Blog Entry# 3209161
Posted: Mar 16 2018 (15:01)

3 Responses
Last Response: Mar 16 2018 (20:22)
Rail News
10339 views
2

New Facilities/Technology
WCR/West Central
Mar 16 2018 (00:00)   15000 करोड़ खर्च होंगे रेल ट्रैक के इलेक्ट्रिफिकेशन पर, रेलवे हर साल बचाएगा 12370 करोड़ रुपए

A2Z~   12817 news posts
Entry# 3209161   News Entry# 331511         Tags   Past Edits
कोटा. रेलवे ने 2021 तक अपने सभी डीजल इंजन बंद करने का लक्ष्य तय किया है। इसके लिए देश के 20202 किमी रेल मार्ग को विद्युतीकृत...

9938 views
0

Mar 16 2018 (15:01)
A2Z~
A2Z~   17505 blog posts
Re# 3209161-1              
* Benefits of the total electrification by 2021 shall be realized only if the requisite number of electric locos are inducted into the system * Requirement of E-locos shall be is huge:
(1) Replacement of existing 5000+ D-locos, (3500-5500)
(2) replacement of condemned E-locos (400-1000) as well as
(3) extra E-locos required to haul the incremental traffic generated in next 3-4 years (600-1000).
...
more...

* On the other hand production capacity is very less
(1) CLW- is about only 250-300 locos/yr (1200-1600 E-loco in next 4 years)
(2) DLW- Switch over from D-loco to E-loco production shall take some time (500-1200 E-locos in next 4 years)
(3) ELF Madhepura- Capacity shall gradually be increased to 100 loco/yr by 2021 (200-500 Elocos in next 4 yrs)
* Figure of saving Rs. 12370 crore with expenditure of Rs. 15000 crores i.e. payback of more than 80% of total cost in just 1 years appears to be highly inflated and is hard to digest.
* If electrification of BG is actually completed by 2021, we will find a large number of D locos operating on newly electrified section which will be a fouble edged sword injuring Ir from both the edges, i.e. high electrification cost of newly electrified sections and huge diesel bill to operate DLocos on the electrified sections. In other words, too quick electrification may make electrification project itself a loss making one for IR.

Translate to English
Translate to Hindi

9666 views
0

Mar 16 2018 (20:13)
mazhar.nfr~
mazhar.nfr~   1892 blog posts
Re# 3209161-2              
Not possible b4 2025
Translate to English
Translate to Hindi

9677 views
1

Mar 16 2018 (20:22)
SaurabhDubey^~
SaurabhDubey^~   30258 blog posts
Re# 3209161-3              
Electrification speed and eloco production rate should be synchronized
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy