Search Forum
Filters:
Page# 63029 Blog Entries next>>
Today (09:21) 19565/Uttaranchal Express (PT) | OKHA/Okha (3 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~ 684 blog postsRailways should change the terminal point of 19565/66 Okha Dehradun weekly express instead of Dehradun this train should run upto Haridwar only and should be named as 19565/66 Okha Haridwar express and should also change coach composition of this train like this -
1 slr or sitting cum luggage rake , 3 general class , 8 sleeper class , 8 third ac economy , 1 second ac , 1 eog or generator car total 22 coaches.
1 slr or sitting cum luggage rake , 3 general class , 8 sleeper class , 8 third ac economy , 1 second ac , 1 eog or generator car total 22 coaches.
Yesterday (21:20) 12019/Howrah - Ranchi Shatabdi Express | HWH/Howrah Junction (23 PFs)
Soumyadeep~
Soumyadeep~ 2324 blog postsDashboards of Shatabdis serving in Eastern India.
12019 12020 RNC HWH and HWH RNC
12042 12041 NJP HWH and HWH NJP
12278 12277 PURI HWH and HWH PURI
Date Range : 23/24-01-2024 to 27-04-2024. ...
more...
12019 12020 RNC HWH and HWH RNC
12042 12041 NJP HWH and HWH NJP
12278 12277 PURI HWH and HWH PURI
Date Range : 23/24-01-2024 to 27-04-2024. ...
more...
7 Posts
Of Dashboards I can only share that of VB and Shatabdi trains operated in Eastern Region. PRIMES doesn't hold any long term data of other train types for reasons known only to CRIS. Max. occupancy of other trains record in archive is of 3-4 days which I guess is also available in IRCTC Charts.
Hmm, with around 60/63% APJL means diversity of intermediate travellers were more. Can also be understood while observing the segmentation.
I am most impressed by how well ASN-DGR have managed to hold up inspite of having so many dedicated Volvo services to KOAA.
Volvos serve a particular niche segment of travellers. In terms of comfort and travel time, trains always have edge over buses in similar classes in this belt.
12 Posts
Savordem to Kalem is fully double electric line.
From Kalem no works but from Kulem doubling works have started. Yeah the route passes through forests but still I would say it's much easier compared to Majorda Vasco coz no houses nearby so people protesting issue will not be there. If necessary forest clearances are obtained the work can be completed in 6 to 9 months. It's hardly 7 to 8 kms.
From Kalem no works but from Kulem doubling works have started. Yeah the route passes through forests but still I would say it's much easier compared to Majorda Vasco coz no houses nearby so people protesting issue will not be there. If necessary forest clearances are obtained the work can be completed in 6 to 9 months. It's hardly 7 to 8 kms.
Mostly they will merge the double line from Cansaulim side to Majorda on the same single exisiting line coming from VSG and same line will be used as it is used right now. Moreover Madgaon to Majorda section uses automatic signalling to ease up congestion coming from KR and SWR. I don't think just because VSG is doubling they will lay another line because there won't be speed up there as a major halt is given to every train at Madgaon so every train slows down from Majorda Jn.
Yep all sections are electrified now just the commissioning but still no use if small sections are electrified because Vasco to Kulem can be given electric run but they won't waste resources until whole stretch from VSG to Tinai Ghat electrified. From Kulem to Kalem it is doable not much interference but Railways should check with Forest Dept. for the clearance asap and if double line creates hurdle for wild animals speed restrictions can be imposed to balance things out.
Atleast now SWR should stop crying and start running some more trains to VSG. This will create some confidence among Goans about SWR.
They should start by pre covid era passenger trains like VSG BGM, VSG Karwar and restore MAS express back to VSG.
They should start by pre covid era passenger trains like VSG BGM, VSG Karwar and restore MAS express back to VSG.
Yes π all trains can be resumed and to begin with VSG Karwar can be resumed within 1 week if they want because 16595 Panchaganga Express from Bengaluru to Karwar comes as Kawar (8:30) to Madgaon (9:45) special train in morning and returns back from Madgaon (16:30) to Karwar (17:45) . So this can be extended easily removing slack of 15 mins from Madgaon and adding 40-50 mins to reach Vasco from Madgaon and vice-versa.
Yesterday (17:58) 07440/Tirupati - Srikakulam Road Special Fare AC Summer Special
SaiCharan^~
SaiCharan^~ 3356 blog postsTpty che tpty humsafar special , cancellation of following trains till may 26
1) 07977/8 bza bttr bza memu
2) 17237/8 bttr mas bttr memu
3) 17219/17220 mtm vskp mtm exp
4)...
more...
1) 07977/8 bza bttr bza memu
2) 17237/8 bttr mas bttr memu
3) 17219/17220 mtm vskp mtm exp
4)...
more...
existing rake link 07481/82 shows cancelled on May 5, 19.. but runs on May 12.. How can they run this CHE spl on May 12th
Planning failed somewhere. As cancellation of trains is a daily affair in this zone they will cancel one train. But it should de done at the earliest.
Yesterday (17:02) 12403/Prayagraj - Bikaner SF Express (Via Fatehpur Shekhawati) (PT) | PRYJ/Prayagraj Junction (Allahabad) (10 PFs)
WAP7NFRMLDT~
WAP7NFRMLDT~ 521 blog postsThe name of this train should be changed to "Experiment Express"π€£π€£
Railways started experimenting with this train in this way
2007: It was introduced as Prayagraj mathura Express. Later it got extended...
more...
Railways started experimenting with this train in this way
2007: It was introduced as Prayagraj mathura Express. Later it got extended...
more...
what is there to feel bad about?
BTW, lalgarh and Bikaner are stations in same city of Bkaner with Lalgarh being 5 kms from Bikaner RS.
As such, this train must be sent for overnight parking to Lalgarh stabling lines / Yard
BTW, lalgarh and Bikaner are stations in same city of Bkaner with Lalgarh being 5 kms from Bikaner RS.
As such, this train must be sent for overnight parking to Lalgarh stabling lines / Yard
Page# 63029 Blog Entries next>>