Full Site Search  
Mon Nov 20, 2017 00:53:50 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Large Station Board;


UHP/Udhampur (3 PFs)
اودھمپر     उधमपुर

Track: Single Electric-Line

Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 41
Number of Originating Trains: 7
Number of Terminating Trains: 7
Railway Rd, Bharat Nagar, Udhampur 182101
State: Jammu and Kashmir
Elevation: 660 m above sea level
Zone: NR/Northern
Division: Firozpur
 
 
3 Travel Tips
No Recent News for UHP/Udhampur
Nearby Stations in the News

Rating: 4.2/5 (60 votes)
cleanliness - excellent (8)
porters/escalators - good (7)
food - good (8)
transportation - good (8)
lodging - good (7)
railfanning - good (8)
sightseeing - excellent (7)
safety - excellent (7)

Nearby Stations

CRWL/Chak Rakhwal 9 km     RMJK/Ram Nagar JK 10 km     MNVL/Manwal 22 km     SVDK/Shri Mata Vaishno Devi Katra 24 km     SGRR/Sangar 32 km    

Station News

Page#    Showing 1 to 20 of 97 News Items  next>>
Sep 16 2017 (15:22)  India's rail counter to China's border game is likely to be ready in a few years' time (economictimes.indiatimes.com)
back to top
New Facilities/TechnologyNFR/Northeast Frontier  -  

News Entry# 316850   Blog Entry# 2410191     
   Past Edits
Sep 16 2017 (15:22)
Station Tag: Udagamandalam/UAM added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: Shimla/SML added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: Darjeeling/DJ added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: New Delhi/NDLS added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: Baramula/BRML added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: Srinagar Kashmir/SINA added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: Udhampur/UHP added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: New Missamari/NMM added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: Pasighat/PSGHT added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: Silapathar/SPTR added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:22)
Station Tag: North Lakhimpur/NLP added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
 
 
LEH: At Upshi, 50 km south of Leh, a tiny hillock poses a big challenge to a team of railway survey men. A 16-member squad, comprising experienced railway engineers, geologists, bridge specialists and avalanche experts, tosses various options to negotiate the roadblock —from engineering a deep vertical cut to pushing the track towards the existing motor road. A senior geologist in the team is blunt: there’s no way we can have a tunnel below this heap of withered granite. There’s one more problem, points out another expert. The hillock is too short for a tunnel. So, what’s the way out? After some discord, a consensus is arrived at: let the project consultant RITES, whose survey experts did six recces of the terrain in the past, come up with two alternative solutions and freeze the matter, for good.
If
...
more...
the Government of India has its way, a railway line up to Leh — a district in Ladakh sandwiched between Pakistan occupied Kashmir in the west and China in the north and east — will be a reality in the next few years. The survey for a 498-km-long strategic railway line from Bilaspur (Himachal Pradesh) to Manali (HP) to Leh ( J&K) began in September last year. The Ministry of Defence has earmarked Rs 158 crore to the Indian Railways for the survey, with Rs 40 crore released in 2016-17.
Depending on the gradients and the alignment, the route length could go up to 650 km, almost the same as the distance by road. But the big picture is this: strategically important Leh — just 250 km from the China border — will finally be connected to Delhi by an all-weather, 1,100-km-long rail route. Though defence requirements are the basic rationale for conceiving a railway line passing through a difficult terrain and high passes — 17,480-ft-high Taglang La is one of the four passes on the way ..
The cost? The survey men are tight-lipped; a tentative cost will be known by the end of next year when the second phase of the three-phase survey is completed. “Don’t be surprised if the project cost is Rs 1 lakh crore,” exclaims one of the survey men, with a disclaimer that he does not have all the requisite statistics — route length, total size of the tunnels and bridges and the like to do a back-of-the-envelope calculation.
Last week ET Magazine joined this team of survey men for a stretch of 70 km from Leh to Lato, both in the Ladakh region of Jammu and Kashmir.
Strategic Line
The entire survey is expected to take at least two more years. When it’s time for the government to take a call on its implementation, the recent tensions with China and the eventuality of future skirmishes may well determine whether it’s executed or not.
After all, the Bilaspur-Manali-Leh line will go Last week ET Magazine joined this team of up to 250 km from the India-China border. It will also be the most challenging project the Railways has ever embarked upon since it involves constructions in huge mountains and avalanche-prone sections.
And it’s not the only line that’s planned near this critical India-China boundary. Final location surveys are also being conducted on the eastern front for three other stretches — a 378-km Missamari (Assam)-Tenga (Arunachal Pradesh)-Tawang (Arunachal) track, a 227-km-long track from Pasighat (Arunachal) to Tezu (Arunachal) to Rupai (Assam) and a 249-km route from North Lakhimpur (Assam) to Bame (in Along, Arunachal) to Silapathar (Assam).
This information was in a written reply by MoS for Railways Rajen Gohain to Parliament in November last year. He added that Rs 345 crore was earmarked for surveys for the four lines, with the ministry of defence releasing Rs 87.18 crore for 2016-17.
These blueprints are on the drawing board at a time when China is aggressively pushing its railway network deep into Tibet; the Indian government was jolted in 2006 when the 1,142-km-long Qinghai-Tibet Railway (QTR) became operational, bringing the railway track up to Lhasa, some 1,500 km from India.
The Lhasa-Shigatse railway line was subsequently constructed, and will soon be extended to Dromo near Sikkim and Nyingtri (Nyingchi in Chinese) in north Arunachal Pradesh, the Indian state often claimed by China as its own.
In fact, Dromo is close to Doklam, where India and China have just managed to end a 73-day-long standoff triggered by the intrusion of Chinese soldiers into Bhutanese territory for constructing a road project (Bhutan is a protected state of India).
Despite mounting pressure from China, India did manage to hold its ground till both the countries agreed that its troops would step back by 150 m on each side.
On Thursday, China’s Foreign Minister Wang Yi at a press conference in Beijing said that while the Doklam standoff with India had “not derailed” ties, they were “damaged and affected” during those 73 days.
While addressing a gathering at a seminar organised by Centre for Land Warfare Studies in New Delhi on Wednesday, the general cited how China “flexes its muscles” to take over “territory in a very gradual manner”.
On the same day, two of India’s former foreign secretaries — Shivshankar Menon and Shyam Saran — had an hour-long conversation at a book launch. Both diplomats spent some quality time to address one question:
Why is China in a tearing hurry to exert its military influence in the region? They suspect it to be the fallout of China’s perception that the US under Donald Trump is on the decline, thereby giving a window of opportunity for China to gain more power.
Clearly, there’s little room for India to slack off and if China is making tracks into Tibet, and towards the border, India too should be getting its act together to create similar infrastructure in the region. It won’t be easy, though.
Toughest Track
Railway officers point out that if the track to Leh gets the green signal, it will be more ambitious and grandiose than the engineering marvel that is the Udhampur-Srinagar-Baramulla rail link, with 11.2-km-long Pir Panjal railway tunnel.
Only a part of that project is operational now. “The Bilaspur-Leh line will pass through four high passes, the most challenging being Taglang La (17,480 ft). The temperature variation from minus 30 degree Celsius to plus 30 degree Celsius is a big challenge. Then, there are avalanche-prone areas on the way. The proposed line falls in Seismic Zones 4 and 5.
In fact, 11% of our proposed track falls in Zone 5 (the most vulnerable to earthquakes)” says Desh Ratan Gupta, the chief engineer in-charge of construction and survey for Northern Railways. “Also, the sub-zero conditions of this magnitude do not exist in the Udhampur-Baramulla project.”
Sunil Bharadwaj from the Snow and Avalanche Study Establishment (SASE) pinpoints the challenges. “Between Kothi and Sissu (both in Himachal Pradesh), the line will pass through some of the most avalanche-prone pockets.
That 70-km stretch will be a big challenge,” he says. SASE is a laboratory under the Defence Research and Development Organisation (DRDO) that forecasts avalanches, apart from undertaking their mitigation measures —both temporary (like artificial triggering) and permanent (like constructing snow galleries).
For New Delhi, junking the Bilaspur-Manali-Leh project because of the rough terrain may not be an option. From 1947, the Railways has been shying away from constructing new hill rail tracks — the toy trains of Darjeeling, Shimla and Ooty were built in the British era.
The only headway made in the recent past has been the construction of rail tracks to connect seven capital cities of the northeastern states (barring Sikkim) and then the Udhampur-Baramulla rail line in Kashmir; both are incomplete.
In Leh, people are not perturbed by the recent military standoff between India and China in Doklam near Sikkim and in Pangong in Ladakh.
Sonam Angchuk, 61, a personal assistant to Shey monastery’s chief monk, is hopeful that the rail line to Ladakh will become a reality. “Can you imagine that a dozen bananas cost Rs 100 in Leh? It’s all because of transportation costs.
Many commodities are bought either from Srinagar or Himachal Pradesh. The rail line will be a game-changer,” he says. Skal Zang Dolma, a former school teacher, spells out the downside.
If the railways come here, prices of goods will come down, but we don’t want Leh to turn into a dirty, low-budget tourist spot,” says Dolma, a resident of Stok, a village where Leh’s royal family resides.

1 posts - Sat Sep 16, 2017 - are hidden. Click to open.

1433 views
Sep 17 2017 (15:14)
a2z~   2182 blog posts
Re# 2410191-2            Tags   Past Edits
Only Survey may be completed-In few years time-
In few decades time the construction may be completed if construction is actually taken up and sufficient funds are allotted!
Sep 16 2017 (15:02)  Bilaspur-Leh will be the most challenging rail project in India ever: Desh Ratan Gupta, chief engineer (economictimes.indiatimes.com)
back to top
New Facilities/TechnologyNR/Northern  -  

News Entry# 316849   Blog Entry# 2410175     
   Past Edits
Sep 16 2017 (15:02)
Station Tag: Baramula/BRML added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461

Sep 16 2017 (15:02)
Station Tag: Udhampur/UHP added by I WANT UJJAIN TO BE MADE AS TERMINAL/1458461
Stations:  Udhampur/UHP   Baramula/BRML  
 
 
Desh Ratan Gupta, the chief engineer in-charge of construction and survey for Northern Railways, explains why the Bilaspur-Manali-Leh route will by far be more challenging than the Udhampur-Baramulla project in Kashmir, a part of which is operational now. In a chat with ET, Gupta says the project will serve two purposes: one for the defence sector and the other to meet the needs of ordinary citizens. Excerpts:
How challenging is the Bilaspur-Manali-Leh survey that the Indian Railways is undertaking?
The Bilaspur-Manali- Leh route is about 650 km by road. The Manali-Leh
...
more...
route is closed for almost five months a year, making it difficult for people as well as defence personnel. That’s why the Government of India decided to have rail connectivity up to Leh. For this, the Northern Railways is undertaking the final location survey. It’s a detailed ..
When will you complete the survey? And when will the construction begin?
The survey (which began in September 2016) will take about three years. There will be three phases. We will soon complete Phase I in which we will have a few alternative corridors in various gradients — 1:40, 1:60 and 1:80 (a gradient of 1:40 means that every 40 m, the track will be elevated by 1 m, i.e. for every 1 km, track will be risen by 25 m). The ideal situation is to have sharper gradients, w ..
How challenging is the Bilaspur-Manali-Leh project compared with the Udhampur-Baramulla line?
The Bilaspur-Leh project is the most challenging for the Indian Railways. Between Bilaspur and Leh, there are four Himalayan ranges unlike just one (Pir Panjal) in Udhampur project. The highest point the Udhampur-Baramulla line passes through is only 1,750 m. Here, the line has to pass areas at over 5,300 m. Sub-zero conditions of this magnitude (minus 30 degree Celsius in some a ..
Will this line meet only the requirements of the Ministry of Defence, which is funding the survey cost, and possibly the entire project, too?
Along the route, the defence has many establishments. They will have specific requirements. But it will also serve the people who will get all-weather connectivity. Now, essential commodities are brought by air during winter. With the line in place, prices will come down. It will serve two purposes: strategic as well as the welfare ..
How much will the project cost?
It’s too early to talk about cost. By the end of next year, we will have a tentative idea. The actual cost will be known only after the DPR is ready (by 2019).

9 posts - Sat Sep 16, 2017 - are hidden. Click to open.

810 views
Sep 17 2017 (15:26)
a2z~   2182 blog posts
Re# 2410175-11            Tags   Past Edits
* IR is very badly infected with viruses of political & bureaucratic infection, bad management & inefficiency, so a growth is very difficult. The only RM who tried to match the growth of IR with china is already fired rfom Rly ministry. There are little hope that railway in India could grow like china. Most of the tax collection in India is used to by vote for the ruling parties/ politicians by way myraid of subsidies targetted towards poor, particular caste, particular religion, etc.
* China could construct over 60000 RKMs of new railway track including about (including 20000 RKMs of HST and substantial route KMs of semi high speed train) in last 2 decades. Where as in last 2 decades and
...
more...
India could construct only 5000 RKMs of new track in last 2 decades (with 0km of HST and could upgrade only 150km to semi high speed 160kmph level)
Jul 25 2017 (16:34)  Metro Man E Sreedharan Seeks Konkan Railway Formula To Connect To Kashmir Valley (energyinfrapost.com)
back to top
New Facilities/TechnologyNR/Northern  -  

News Entry# 309435     
   Past Edits
Jul 25 2017 (16:34)
Station Tag: Banihal/BAHL added by a2z~/1674352

Jul 25 2017 (16:34)
Station Tag: Shri Mata Vaishno Devi Katra/SVDK added by a2z~/1674352

Jul 25 2017 (16:34)
Station Tag: Baramula/BRML added by a2z~/1674352

Jul 25 2017 (16:34)
Station Tag: Srinagar Kashmir/SINA added by a2z~/1674352

Jul 25 2017 (16:34)
Station Tag: Udhampur/UHP added by a2z~/1674352

Jul 25 2017 (16:34)
Station Tag: Jammu Tawi/JAT added by a2z~/1674352
Posted by: a2z~  92 news posts
 
 
Drawing a page from his experience in the Konkan Railways, Metro Man E Sreedharan said he had recommended the formation of a special purpose vehicle to expedite the Katra-Banihal rail corridor, a crucial link to the Kashmir Valley.
However, with the Railway Board summarily dismissing the suggestions, Sreedharan warns yet again that if work goes on at the same pace “it will take another 20 years to complete the project”.
In response to a public interest litigation filed by advocate and politician Prashant Bhushan’s Centre for Public Interest Litigation, the Delhi High Court
...
more...
had constituted a committee in 2015 with Sreedharan as its head to look into the 111-km rail corridor from Katra to Banihal. The line connecting Katra, a Hindu pilgrimage town near Jammu, with Banihal in the Kashmir Valley, is plagued by inordinate delays and cost overruns since work commenced in 2002 with the Railways having spent Rs 10,000 crore already.
“Work has been going on for 15 years and one difficult stretch on the corridor is yet to be completed. As the head of the High Court ordered committee, “I have suggested that the project be taken away from the Railways and given to a Special Purpose Vehicle (SPV), which should be formed if the Railways wants the project to be expedited on priority,” Sreedharan said. “A similar arrangement was done for the Konkan Railways. Only if the SPV is formed will the project be completed in the next 8 to 10 years. Otherwise with the present style of working, it will take another 20 years”
Sreedharan, 85, who had spearheaded the challenging Konkan Railways project, delivering 760 km of rail corridors with 59 stations, 92 tunnels and 2328 bridges, added, “We had finished the project in seven years. The Katra section is extremely important and will facilitate transportation of troops and bring down prices of essential commodities. However, Railway Board has turned down my suggestion.”
The Katra-Banihal stretch is considered to be the most difficult engineering challenge in the country. With 27 bridges including the tallest railway bridge in the world and 37 tunnels, one of the longest in Asia, it throws up challenges coupled with a hostile terrain.
While two-thirds of the larger 326-km corridor ranging from Jammu-Udhampur-Srinagar-Baramulla is ready, only the Katra-Banihal calls for attention. Railway Ministry has formed a special monitoring team to oversee its execution and is targeting for an opening by 2021.
Jul 14 2017 (08:50)  उधमपुर-इलाहाबाद एक्सप्रेस में डकैतों का दो घंटे उत्पात (www.jagran.com)
back to top
Crime/Accidents

News Entry# 308359     
   Past Edits
Jul 14 2017 (08:50)
Station Tag: Udhampur/UHP added by The Phenomenal One~/1469143

Jul 14 2017 (08:50)
Station Tag: Kanpur Central/CNB added by The Phenomenal One~/1469143

Jul 14 2017 (08:50)
Station Tag: Ludhiana Junction/LDH added by The Phenomenal One~/1469143

Jul 14 2017 (08:50)
Station Tag: Allahabad Junction/ALD added by The Phenomenal One~/1469143

Jul 14 2017 (08:50)
Train Tag: Udhampur - Allahabad SF Express/24156 added by The Phenomenal One~/1469143
 
 
उधमपुर-इलाहाबाद एक्सप्रेस में दो घंटे से ज्यादा समय तक डकैतों ने उत्पात मचाया। लुधियाना में चढ़े छह से ज्यादा बदमाश चाकू और ब्लेड से लैस थे।
कानपुर (जेएनएन)। उधमपुर-इलाहाबाद एक्सप्रेस में दो घंटे से ज्यादा समय तक डकैतों ने उत्पात मचाया। लुधियाना में चढ़े छह से ज्यादा बदमाश चाकू और ब्लेड से लैस थे। तीन स्लीपर बोगियों में दो दर्जन से ज्यादा यात्रियों का सामान लूट ले गए। ये यात्री वैष्णो देवी और अमरनाथ यात्रा से लौट रहे थे। ट्रेन में गश्ती दल और टीटी नहीं होने से यात्रियों ने पूरी रात दहशत में काटी। दिल्ली स्टेशन पर यात्रियों ने हंगामा किया, जिसके बाद प्राथमिकी दर्ज हुई।
यात्रियों
...
more...
के चेहरे पर दहशत
गुरुवार शाम सेंट्रल स्टेशन के प्लेटफार्म पांच पर पहुंची ट्रेन के यात्रियों के चेहरे पर दहशत साफ नजर आ रही थी। डकैतों ने स्लीपर बोगी एस-2, एस-3 और एस-4 के यात्रियों को अपना निशाना बनाया। एस-3 बोगी में सफर करने वाले बर्रा-2 निवासी आशीष आहूजा पत्नी निधि आहूजा और बेटे लक्ष्य के साथ वैष्णो देवी यात्रा से लौट रहे थे। आशीष ने बताया कि लुधियाना से ट्रेन के चलने के बाद रात लगभग 3.30 बजे डकैतों ने मारपीट शुरू कर दी। निधि ने बताया कि एक बदमाश उनके कान की बाली छीनने लगा तो विरोध किया। उसने मुंह दबाकर पर्स छीन लिया और मारपीट करने लगा।
तीन बोगियों में पुलिस को तलाशा
इलाहाबाद निवासी वेदप्रकाश ने बताया कि बदमाश गुटों में थे और घूम-घूमकर यात्रियों के साथ मारपीट कर सामान छीन रहे थे। बैग, महिलाओं के पर्स, मोबाइल और कीमती सामान छीनकर बदमाश चलती ट्रेन से कूद कर भाग गए। बोगियों में तलाशते रहे पुलिस को लखनऊ के विकास नगर निवासी हिमांशु ने बताया कि उसका मोबाइल छीन लिया गया। राजापुर इलाहाबाद की डा. स्वाति श्रीवास्तव के पति मनीष सो रहे थे। डकैत स्वाति से सामान छीनने लगे तो उन्होंने विरोध किया। चाकू देख वह डर गईं और शोर तक नहीं मचा सकीं। स्वाति ने बताया कि डकैतों के जाने के बाद उन्होंने तीन बोगियों में दौड़ कर पुलिस को तलाशा, मगर कोई नहीं मिला।
सफाई कर्मी का चार्ट देकर चला गया टीटी
यात्रियों का कहना था कि ट्रेन के चलने के बाद टीटी एक सफाई कर्मी को चार्ट देकर चला गया, उसके बाद वह भी नहीं आया। इलाहाबाद के सुभाष चन्द्र पत्नी सुनीता और तीन बच्चों अंकिता, आकांक्षा के साथ थे। सुभाष परिवार समेत डकैतों का शिकार हुए। इलाहाबाद के अजय कुमार, पत्नी नंदा देवी से पांच हजार नकदी, दो मोबाइल लूट ले गए। यात्रियों का कहना था कि चार-पांच बार चेन पुलिंग की और गार्ड हर बार आगे शिकायत दर्ज कराने की बात कह ट्रेन चला देता था।
Jun 28 2017 (07:50)  डीएमयू में सफर किसी सजा से कम नहीं (epaper.jagran.com)
back to top
Commentary/Human InterestNR/Northern  -  

