Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

शिव की जटाओं से बहती है शिव गंगा - Divyanshu

Search Forum
Filters:
Page#    63177 Blog Entries  next>>
Info Update
33080 views
2

Apr 05 (22:57)   14117/Kalindi Express (PT) | BKO/Bindki Road (3 PFs)
bsbssf01^
bsbssf01^   962 blog posts
Entry# 6020564            Tags   Past Edits
1 compliments
Useful
14117/18 Kalindi Express Stoppage at Bindki Road Approved by Railway Board.
(CC-243)
Translate to English
Translate to Hindi

2 Posts

4656 views
2

Yesterday (10:59)
Mridul^~
Mridul^~   46694 blog posts
Re# 6020564-3              
Only Kalka, Unchahar, Kalindi are remaining for being LHB.

Unchahar and Kalindi should be LHBfied in next 1 year.
Translate to English
Translate to Hindi

3491 views
0

Yesterday (20:55)
Brandon12663^~
FM Term Over   35652 blog posts
Re# 6020564-4              
It should be LHBfied ASAP but a big NO to rake standardization
Translate to English
Translate to Hindi

2976 views
1

Yesterday (21:11)
Mridul^~
Mridul^~   46694 blog posts
Re# 6020564-5              
1 compliments
Agree
Rack standardization policy has been withdrawn. Most of the trains have been reverted back to old CC.

Instead of trying to earn money by increasing AC coaches, they should focus on other methods which can help to reduce the gap between Sleeper and AC fare.

Subsidized
...
more...
travel to economy weaker section can be best idea.

Translate to English
Translate to Hindi

2598 views
2

Yesterday (21:22)
LHB_for_18047~
LHB_for_18047~   10695 blog posts
Re# 6020564-6              
1 compliments
Agree
I think the extreme rake standardization of each and every train was a bad idea as of now. Instead they should have gone for keeping 5 to 7 SL coaches with 3 GS and 9 to 11 AC coaches type rake standardization in long distance trains initially.
Also now in some trains where AC travel demand exists they have reduced AC coaches which is also a bad idea eg. Goa express it will have only one 3AC and two 3E from June it's a terrible coach composition in my opinion.
Translate to English
Translate to Hindi

2355 views
0

Yesterday (21:28)
LHB_for_18047~
LHB_for_18047~   10695 blog posts
Re# 6020564-7              
3E prices if priced lower would have been a superb middle ground between SL and 3AC.
In a country like India Air Conditioners should be a necessary commodity not a luxury because of the hot weather. I travelled in SL class in the hot month of May in 2014 it was a horrible journey coz of the heat and today combined with the overcrowding in SL it's a nightmarish experience.
Translate to English
Translate to Hindi
Info Update
50071 views
7

Apr 26 (15:05)   MJO/Majorda Junction (2 PFs)
Exynos9611~   13440 blog posts
Entry# 6044642            Tags   Past Edits
1 compliments
Useful
Vasco Majorda Doubling Work Shown By KD Travel Studio Yt
Translate to English
Translate to Hindi

31 Posts

4300 views
0

Yesterday (18:12)
Exynos9611~   13440 blog posts
Re# 6044642-32              
then they have to slew that line from right to left cuz pf no1 line goes directly in madgaon coaching depot
Translate to English
Translate to Hindi

4161 views
0

Yesterday (18:13)
Exynos9611~   13440 blog posts
Re# 6044642-33              
already goans are opposing for 2nd line from majorda to vasco somehow swr has laid 2nd line from vasco now hard part is to lay 2nd line from dabolim to majorda
Translate to English
Translate to Hindi

3555 views
0

Yesterday (19:12)
LHB_for_18047~
LHB_for_18047~   10695 blog posts
Re# 6044642-34              
Dabolim to Sankval it's difficult coz of terrain. Sankval to Cansaulim ground levelling going on as per the video almost all required land is acquired. Cansaulim to Majorda second line is already laid only track linking works left at Cansaulim.
Translate to English
Translate to Hindi

2939 views
1

Yesterday (19:33)
Exynos9611~   13440 blog posts
Re# 6044642-35              
ya some part of flyover touches railway track too close at dabolim
Translate to English
Translate to Hindi

2294 views
0

Yesterday (20:18)
LHB_for_18047~
LHB_for_18047~   10695 blog posts
Re# 6044642-36               Past Edits
More than this doubling what I'm more eager about are two things
1. Second pitline commissioning at Vasco
2. LHB conversion of SHM VSG exp.
Translate to English
Translate to Hindi
Info Update
5035 views
6

Yesterday (17:48)   SMU/Shambhu (2 PFs)
bsbssf01^
bsbssf01^   962 blog posts
Entry# 6070824            Tags  
2 compliments
Useful Useful
Kisan Agitation withdrawn at 16:30hrs today (20/05/2024)
Translate to English
Translate to Hindi
Info Update
40304 views
4

Apr 02 (17:47)   12140/Sewagram SF Express (PT) | CSMT/Mumbai CSM Terminus (18 PFs)
Manish23
Manish23   214 blog posts
Entry# 6017027            Tags  
1 compliments
Useful
Central Railway has decided to convert the conventional ICF rakes of Chhatrapati Shivaji Maharaj Terminus – Nagpur Sevagram Express (UP and Down direction) into LHB rakes. The details are as under:

The first rake of 12140 Nagpur-CSMT Sevagram Express will run with LHB coaches Ex Nagpur w.e.f. 25.5.2024 while 12139 CSMT– Nagpur Sevagram Express will run w.e.f. 26.5.2024.
The second rake of 12140
...
more...
Nagpur-CSMT Sevagram Express will run with LHB coaches Ex Nagpur w.e.f. 26.5.2024 while 12139 CSMT– Nagpur Sevagram Express will run w.e.f. 27.5.2024.

