Search Forum
Blog Entry# 3178659
Posted: Mar 07 2018 (08:50)
5 Responses
Last Response: Mar 08 2018 (13:22)
5 Responses
Last Response: Mar 08 2018 (13:22)
IR Affairs
NR/Northern
AdittyaaSharma^~ 67693 news posts
केंद्रीय रेल विद्युतीकरण संगठन (कोर) के महाप्रबंधक को हटाया गया1
कार्रवाई...
कार्रवाई...
3 Public Posts - Wed Mar 07, 2018
BG track standard is clipped at 160kmph design speed since decades. If IR construct tracks for much higher axle load & higher permissible speed with stronger foundations, heavier rails, sturdier sleepers, better signalling etc, then steep cost escalation is justified.
1 Public Posts - Thu Mar 08, 2018