Full Site Search  
Wed Jan 24, 2018 13:11:42 IST
PostPostPost Stn TipPost Stn TipUpload Stn PicUpload Stn PicAdvanced Search
Large Station Board;
Close-up; Platform Pic; Large Station Board;

TBT/Talbahat (4 PFs)
     तालबेहट

Track: Double Electric-Line

Type of Station: Regular
Number of Platforms: 4
Number of Halting Trains: 17
Number of Originating Trains: 0
Number of Terminating Trains: 0
Khaniyadhana Station Rd Dist. Lalitpur
State: Uttar Pradesh
add/change address
Elevation: 313 m above sea level
Zone: NCR/North Central
Division: Jhansi
 
 
No Recent News for TBT/Talbahat
Nearby Stations in the News

Rating: 2.2/5 (15 votes)
cleanliness - good (2)
porters/escalators - poor (1)
food - poor (2)
transportation - average (2)
lodging - average (2)
railfanning - poor (2)
sightseeing - average (2)
safety - average (2)

Nearby Stations

DLA/Doulta 5 km     MZX/Matatila 5 km     BJA/Bijrotha 11 km     BZY/Basai 13 km     BPW/Burhpura 20 km     JHA/Jakhaura 20 km     BAB/Babina 25 km     DWA/Dailwara 30 km     KHJ/Khajraha 33 km     LAR/Lalitpur Junction 40 km    

Station News

Page#    Showing 1 to 2 of 2 News Items  
Aug 24 2016 (17:02)  Cabinet approves construction of third line between Jhansi and Bina (pib.nic.in)
News Entry# 278052   Blog Entry# 1971528     
   Past Edits
Aug 24 2016 (6:06PM)
Station Tag: Agasod Junction/AGD added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Bina Junction/BINA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Mohasa/MXS added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Lalitpur Junction/LAR added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Dailwara/DWA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Matatila/MZX added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Talbahat/TBT added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Basai/BZY added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Burhpura/BPW added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Babina/BAB added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Aug 24 2016 (6:06PM)
Station Tag: Jhansi Junction/JHS added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246
Posted by: riz339~  135 news posts
 
 
Ministry of Railways24-August, 2016 16:14 IST
Cabinet approves construction of third line between Jhansi and Bina
The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Shri Narendra Modi, has given its approval for construction of third line between Jhansi and Bina at an estimated cost of Rs.2001.63 crore and expected completion cost of Rs.2,273.84 crore.
The 152.57 km long railway
...
more...
line is expected to be completed in four years.
Besides facilitating the travel, goods trains passing through this section will get adequate capacity for smooth running. Jhansi and Lalitpur districts of Uttar Pradesh and Sagar district (Bina) of Madhya Pradesh will be covered by this line.
Background:
Jhansi-Bina section is a BG double line on New Delhi-Mumbai CST route. This project will enhance capacity, reduce detention and cater for future growth of traffic. At present, number of passenger and goods train in this section are far more than its capacity, resulting in heavy detention to trains.
*****
AKT/VBA/SH
(Release ID :149177)

9363 views
Aug 24 2016 (17:57)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10419 blog posts   14939 correct pred (63% accurate)
Re# 1971528-1            Tags   Past Edits
excellent
Jul 21 2016 (20:40)  बीना से झांसी रेलवे स्टेशन तक बनेगी तीसरी रेल लाइन (www.amarujala.com)
back to top
Commentary/Human InterestNCR/North Central  -  

News Entry# 274431   Blog Entry# 1936814     
   Past Edits
Jul 22 2016 (8:25PM)
Station Tag: Mandi Bamora/MABA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Matatila/MZX added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Talbahat/TBT added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Babina/BAB added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Basai/BZY added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Bina Junction/BINA added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 22 2016 (8:25PM)
Station Tag: Lalitpur Junction/LAR added by ® राहुल जैन ☺आम आदमी झाडू वाले™*^~/30246

