Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

SBC - Kranti Veera Sangolli Rayanna Bengaluru: Station in Garden - Dinesh Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 5993744
Posted: Mar 11 (12:33)

12 Responses
Last Response: Mar 21 (16:03)
General Travel
25266 views
10

Mar 11 (12:33)   SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
irifan2015~
irifan2015~   2355 blog posts
Entry# 5993744            Tags  
1 compliments
Agree
Now that premiun trains are in SBC KLBG sector, why can't we have a SF between Bangalore and Mumbai?
8.5 hours for SBC KLBG, 1.15 for KLBG SUR, 6.5 for SUR CSMT , total 17.5 hours. Say 18 hours.
We can have a tri weekly to start with. SBC DEP 1230 KLBG 2130 SUR 2300 CSMT 0630. CSMT DEP 1100 SUR 1830 KLBG 2000 SBC 0500.
...
more...

If there is a will, there is a way. Hope something good will happen.

Translate to English
Translate to Hindi

7 Posts

10717 views
0

Mar 15 (14:32)
Nagesh123
Nagesh123   14 blog posts
Re# 5993744-8              
Instead, why can't CR plan for Quadrupling Pune Mumbai route??

It has both advantages by introducing new trains as well as running local trains. I believe once Pune Mumbai tracks are quadrupled then itself we can start new trains from Mumbai to Bengaluru, Chennai etc to other places.
Translate to English
Translate to Hindi

8877 views
1

Mar 15 (15:34)
Dgvj01~
Dgvj01~   2614 blog posts
Re# 5993744-9              
its the need of the hour..
they need to reduce the local burden and find a balance between regional and local services..
inner mumbai has land constraints .. have seen many lines running parallel there.. but all of them are occupied by local trains while regional trains only run on the pair of fast tracks .. which leads to many delay ! IR should segregate this traffic .. while GOM should invest more in metro services .. giving people of mumbai alternate options to shift !
Translate to English
Translate to Hindi

7202 views
1

Mar 15 (17:04)
Shankar_Rail
Shankar_Rail   55 blog posts
Re# 5993744-10              
Instead of new trains, they can make two existing trains SF category, Udyan express and LTT - Coimbatore and cut down travel time to 17 hours between LTT and Bangalore. The number of intermediate stops are too many for these two trains and can actually make them to run in 16 to 17 hours without any changes to operating speeds.
Translate to English
Translate to Hindi

6040 views
0

Mar 21 (15:09)
irifan2015~
irifan2015~   2355 blog posts
Re# 5993744-11              
SBC SUR is 11.5 hours. Plus 7 to 7.5 hours for SUR LTT/ CSMT. Total 19 hours max. If a good slot is given, 30 minutes less.
SBC MRJ 13 hours. MRJ LTT/ CSMT 9 hours. Total 22 hours. Good slot can reduce 1 hour.
Translate to English
Translate to Hindi

5215 views
0

Mar 21 (16:03)
irifan2015~
irifan2015~   2355 blog posts
Re# 5993744-12              
If Udyan goes to SWR, can have RSA with UBL DR.
SBC 2200 CSMT 1830; CSMT 2030 UBL 1000.
UBL 1600 CSMT 0700; CSMT 0900 SBC 0530.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy