Konkan Railway invites Composite Open Tenders ( Electrical traction, S&T and civil works combined) for Railway Electrification of its entire Route ( 970 TKM).Work is divided...
5 Posts
Good News!
-
Similarly they could have started with the electrification of the existing line of CR: GR-DD. That will work out to a lesser cost than waiting for the stretch to be doubled first and then electrified.
-
Similarly they could have started with the electrification of the existing line of CR: GR-DD. That will work out to a lesser cost than waiting for the stretch to be doubled first and then electrified.
Doubling will take more than a decade,electrification will complete fast
For doubling jada land acquisition ki jarurat nai..kuch kuch jagahi hi pad Santa he...
Already 30-40 mtr land acquired by konkan railway...in 90s
Already 30-40 mtr land acquired by konkan railway...in 90s
Railway Electrification of KRCL( Verna -Thokur section)-Corrigendum - NIT No.KR/CO/EL/RE/Roha-Verna/01 dated 28.10.2016 Click Here
click here
Pre-bid conference re-scheduled on 21st November 2016, Tenders due to open on 15th December 2016.
Pre-Bid conference postponed to 21st Nov 16
click here
Pre-bid conference re-scheduled on 21st November 2016, Tenders due to open on 15th December 2016.
Pre-Bid conference postponed to 21st Nov 16