Jul 21 2016 (8:40PM)
Station Tag: Jhansi Junction/JHS added by Saurabh*^~/15807

Jul 21 2016 (8:40PM)
Station Tag: Bina Junction/BINA added by Saurabh*^~/15807
 
 
ललितपुर। बीना-झांसी रेलखंड पर यातायात लगातार बढ़ने से हो रही दिक्कत को देखते हुए बीना से झांसी रेलवे स्टेशन के मध्य रेलवे द्वारा तीसरी रेल लाइन बनाने का निर्णय लिया गया है। तीसरी रेल लाइन के निर्माण के लिए 2001.90 करोड़ रुपये बजट को मंजूरी मिल गई है और रेलवे अधिकारियों द्वारा कागजी कार्रवाई शुरू कर दी गई है।
ललितपुर रेलवे स्टेशन पर रोजाना पैसेंजर और मालगाड़ी ट्रेन मिलाकर करीब दो सौ ट्रेनों का संचालन होता है। इसके साथ ही अब टीकमगढ़ से खजुराहो रेलवे स्टेशन तक ट्रेनों का संचालन शुरू होने पर ट्रेनों का ट्रैफिक और भी अधिक बढ़ जाऐगा। इसके चलते रेलवे द्वारा बीना से झांसी रेलवे स्टेशन तक रेलवे द्वारा सुचारु व सुगम रेल संचालन के लिए तीसरी रेल
...
more...
लाइन बनाए जाने का निर्णय लिया है। इसके लिए रेलवे द्वारा कागजी स्तर पर कार्य शुरू कर दिया गया है। लाइन के निर्माण के लिए जमीन का अधिग्रहण संबंधी काम की प्रक्रिया रेलवे ने शुरू कर दी है। बीना से झांसी के मध्य 20 रेलवे स्टेशन आऐंगे, ऐसे में बीना से झांसी तक 152.57 किलोमीटर लंबाई की तीसरी रेल लाइन का निर्माण के दौरान रेल लाइन पर 152 छोटे पुलों का निर्माण भी किया जाना है। इस लाइन के निर्माण में 2001.90 करोड़ रुपए लागत की योजना तैयार की गई है, जो पांच वर्ष में पूरा किए जाने का प्रस्ताव है।
तीसरी रेल लाइन के निर्माण के लिए रेलवे द्वारा योजना संबंधी कार्य शुरू कर दिया गया है। तीसरी रेल लाइन का निर्माण कार्य के तहत तीसरी लाइन निर्माण के लिए सर्वे कार्य और जमीन अधिग्रहण संबंधी प्रक्रिया शुरू कर दी गई है। लाइन के निर्माण कार्य शुरू होने में समय लगेगा।
- गिरीश कंचन, पीआरओ, रेलवे, झांसी।

7548 views
Jul 21 2016 (20:48)
Guest: 3b0faca5   show all posts
Re# 1936814-1            Tags   Past Edits
BINA-BRRG new rail line ka bhi kaam start hona chahiye...

8709 views
Jul 21 2016 (21:07)
REH RULZZZ~   202 blog posts
Re# 1936814-2            Tags   Past Edits
gud. priority k sath kaam hona chahiye

7698 views
Jul 21 2016 (22:26)
Udaipur Mysore HumSafar superfast^~   88583 blog posts   5328 correct pred (78% accurate)
Re# 1936814-3            Tags   Past Edits
Now Bina BPL triple line almost complete. So this is next project. Good work by IR

7646 views
Jul 21 2016 (22:39)
Guest: 2561914a   show all posts
Re# 1936814-4            Tags   Past Edits
Bina-kte ki trpling ka bhi tender ho chuka hai...

7718 views
Jul 21 2016 (22:41)
deepakrashikendra~   1209 blog posts
Re# 1936814-5            Tags   Past Edits
Habbibgaj Itarsi 3rd line work is also progressing well.

7826 views
Jul 21 2016 (23:40)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10419 blog posts   14939 correct pred (63% accurate)
Re# 1936814-6            Tags   Past Edits
Page#    Showing 1 to 2 of 2 News Items  

Scroll to Top
Scroll to Bottom


Go to Desktop site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.