News Entry# 306735     
   Past Edits
Jun 28 2017 (07:50)
Station Tag: Udhampur/UHP added by जय जगन्नाथ🙏^~/1421836
Stations:  Udhampur/UHP  
 
 
अमित माही ’ ऊधमपुर1रेल यात्रियों के सफर को आरामदायक बनाने के लिए रेलवे अत्याधुनिक सुविधाओं से सुसज्जित रेल गाड़ियां चला रहा है। दूसरी तरफ दैनिक यात्रियों को नजरअंदाज किया जा रहा है। डीएमयू (डीजल मल्टीपल यूनिट) में आज भी मूलभूत सुविधाओं का अभाव है। लोग डीएमयू के जर्जर डिब्बों में बैठ कर सफर करने को विवश हैं, जिनकी अधिकांश सीटें दयनीय अवस्था में हैं। खिड़कियों के शीशे टूटे हुए हैं।1ऊधमपुर से जम्मू और पठानकोट के बीच चलने वाली डीएमयू ट्रेन दैनिक यात्रियों को सस्ता सफर तो उपलब्ध कराती है, लेकिन यह सफर आरामदायक या सुविधाजनक न होकर सजा का आभास करवाता है। डीएमयू ट्रेनों के रखरखाव के प्रति रेलवे का उपेक्षित रवैया कार्यप्रणाली पर प्रश्नचिह्न् लगा रहा है।1ऊधमपुर-जम्मू-पठानकोट के बीच चलने वाली डीएमयू का उचित रखरखाव नहीं हो रहा है, जिससे हर डिब्बे में बदहाली का आलम नजर आता है। हर डिब्बे में 40 से 50 सीटें फटी हुई हैं, जिसमें...
more...
से कई सीटों की फोम बाहर निकली हुई हैं। सीट कवर बुरी तरह फटे हुए हैं। कई सीटों पर टीन की चादर के ऊपर फोम लगाए बिना ही सीट कवर चस्पा कर दिया गया है, जिससे इन पर बैठ कर सफर करना किसी सजा से कम नहीं हैं। 1खिड़कियों के शीशे टूटे, लॉक भी खराब : ऊधमपुर-जम्मू-कटड़ा डीएमयू ट्रेन के हर डिब्बे में लगे शीशे व खिड़कियां बहुत ही दयनीय अवस्था में हैं, जिससे सर्दी और बरसात में यात्रियों को परेशानी का सामना करना पड़ता है। साथ ही हर डिब्बे में कई खिड़कियां ऐसी भी हैं, जिनके लॉक खराब हैं। 1ऊधमपुर नहीं, जालंधर में होती है रखरखाव : अन्य ट्रेनों का रखरखाव ऊधमपुर में कैरिज एंड वैगन विभाग करता है, लेकिन डीएमयू के रखरखाव ऊधमपुर की बजाय जालंधर में होता है। इसके लिए सप्ताह के प्रत्येक शुक्रवार को डीएमयू जालंधर जाती है। इसके बावजूद रखरखाव की स्थिति जस के तस हैं।ऊधमपुर से पठानकोट के बीच चलने वाली डीएमयू की खिड़की का गायब शीशा। (दाएं) ऊधमपुर में ट्रेन की खिड़की को खोलने के लिए अटकाई गई ईंटें ’ जागरणडीएमयू प्रत्येक सप्ताह में एक बार जालंधर मेंटीनेंस के लिए आती है। डीएमयू की ऐसी बदहाली की जानकारी उनको नहीं है। स्थिति की जानकारी प्राप्त की जाएगी और डीएमयू के कोचों का बेहतर रखरखाव कर यात्रियों की शिकायत दूर की जाएगी। पहले स्टाफ को लेकर कुछ समस्या थी, लेकिन अब कांट्रेक्चुअल आधार पर व्यवस्था कर इस समस्या का हल कर लिया गया है। इससे रखरखाव पर पहले से बेहतर ध्यान दिया जा सकेगा। 1एससी सौंखला, सीनियर डीएमई, शेड, जालंधर’>>डीएमयू बन ऊधमपुर से पठानकोट के बीच दौड़ रही बदहाली1’>>अधिकांश सीटें दयनीय अवस्था में खिड़कियों के शीशे हैं टूटे हुए
Page#    Showing 1 to 20 of 97 News Items  next>>

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.