Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

The train is a small world moving through a larger world - Niraj Kumar

Search Forum
<<prev entry    next entry>>
Blog Entry# 1804159
Posted: Apr 15 2016 (10:36)

6 Responses
Last Response: Apr 16 2016 (00:18)
General Travel
5102 views
0

Apr 15 2016 (10:36)   POY/Pollachi Junction (3 PFs)
 
Onemail~
Onemail~   6523 blog posts
Entry# 1804159            Tags  
Grievance Reply for Reintroduction of PGT RMM Train.
.
Pollachi-Palakkad section was recently opened for passenger traffic aftr gauge conversion and at present PGTN-POY-PLNI section are inadequate in infrastructure and yet to be developed. Re introduction of trains will be examined keeping in view operational feasibility and requirement
Translate to English
Translate to Hindi

1 Posts

3524 views
1

Apr 15 2016 (18:34)
krishnabalaji234~   99 blog posts
Re# 1804159-2              
Even I too requested the railways to operate more trains in PGTN - POY - PLNI section in the grievances portal. I too got the same reply which you got it.
Crores and crores of rupees are spent on PGTN - POY - PLNI broad gauge conversion, but it's very sad that this route is underutilized and even the existing trains are operated only as specials.
Translate to English
Translate to Hindi

2690 views
0

Apr 15 2016 (20:12)
Onemail~
Onemail~   6523 blog posts
Re# 1804159-3              
Clearly shows SR is not having any interest. It is just reintro of train, not new train. But this is the attitude of SR
Translate to English
Translate to Hindi

2886 views
2

Apr 15 2016 (20:22)
Ben_Kenobi~
Ben_Kenobi~   4222 blog posts
Re# 1804159-4              
not reintroducing old trains after GC is an unfortunate trend in IR. SWR for instance is replete with loads of examples where after GC many trains on VSG-LD-MRJ route never came back, despite more infrastructure and more loading/carrying capacity being available.
Translate to English
Translate to Hindi

2726 views
2

Apr 15 2016 (20:23)
12YEARSINIRI^~   11515 blog posts
Re# 1804159-5              
Then better they could have used this funds for electrifying CLT MAJN , at least one project would have been completed fully .now both are hanging in half way .
Translate to English
Translate to Hindi

2676 views
0

Apr 16 2016 (00:18)
Onemail~
Onemail~   6523 blog posts
Re# 1804159-6              
Exactly after spending crores of rs. Track is being used only for running few passenger special. Pgtn poy, poy palani. There is nothing beyond that.
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy