मालगाड़ी के चक्कर में दिल्ली-भुवनेश्वर राजधानी एक्सप्रेस रविवार को आधे घंटे लेट से टाटानगर स्टेशन पहुंची। कांड्रा स्टेशन तक ट्रेन निश्चित समय से 20 मिनट बिफोर...
read more... 59 मिनट में 20 किमी चली राजधानी एक्सप्रेस
3 Public Posts - Mon Feb 03, 2020
1. There is a need of quadruple section between KND and CNI else it won't be solved at all. Freight and passenger traffic will increase exponentially on that section. Double track is just a bottleneck.
2. Proposed Gamharia-Kandra fly over needs to be constructed soon.
3. More loop lines are required at Birarajpur to detain freights.
4. Gamharia-Tatanagar needs 4th and 5th...
more...
2. Proposed Gamharia-Kandra fly over needs to be constructed soon.
3. More loop lines are required at Birarajpur to detain freights.
4. Gamharia-Tatanagar needs 4th and 5th...
more...