After extensive engineering repairs, a four coach train negotiated the Z reverse at km 26 of World Heritage Darjeeling Himalayan Railway today.Massive landslides had damaged Tindharia area of DHR in 2012. @RailMinIndia sparing no effort for Heritage conservation.
Source-click here
Source-click here
15 Public Posts - Mon Mar 19, 2018
thanks, never knew there was a catch siding there too
that bridge is planned to be demolished though, loads of complaints by drivers as the piers of the bridge obstruct the movement of traffic on the already congested section of expressway.
another piece of history about to be demolished :(
that bridge is planned to be demolished though, loads of complaints by drivers as the piers of the bridge obstruct the movement of traffic on the already congested section of expressway.
another piece of history about to be demolished :(