Search Forum
Blog Entry# 5193333
Posted: Jan 18 2022 (17:48)
14 Responses
Last Response: Jan 27 2022 (22:15)
14 Responses
Last Response: Jan 27 2022 (22:15)
SWR should make loopline linking Hosur YPR bypass line and SMVB YPR main line.
Now that terminal is not yet inaugurated, necessary modifications can be planned and executed.
Such a link loop line will help in running trains from YNK side to Hosur side without loco reversal. Will help in speeding up of trains like LTT CBE.
Now that terminal is not yet inaugurated, necessary modifications can be planned and executed.
Such a link loop line will help in running trains from YNK side to Hosur side without loco reversal. Will help in speeding up of trains like LTT CBE.
1 Public Posts - Tue Jan 18, 2022
2 Public Posts - Thu Jan 20, 2022
2 Public Posts - Sun Jan 23, 2022
6 Public Posts - Tue Jan 25, 2022
1 Public Posts - Thu Jan 27, 2022
There are 3 possibilities to link Hosur line to YNK line.
1. Near Lottegollahalli, by way of a bridge across outer ring road. requires more engineering, but definitely possible.
2. Near SMVB terminus. Trains can make a circular route and move to other line. This is what you mentioned as black line. Definitely possible, but will should be there.
3. Near SMVB bypass...
more...
1. Near Lottegollahalli, by way of a bridge across outer ring road. requires more engineering, but definitely possible.
2. Near SMVB terminus. Trains can make a circular route and move to other line. This is what you mentioned as black line. Definitely possible, but will should be there.
3. Near SMVB bypass...
more...
1 Public Posts - Thu Jan 27, 2022