Today's photos on Binny Mill stabling line situated south of SBC. Line laying is over both before and after girder bridges. Engine roll on was done yesterday on one line. Crossing points have to be done. The entire work work may be over by Month end. Few photos are enclosed
3 Public Posts - Wed Feb 07, 2018
2 Public Posts - Thu Feb 08, 2018
6 Public Posts - Fri Feb 09, 2018
There is switch from the PF8 line to the PF9 line a short distance after the beginning of the PF9 (Roughly 2 coach lengths behind the starter on PF8) . So, trains can also be moved to PF9 from this shunting line. Only PF10 is not connected directly to these lines.
2 Public Posts - Sat Feb 10, 2018