Search Forum
Blog Entry# 1962037
Posted: Aug 13 2016 (23:25)
6 Responses
Last Response: Aug 17 2016 (17:00)
6 Responses
Last Response: Aug 17 2016 (17:00)
IR Affairs
ML/Mumbai Local
I.R.needrejuvenation~ 949 news posts
What is happening on Central Railway Mumbai right now is one of the biggest planning failures of Mumbai. If, after running the highest number of train...
1 Posts
11 paise is se bhi sasta hoga if MSt &QST ticket passes. Rail roko for delay in trains without realizing that rail roko in form of chain pulling , on track accident is responsible for delay. Wajah bhi khud aur dikkat bhi khud ko hai.
Manav jaati h bhai, problem khud khadi krte h log aur solution b nikalte h phir, isi chakkar me desh aage nhi bdh pata
problem is lack of spending in infrastructure like dedicated lines for locals. if land is not available make provision for elevated corridor. if that is not feasible, then construct metros over major roads. There are lot of solutions but this is possible only if there is a political backing which is not there for the far flung areas like diva, badlapur, vasai-virar etc.
Har chiz k ly pesa chahiye, tickets pehle hi sasti h aur pesa kaha se lae, bs political chizo se blame kia jata h projects ko, metro b dhire dhire extend ho rhi h, ab ek dum boost to nhi ho skta h
good point and seriously agree to what have been typed down. But like to add a point is .. even the people should contribute towards keeping the rails and roads safe.. hard to achieve is a fact though .. :(