Revised Composition: Total 22 Coaches-Two AC-2 Tier, 12 AC-3 Tier Economy, 4 Sleeper Class, Three General Second Class including Guard’s brake van and o­ne Generator Van.
*LHB Rakes*-
Linke Hofmann Busch (LHB) coach is a passenger coach developed by Linke-Hofmann-Busch of Germany. It has been adopted by Indian Railways and produced by rail coach manufacturing units at Kapurthala, Chennai and Raebareli.
It has multiple advantages over the conventional ICF rakes such as :
•Lighter and Longer than ICF coaches
•Better Speed
•Safer ( They do not climb o­n the adjacent coach in case of derailment)
•Enhanced seating capacity
•Fitted with Bio Toilets
•Efficient braking at higher speeds
•Better air conditioning
•Economical and low maintenance cost
Replacement of ICF coaches with LHB coaches is another step by Railways towards providing better travelling experience to its passengers.
For detailed timings and halts please visit www.enquiry.indianrail.gov.in or download NTES App.
--- ---
Date: January 27, 2024
PR No.2024/01/37
This press release is issued by the Public Relations Department, Central Railway, Chhatrapati Shivaji Maharaj Terminus Mumbai.

Translate to English
Translate to Hindi

33069 views
1

Apr 02 (17:49)
Mridul^~
Mridul^~   46694 blog posts
Re# 6017027-1              
Atleast 1 First AC coach should be there.
Translate to English
Translate to Hindi

31054 views
0

Apr 02 (18:16)
invisible_me^~   606 blog posts
Re# 6017027-2              
Upcoming garib rath lite.
Translate to English
Translate to Hindi

30709 views
0

Apr 02 (18:30)
Manish23
Manish23   214 blog posts
Re# 6017027-3              
also minimum 6 sleepers should given instead of 12 economy 3rd class
Translate to English
Translate to Hindi

2075 views
0

Yesterday (15:34)
vivek2955
vivek2955   4 blog posts
Re# 6017027-4               Past Edits
Yes , 6 or 7 SL coaches minimum should have been there , Even then there was still space for 9 or 10 3E coachesto be there in the formation, but they have given 12 3E coaches. Sewagram has many stops too. Also 12289/90 Duronto daily train is already running with 12 3A coaches .
Translate to English
Translate to Hindi
Info Update
67222 views
3

May 15 (17:27)   12455/Delhi Sarai Rohilla - Bikaner SF Express (via Shri Ganganagar) | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   735 blog posts
Entry# 6064837            Tags   Past Edits
Railways should extend 12455/56 Bikaner Delhi Sarai Rohilla via Shri Ganganagar express upto Agra Cantt so that people of Shri Ganganagar, Bhatinda and people of different places staying in the route of this train will get a daily train towards Mathura and Agra and should also shift primary maintenance of this train instead of Delhi Sarai Rohilla primary maintenance of this train should be done at Agra Cantt and for further information refer to these blogs - 6024944 , 6024929 .
Translate to English
Translate to Hindi

2 Posts

10486 views
0

Yesterday (01:35)
Nothingispermanentvalid~
Nothingispermanentvalid~   735 blog posts
Re# 6064837-3               Past Edits
Dholpur mai pitlines nahi hai iss kaaran sirf agra cantt tak hi ja sakti hai.
Translate to English
Translate to Hindi

5381 views
0

Yesterday (10:02)
ManishSharma~
ManishSharma~   281 blog posts
Re# 6064837-4              
TO Gwalior Tak ho jaye atleast dholpur to cover kar legi, GWL me to Pitline hai, and should be stopped at Dholpur atleast 5 mins.
Translate to English
Translate to Hindi

4529 views
1

Yesterday (11:38)
Nothingispermanentvalid~
Nothingispermanentvalid~   735 blog posts
Re# 6064837-5              
Sirf 8 ghante 20 minute ka layover hai agra cantt mai (according to imaginary train time table) aur 6 ghante primary maintenance ke liye chahiye toh Gwalior tak extend nahi karsakte.
Translate to English
Translate to Hindi

3935 views
0

Yesterday (12:12)
ManishSharma~
ManishSharma~   281 blog posts
Re# 6064837-6              
Since this is superfast train and superfast takes 3.25 hour to reach Gwalior, we can take 4 hours approximate for calculation so it will reach 11.30 to GWL then 6.30 hours for PM at GWL, can depart from GWL at 6.30 PM, and will take 4 hours to reach New Delhi.
Translate to English
Translate to Hindi

2978 views
1

Yesterday (14:39)
deepak.yerr~
deepak.yerr~   6175 blog posts
Re# 6064837-7              
Any delay enroute even an hour will require to reschedule the train from GWL Though PM takes 6hrs min 8-9hrs turnaround should be there at PM end.
Translate to English
Translate to Hindi
Page#    63177 Blog Entries  next>>

Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy