Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

Who says South India does not have Gatimaan. It is called Vaigai Express. - Thamizh Maran

Search Forum
Filters:
Page#    420726 Blog Entries  next>>
1 Followers
General Travel
4513 views
18

★★★
Today (20:03)   DEC/Delhi Cantt. (5 PFs)
nikhilkhurana~
nikhilkhurana~   1243 blog posts
Entry# 6074793            Tags  
6 compliments
Useful _/\_ Great Great Useful Great
Northern Railway IRTTC Agenda 2024
Translate to English
Translate to Hindi

10 Posts

1367 views
1

Today (21:24)
AdityaUnnao
AdityaUnnao   27 blog posts
Re# 6074793-11              
Stoppage of LKO-MAO Express should be provided at Unnao. Although this train will have very less number of stops yet the stoppage at unnao will mean a lot because there is no direct train from Unnao to Madgaon or Goa region. It may seem that providing stoppage at unnao will not be beneficial for the train but we should look to the case of Bihar Samparkkranti Express. When this train got stoppage at Unnao, there was very negative narrative flowing on the railfan community but the reservation stats of this train in up direction proved that Unnao have potential for stoppage of some premium trains
Translate to English
Translate to Hindi

NR proposed nothing for introducing new trains for South India like Chennai/Bengaluru/Hyderabad to Amritsar. Once I wrote RTI for any proposal for extension of PDY NDLS weekly to Amritsar as it arrives very odd timings about 12 AM at NDLS also it's RSA pair of MLDT NDLS.
. But NR rejected it saying path constraints, freight train raat mein chalana etc etc useless excuses. As no Direct trains from South to Amritsar except (Kochuveli Amritsar and Hirakud), most of the South based passengers going for Amritsar often suffer due to improper/lack of buffer timings.
...
more...

I request you people to tell proper train links with enough buffer timings for passengers coming from Chennai/Bengaluru/Hyderabad to Amritsar. Thank you.

Translate to English
Translate to Hindi

257 views
1

Today (22:20)
Boxerbhai_432~
Boxerbhai_432~   12076 blog posts
Re# 6074793-13              
1 compliments
Agree
Ya seen pdf no interest, but if other zones ask they might say yes as pm they won't do
Translate to English
Translate to Hindi

0 views
0

Today (22:31)
ady_rajat^~
ady_rajat^~   10909 blog posts
Re# 6074793-14              
NR proposing for diversion of 22323/24 Shabd Bhedi Express via - ASN, PNBE, DLN. If accepted, again KOAA/ASN/DHN/GAYA would loose one train towards BSB. Also, they have proposed for it's conversation to Amrit Bharat Express(again without AC or Amrit Bharat with AC coaches as announced by RM recently).

Hope that the proposal is rejected.
Translate to English
Translate to Hindi

0 views
0

Today (22:33)
ady_rajat^~
ady_rajat^~   10909 blog posts
Re# 6074793-15              
The proposal.
Translate to English
Translate to Hindi
General Travel
2347 views
5

Today (20:57)   20897/Howrah - Ranchi Vande Bharat Express | HWH/Howrah Junction (23 PFs)
PiyushSrivastava^~
PiyushSrivastava^~   20445 blog posts
Entry# 6074840            Tags   Past Edits
3 compliments
_/\_ _/\_ Useful
Change in timings
Slow down by 20 minutes
Platform will now be blocked for 1h 25m instead of 2h 35m
Translate to English
Translate to Hindi

1 Posts

1833 views
1

Today (21:01)
Soumyadeep~
Soumyadeep~   2349 blog posts
Re# 6074840-2              
Slight speed up in between HWH-TATA. Followed by slowdown in:
TATA-CNI.
MURI-RNC.
Translate to English
Translate to Hindi

1603 views
0

Today (21:22)
PiyushSrivastava^~
PiyushSrivastava^~   20445 blog posts
Re# 6074840-3              
Ek din agar 12828 late ho gayi to 22891 to gayi
Waise bhi subah ke bracket mein bhi 22892 ke passengers thode kam kar chuki hai ye VB
Translate to English
Translate to Hindi

1482 views
2

Today (21:25)
Arnab_K~
Arnab_K~   9114 blog posts
Re# 6074840-4              
Slow claps !!!
Translate to English
Translate to Hindi

749 views
0

Today (21:53)
Soumyadeep~
Soumyadeep~   2349 blog posts
Re# 6074840-5               Past Edits
Hmm. With these timings HWH-TATA segment will get more intense. They tried to lure in more patronage out of RNC by changing timetable of 20898. However, the result turned to be favouring TATA more. Boardings in RNC-TATA(excl) sector have dropped due to consistent punctuality issues and arrival time at Howrah.
Translate to English
Translate to Hindi

502 views
0

Today (22:02)
deepak.yerr~
deepak.yerr~   6191 blog posts
Re# 6074840-6              
It's no more Vande Bharat to attart business travellers its premium intercity express. Instead of speedup they changed timings and made arrival and dep at HWH in afternoon.
Translate to English
Translate to Hindi
General Travel
639 views
1

Today (22:00)  
adilnomani~
adilnomani~   347 blog posts
Entry# 6074943              
Sub:EQ/HO Quota
Stn:CSMT-DRM Office, Groundfloor
Class:SL only, for AC Rly office next to PF 1 (North End)
Translate to English
Translate to Hindi
General Travel
27513 views
21

★★★
May 16 (00:41)   DD-ELS/Daund Electric Loco Shed
Yusuf_Azhar^   52013 blog posts
Entry# 6065286            Tags  
13 compliments
Great::-D Great Useful Great Useful Useful Great Great Great Great Great Great:Funtastic..!! 😍 Great
1st Electric locomotive allocation.!
38626 WAG9 allotted to Daund ELS..
Congratulations.!
Translate to English
Translate to Hindi

17138 views
0

May 16 (08:23)
dnyaneshwar   163 blog posts
Re# 6065286-1              
VERY NICE
Translate to English
Translate to Hindi

16015 views
0

May 16 (11:10)
RajMhamane^~
RajMhamane^~   6886 blog posts
Re# 6065286-2              
congratulations 🀩
Translate to English
Translate to Hindi

13405 views
0

May 16 (15:48)
BangaloreMail^~
BangaloreMail^~   26775 blog posts
Re# 6065286-3              
Thats a great news. Finally, its happening.
Translate to English
Translate to Hindi

1 Posts

8290 views
1

May 17 (17:01)
Rishi_Shukla^~
Rishi_Shukla^~   1099 blog posts
Re# 6065286-5              
Great πŸ‘
Finally we can see Daund Locos.
Translate to English
Translate to Hindi

2 Posts

702 views
0

Today (21:47)
KhagariaJn^~
KhagariaJn^~   63460 blog posts
Re# 6065286-8              
Congrats
Translate to English
Translate to Hindi
General Travel
708 views
0

Today (21:43)   COA/Kakinada Port (3 PFs)
PowerStar~
PowerStar~   2704 blog posts
Entry# 6074915            Tags   Past Edits
Kudos to #SCR & #BZA team Major up gradation works going brisk peace at #COA Depot

1. Two stabling lines with electrification works are final stage.

2.
...
more...
Electrification works going for all pitlines Future VB Sets

3. Yard remodelling with Electronic interlocking for Electronic interlocking seperate building aslo construction completed.

4. Pit 1 Increase up to 26/ 24 Coacher length So all pitlines At COA depot handled 26/ 24 Coacher length

5. Automatic Coach Washing unit installation works going on at Pitline No 3

Translate to English
Translate to Hindi
Page#    420726 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy