Nov 17 2018 (19:28) BAY/Ballari Junction (Bellary) (4 PFs)
SteelCityRF^~
SteelCityRF^~ 27572 blog postsRail fanning at #BallariJnouter (towards Guntakal side) on #November15th2018
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
🔸 #Electrificationupdate of RUB 266A (locally known as Durgamma temple bridge) and ROB 267B (locally known as Satya Narayana Pet bridge) section from 208.9 km to 209.8 km (towards Guntakal side)
1) RUB 266A
2) 1st line towards left is up line. 2nd line towards right is down line
⏺️Adjacent...
more...
23 Public Posts - Sat Nov 17, 2018
7 Public Posts - Sun Nov 18, 2018
21 Public Posts - Mon Nov 19, 2018
When SBC-UBL can start without RE at UBL so in same sense GDG-HG RE might starts from GDG side or they might start for already doubled sections because SWR will do its works under its area from HG outer to GDG and we already have 42.5km doubled from lachyan to Minchinal and now upto march-2019 71km will be doubled making 113.5km doubled from lachyan to Wandal so where they can start OHE pole digging process and OHE pole installations but everything is in NTPC hand if it pressurises IR then cant say GDG-HG might be the one get RE before SBC-UBL stretch.