Search Forum
Blog Entry# 5193333
Posted: Jan 18 2022 (17:48)
14 Responses
Last Response: Jan 27 2022 (22:15)
14 Responses
Last Response: Jan 27 2022 (22:15)
SWR should make loopline linking Hosur YPR bypass line and SMVB YPR main line.
Now that terminal is not yet inaugurated, necessary modifications can be planned and executed.
Such a link loop line will help in running trains from YNK side to Hosur side without loco reversal. Will help in speeding up of trains like LTT CBE.
Now that terminal is not yet inaugurated, necessary modifications can be planned and executed.
Such a link loop line will help in running trains from YNK side to Hosur side without loco reversal. Will help in speeding up of trains like LTT CBE.
1 Public Posts - Tue Jan 18, 2022
I am not talking about linking at Lottegollahalli. I am talking about a inverted C or U in SMVB exit point towards Banasawadi side. There are two lines merging there. One from hosur line bypassing SMVB and another from SMVB. If these are linked, one can have trains from YNK side enter from BYPL side and exit via bypas line. Even one can run Whitefield/ KR Puram side trains to Hosur line.
Just imagine Hosur Heelalige SMVB YNK Airport, Hosur SMVB YNK DMM, Chennai KR Puram SMVB Hosur. No loco reversal required
Just imagine Hosur Heelalige SMVB YNK Airport, Hosur SMVB YNK DMM, Chennai KR Puram SMVB Hosur. No loco reversal required
1 Public Posts - Thu Jan 20, 2022
2 Public Posts - Sun Jan 23, 2022
6 Public Posts - Tue Jan 25, 2022
3 Public Posts - Thu Jan 27, 2022