Search Forum
Filters:
May 03 (06:56) 13424/Ajmer - Bhagalpur Weekly Express | PNBE/Patna Junction (10 PFs)
VedantKumar_Biharsharif_P~
VedantKumar_Biharsharif_P~ 6649 blog postsD.O.J. - 08-06-2024 (Saturday)
Train No. 13424 AII BGP Express
From - KOTA
To - PNBE
Class - 2A
RLWL7...
more...
Train No. 13424 AII BGP Express
From - KOTA
To - PNBE
Class - 2A
RLWL7...
more...
90 Posts
That was a expected one. Quite possible kota se HO allocation hogi hi nahi. Apply HO in 13240, usme easily apply ho jayegi
HO thaa KOTA se A1 31 aur 32, bat ho sakta ho koi aur bhi apply kiya ho, 13240 mai HO laga diye hai
Woh papa ke ek dost Kota DRM office mai hai, to wo ek PDF bhejethee usme har train mai no. of HO quota berths ka detail thaa jo KOTA se cross karti hai
In protest of Daily Late running of all trains in SER KGP Division, Rail Roko will be done on 04.09.2023.
Posters given. Much needed step. Everybody should support this, daily late running trains causing problem to all passengers. Please plan accordingly your travels
Posters given. Much needed step. Everybody should support this, daily late running trains causing problem to all passengers. Please plan accordingly your travels
73 Posts
Daily passengers association submitted their letter to Railway Minister in presence of BJP MP Midnapore about the daily late running of trains in SER. RM was in kharagpur for election campaign for BJP MP Midnapore. RM agreed to look into the matter and take steps to solve the problem of daily late running of trains in SER after election.
and say special thanks to ser for ruining 12129/30 from last 2 weeks daily this train running 12+ hrs late secr already doing torture with this train and ser giving more torture to azad hind exp
The present RM is just a Yes Man. He has no spine of his own. His shamelessness was full on display at Bahanaga Bazaar Incident.
This is very weird. When I traveled in SER section [usually b/w KGP-HWH], the local trains and even express ones like Ispat and Steel were bit punctual and there was little delay if any[like ~15-30 mins at best and that too, post Santragachi]. EMU trains usually ran on time upto SRC. Didn't knew that situation had deteriorated this much.
On the DN side back then, trains very much ran on time too, except when accidents took place. I once missed my connecting train from TATA but that was because an accident had...
more...
On the DN side back then, trains very much ran on time too, except when accidents took place. I once missed my connecting train from TATA but that was because an accident had...
more...
Late running of trains continues in SER. Just few screenshots. Almost 90% trains all over SER is running late everyday.
Ashwini vaishnav is a totallly failed RM in the history of IR and should be removed immediately.
Ashwini vaishnav is a totallly failed RM in the history of IR and should be removed immediately.
Dharwad Belgavi new line alignmnent starts at 6km from Dharwad and ends at 11km before Belgavi and the total route length of new line will be 73km and distance is 90km. The present route length via londa is 122km and a distance of 32km will get reduced.
Attached Chainage of new line with km source Bellari jn Facebook page.
Attached Chainage of new line with km source Bellari jn Facebook page.
AS per google latest image it seems old building is dismantled and new station building has been constructed. Also it seems two new platform being constructed. if member from Gonda side can verify.
1 Posts