Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt

RailCal app

site support

RailFans don't miss their train. Why? Because they go to the station HOURS before the actual departure of their Train - to watch OTHER trains depart. - Prince Maan

Search Forum
<<prev entry    next entry>>
Blog Entry# 4556490
Posted: Feb 03 2020 (19:23)

7 Responses
Last Response: Feb 04 2020 (19:11)
Rail News
22169 views
0

IR Affairs
SER/South Eastern
Feb 03 2020 (19:23)   59 मिनट में 20 किमी चली राजधानी एक्सप्रेस

AdittyaaSharma^~   68282 news posts
Entry# 4556490   News Entry# 400342         Tags   Past Edits
मालगाड़ी के चक्कर में दिल्ली-भुवनेश्वर राजधानी एक्सप्रेस रविवार को आधे घंटे लेट से टाटानगर स्टेशन पहुंची। कांड्रा स्टेशन तक ट्रेन निश्चित समय से 20 मिनट बिफोर...

2 Posts

9234 views
1

Feb 03 2020 (23:27)
SumitParamanik^~
SumitParamanik^~   7030 blog posts
Re# 4556490-3              
Are aap ek baar is section m travel kijiye samajh jayenge .
1 month ago, Manikui outer m Ek frieght 30-40 metres p ek light loco fir same distance p ASN-TATA MEMU fir light loco fir DN BBS RAJDHANI & fir Light loco sab ruke hue Manikui Stn khali sunsan dopahar k 3 baje karib .
Ye haal CNI-MANIKUI k bich ka h fir aage to bahut kuch hai .
Aap
...
more...
PRR-CNI 54 km 45 min. m cover kr lenge but CNI-TATA 34 KM k liye 50-60 min. v kam lagte hai

Translate to English
Translate to Hindi

7196 views
3

Feb 04 2020 (11:45)
Soumyadeep~
Soumyadeep~   2349 blog posts
Re# 4556490-4               Past Edits
1. There is a need of quadruple section between KND and CNI else it won't be solved at all. Freight and passenger traffic will increase exponentially on that section. Double track is just a bottleneck.
2. Proposed Gamharia-Kandra fly over needs to be constructed soon.
3. More loop lines are required at Birarajpur to detain freights.
4. Gamharia-Tatanagar needs 4th and 5th
...
more...
line as per official proposal of SER.
Only with all these projects travel time between CNI-TATA can be reduced. CKP division has been very sluggish in executing projects of branch line.

Translate to English
Translate to Hindi

8908 views
0

Feb 04 2020 (18:43)
SumitParamanik^~
SumitParamanik^~   7030 blog posts
Re# 4556490-5              
Quad hole ho Controlling bhalo kore korte hobe tobe se din Kunki faka tobeo Manikui trains gulo aatkae rekheche
Translate to English
Translate to Hindi

7198 views
0

Feb 04 2020 (18:59)
Soumyadeep~
Soumyadeep~   2349 blog posts
Re# 4556490-6              
Quadruple hole fully automatic signalling system lagabe. Ekhon oi section er auto signalling er capacity kom.
Translate to English
Translate to Hindi

9624 views
0

Feb 04 2020 (19:11)
SumitParamanik^~
SumitParamanik^~   7030 blog posts
Re# 4556490-7              
Agree but tobeo eto kharap
Translate to English
Translate to Hindi
Scroll to Top
Scroll to Bottom
Go to Desktop site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy