between the City of Nizams and Gods own country by covering a dist of 1555km and one of the highest revenue generating trains of both the zone's but still the "train is ICF", Good point about this train is It literally cant survive without RSA. Its always a "inky pinky ponky" for both zones for making it LHB because of ODD arrival at its Home station. Even
...
more...
the officials are Least bothered for this train.
If Both zones really have a concern regarding the train why arent they changing its timings and schedule and arrange a suitable RSA. no no one is cared about it, the reason for low occupancy of SC TPTY padmavathi is just because of its worst OEM done after the sabari returning from TVC, RSA should be reasonable. Lets hope that atleast in this year 2024 It will get LHB.

Translate to English
Translate to Hindi

4 Posts

29001 views
1

Feb 03 (03:55)
DanielSebastian~
DanielSebastian~   4229 blog posts
Re# 5950311-5              
NS, CCT/COA, MTM, all these depots do top notch maintenance of their trains. Sabari rarely used to be delayed because of it's slack filled schedule but that changed with maintenance works in SR after a derailment. The delays started from then onwards and it used to run 2 hrs late on a daily basis and used to trail 16382 back then which had a much slower schedule than this, which added up more delay. HYB wouldn't bother with the delay as they used to send the same rake as 17256, which affected it's maintenance. Not sure how NS talked out of this arrangement and now maintenance of Sabari is in the hands of TPTY. TPTY isn't the best when it comes to maintenance. Falcon used to have RSA with Narayanadri, maintenance was horrible even then.
Translate to English
Translate to Hindi

22573 views
0

Feb 04 (20:14)
Railfan_SRDiv^~
Railfan_SRDiv^~   2420 blog posts
Re# 5950311-7               Past Edits
Narayanadri became more worse now cause of its new RSA and less standing time at Lingampalli. SR is too lazy enough to take any trains.

I think its better if they speed up Sabari and could give better RSA than present RSA. It requires only 3 rakes. SR or SCR could operate it as individual train if they think so. After all its the only dedicated train between Keralas state capital that connects with Hyd
Translate to English
Translate to Hindi

20316 views
0

Feb 04 (21:26)
Member115207AKA281110~
Member115207AKA281110~   1377 blog posts
Re# 5950311-8              
1 compliments
Disagree:can't expect it to come aodd times
@5950311-0  @guest
it must be speeded up. 17230:- SC 23.45; 282 GNT 04.35/45; 307 TEL 05.15/17; 415 OGL 06.47/49; 531 NLR 08.28/30; 569 GDR 09.27/32; 652 RU 10.55/11.05; 662 TPTY 11.20/25; 767 KPD 13.26/31; 851 JTJ 14.53/55; 1131 CBE 19.35/45; 1334 ERN 23.40/50; 1490 QLN 02.50/55; 1555 TVC 04.10|| 17229:- TVC 08.55; TPTY 01.45; SC 13.20|| 1555 kms in 28 hrs 25 mins @ 54 kph.
Translate to English
Translate to Hindi

21376 views
1

Feb 04 (22:17)
DanielSebastian~
DanielSebastian~   4229 blog posts
Re# 5950311-9               Past Edits
I would say no matter how much SCR speeds it up it will go up to 28 hrs, with less TAT on either side of its terminal, which will delay the train horribly in case of diversion. It will result in higher cancellation. Rather they should speed it up reasonably and maybe extend it to Nanded with PM at NED with General Quota upto charlapalli, which will be the only connection from NED, NZB to southern AP. 4 rakes will be needed anyway and that will guarantee it. Then in that case, Sabari can simply run upto Kanyakumari in case of space issues at TVC.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy